If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-075-25610 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.6,"lon":-81.77,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Holmes | |
| Municipality: Salt Creek Township | |
| Operator Name: HG ENERGY LLC | |
| Well Pad ID: | |
| Farm/Lease Name: ELMER J & DORA A MILLER | |
| License Status: Final Restoration | |
| License Date: 2017-11-29 | |
| Spud Date: 2018-04-12 | |
| Spud Drilling Contractor: NOAH HORN DRILLING | |
| Final Drill Date: 2018-05-03 | |
| Well Total Depth: 6590.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.600000 | |
| Longitude: -81.770000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2017-11-29 | Proposed Formations:ROSE RUN, Issued Date:11/29/2017, Expired Date:11/29/2019 12:00:00 PM, Drilling unit acres:175.165, Proposed Well Type:OG, Proposed Well Class:EOUT |
| Correction to Well | 2018-02-23 | CORRECTION TO CASING PROGRAM. |
| Reached Total Depth | 2018-05-03 | |
| Plugged/Abandoned | 2018-07-13 | |
| Completion Report Received | 2018-07-19 | |
| Record Last Modified | 2018-07-24 | |
| Construction Permit Expires | 2019-11-29 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2018-07-24 | 6329 | 6392 | 98 |
| 6329 | 6392 | 98 | |
| 6329 | 6392 | 98 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2018-05-16 | ACID | 15 | 3000 Gal | 0 | Producers Service Corporation |
For data sources see[4]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1119229479 | 2018-4-23 0:00: | DD | No Violations | |
| -1355405393 | 2018-4-25 0:00: | DD | No Violations | |
| -157445412 | 2018-4-25 0:00: | DD | No Violations | 2.00 |
| -196636923 | 2018-4-12 0:00: | DD | No Violations | 1.50 |
| -668918191 | 2018-5-3 0:00:0 | DD | No Violations | 1.50 |
| -809357070 | 2018-4-9 0:00:0 | DD | No Violations | 1.50 |
| 0078751735 | 2018-05-14 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew running the bond log and perforating the well. The cement top was at 5222 feet. They will run 2 3/8 inch diameter tubing into the wellbore, and acid treat the well. |
| 0157445412 | 2018-04-25 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew was down for repairs, a cable on the top drive had broken. The repairs are being made. |
| 0185963611 | 2018-04-17 | Drill / Deepen / Reopen | No Violations | Arrived on location on 04/17/2018 to check on the status of drilling operations. The rig was down with compressor issues and waiting on repairs to drill the surface hole. No problems were noted at the time of the inspection. |
| 0189655111 | 2018-04-19 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew drilling ahead at a depth of 1145 feet. They will be ready to run intermediate 8 5/8 inch diameter casing this afternoon. |
| 0196636923 | 2018-04-12 | Drill / Deepen / Reopen | No Violations | On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details. |
| 0444237788 | 2018-05-18 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found that the swabbing has been completed. The well has been shut in until the week of May 28th and will then be re-evaluated. |
| 0585202627 | 2018-04-18 | Drill / Deepen / Reopen | No Violations | On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details. |
| 0668918191 | 2018-05-03 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew preparing to run 4 1/2 inch diameter casing into the wellbore. |
| 0809357070 | 2018-04-09 | Drill / Deepen / Reopen | No Violations | On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details. |
| 1107936850 | 2018-05-03 | Drill / Deepen / Reopen | No Violations | Arrived on location on 05/03/2018 to check on the status of operations. Noah Horn Well Drilling Rig #831 was pulling production casing from the well, as no marker joint was run, and preparing to re-run it back downhole. No problems were noted at the time of the inspection. |
| 1119229479 | 2018-04-23 | Drill / Deepen / Reopen | No Violations | Arrived on location on 04/23/2018 to check on the status of drilling operations. Noah Horn Well Drilling Rig #831 was drilling ahead at 5,073. No problems were noted at the time of the inspection. |
| 1190150472 | 2018-10-04 | Final Restoration | No Violations | On the day of my inspection, I found that the final restoration has been completed. The vegetation is continuing grow. A land owner waiver has not been received yet. The land is considered Organic and the land owner has seeded the location. A later inspection will be completed to pass the final restoration |
| 1265726132 | 2018-04-12 | Drill / Deepen / Reopen | No Violations | Arrived on location on 04/12/2018 to witness the concentric drilling and casing of the conductor hole. Noah Horn Well Drilling Rig #831 was rigged up on-site and preparing to spud. The 18 conductor casing was set at 100 (106.5 KB), ~35 into a hard, gray shale. Pits were dug and lined. Will shut down operations for the weekend. No problems were noted at the time of the inspection. |
| 1355405393 | 2018-04-25 | Drill / Deepen / Reopen | No Violations | Arrived on location on 04/25/2018 to check on the status of drilling operations. Noah Horn Well Drilling Rig #831 was circulating and loading the hole while shut-down waiting on a replacement hoist cable. No problems were noted at the time of the inspection. |
| 1387165676 | 2018-04-11 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I was accompanied by Inspector Jeff Adams. The rig crew is moving on location and rigging up. The will be ready to drill starting Thursday April 12,2018 |
| 1460496307 | 2018-04-19 | Drill / Deepen / Reopen | No Violations | On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details. |
| 1521546683 | 2018-03-20 | Drill / Deepen / Reopen | No Violations | I received an email from Roger Heldman with HE Energy that they were going to start construction on the well site. Upon arrival on location I found that the location has not yet been started. |
| 1523273135 | 2018-04-09 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I was accompanied by Inspector Jeff Adams. The well pad is almost complete. 85% of the pad has been stoned and the pits have not yet been dug. The rig is expected this week. |
| 1523552594 | 2018-04-12 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I was accompanied by Inspector Jeff Adams. I found the rig crew concentric drill 18 3/4 inch diameter casing. They were at a depth of 15 feet. |
| 1524053514 | 2018-04-17 | Drill / Deepen / Reopen | No Violations | On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details. |
| 1524072405 | 2018-04-18 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I was accompanied by Inspector Jeff Adams. The rig crew was preparing to run 11 3/4 inch diameter casing to 458 feet. The wellbore was drilled with a 14 3/4 inch diameter bit, to a depth of 538 feet. Lost circulation was pumped ahead and then 400 sacks of class A cement with 3 % calcium was pumped, and we had 16 1/2 bbl. of good cement returns to surface. The cement was displaced with 54 bbl. of fresh water. |
| 1524226579 | 2018-04-19 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew preparing to test the BOP. The blind rams were closed and pressured up to 500 psi. and held for 30 minutes. There was no drop-off in pressure. Drill pipe was run into the wellbore and the pipe rams were closed and pressured up to 500 psi. and held for 30 minutes. There was no drop off in pressure. The test passed. |
| 1524485970 | 2018-04-23 | Drill / Deepen / Reopen | No Violations | On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details. |
| 1524486128 | 2018-04-23 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I was accompanied by Inspector Jeff Adams. We found the rig crew drill ahead at a depth of 4831 feet. |
| 1524576331 | 2018-04-25 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew drilling ahead at 5713 feet. They are down to repair cable on top drive system. |
| 1524834694 | 2018-04-27 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew drilling ahead to a depth of 6590 feet. This is the Total depth of the well. The Wellbore will be conditioned and then a log will be run to evaluate the well. |
| 1525435549 | 2018-05-04 | Drill / Deepen / Reopen | No Violations | |
| 1526406282 | 2018-05-12 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew ready to acidize the well. Circulation was established and 500 gallon of 15 percent acid was spotted in the wellbore. The formation broke at 2096 PSI. Perf balls were then pumped with 2500 gallon of 15 percent acid. Well was shut inand then rigged up for flowback. |
| 1526481742 | 5018-05-16 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found the rig crew swabbing the well. They have recovered about 80 bbl. of fluid. The fluid level has been coincidently at 2350 feet. They are continuing to swab. |
| 1526562417 | 2018-05-17 | Production Wells | No Violations | Upon arrival on location I found the rig crew swabbing the well. Overnight the well had 200 pounds of pressure on the tubing, with the fluid level at 2300 feet. They are continuing to swab the well. |
| 1527862157 | 2018-06-01 | Drill / Deepen / Reopen | No Violations | Upon arrival; on location I found the rig crew rigging up and preparing to swab the well. The tubing had 250 psi. and the casing had 450 psi. The fluid level was at 3000 feet. After three pulls. The fluid level was at 4500 feet. It has been decided to plug and abandon the well. |
| 1529500021 | 2018-06-20 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I met with Hugh Palmer to discuss site reclamation and site erosion control to be used until vegetation is established. The drilling pits are being back filled today. The final restoration will not be completed until the well is plugged and abandon. |
| 1531404102 | 2018-07-12 | Plug / Plug Back | No Violations | Upon arrival on location I found the rig crew ready to start plugging. 2 3/8 inch diameter tubing was run to a depth of 6444. The bottom plug was set using 30 sacks of class A cement with 2 % gel. Circulation was established and the plug was pumped with a displacement of 23.5 bbl. of brine water. |
| 1531504270 | 2018-07-13 | Plug / Plug Back | No Violations | Upon arrival on location I found the rig crew ready to continue plugging. The 4 1/2 diameter casing was pulled to a depth of 4300 feet. Circulation was established, the cement was pumped using 90 sacks of class a cement with 2% gel. Circulation was established, the cement was pumped and displaced with 60 bbl. of salt water. The 4 1/2 inch diameter casing was then pulled to a depth of 2821 feet. Circulation was established, the cement was pumped, using 40 sacks of class A cement with 2% gel and displaced with 41 bbl. of salt water. The 4 1/2 inch diameter casing was then pulled to a depth of 1173 feet. Circulation was established, the cement was pumped, using 50 sacks of class A cement with 2% gel and displaced with 14.5 bbl. of fresh water. The 4 1/2 inch diameter casing was then pulled to a depth of 105 feet. Circulation was established, the cement was pumped using 40 sacks of class A cement with 2% gel, good cement returns to surface. |
| 1540814607 | 2018-10-29 0:00 | FR | No Violations | 1.00 |
| 1550589877 | 2018-04-11 | Drill / Deepen / Reopen | No Violations | On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details. |
| 1735068446 | 2018-04-18 | Drill / Deepen / Reopen | No Violations
-psi test was started, and there was some leakage in the supply line and some of the other test fittings. Some of the fitting were blocked off and the pressure held. The test was completed | |
| 185963611 | 2018-4-17 0:00: | DD | No Violations | |
| 189655111 | 2018-4-19 0:00: | DD | No Violations | 0.80 |
| 444237788 | 2018-5-18 0:00: | DD | No Violations | 0.80 |
| 585202627 | 2018-4-18 0:00: | DD | No Violations | 5.00 |
| 78751735 | 2018-5-14 0:00: | DD | No Violations | 2.30 |
For data sources see[5]