X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-075-25610

Well Details

Well ID: 34-075-25610
Loading map...
Country: United States
State: Ohio
County: Holmes
Municipality: Salt Creek Township
Operator Name: HG ENERGY LLC
Well Pad ID:
Farm/Lease Name: ELMER J & DORA A MILLER
License Status: Final Restoration
License Date: 2017-11-29
Spud Date: 2018-04-12
Spud Drilling Contractor: NOAH HORN DRILLING
Final Drill Date: 2018-05-03
Well Total Depth: 6590.00 ft
Configuration: Vertical
Latitude: 40.600000
Longitude: -81.770000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-11-29 Proposed Formations:ROSE RUN, Issued Date:11/29/2017, Expired Date:11/29/2019 12:00:00 PM, Drilling unit acres:175.165, Proposed Well Type:OG, Proposed Well Class:EOUT
Correction to Well 2018-02-23 CORRECTION TO CASING PROGRAM.
Reached Total Depth 2018-05-03
Plugged/Abandoned 2018-07-13
Completion Report Received 2018-07-19
Record Last Modified 2018-07-24
Construction Permit Expires 2019-11-29

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-07-24 6329 6392 98
6329 6392 98
6329 6392 98

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-05-16 ACID 15 3000 Gal 0 Producers Service Corporation

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1119229479 2018-4-23 0:00: DD No Violations
-1355405393 2018-4-25 0:00: DD No Violations
-157445412 2018-4-25 0:00: DD No Violations 2.00
-196636923 2018-4-12 0:00: DD No Violations 1.50
-668918191 2018-5-3 0:00:0 DD No Violations 1.50
-809357070 2018-4-9 0:00:0 DD No Violations 1.50
0078751735 2018-05-14 Drill / Deepen / Reopen No Violations Upon arrival on location I found the rig crew running the bond log and perforating the well. The cement top was at 5222 feet. They will run 2 3/8 inch diameter tubing into the wellbore, and acid treat the well.
0157445412 2018-04-25 Drill / Deepen / Reopen No Violations Upon arrival on location I found the rig crew was down for repairs, a cable on the top drive had broken. The repairs are being made.
0185963611 2018-04-17 Drill / Deepen / Reopen No Violations Arrived on location on 04/17/2018 to check on the status of drilling operations. The rig was down with compressor issues and waiting on repairs to drill the surface hole. No problems were noted at the time of the inspection.
0189655111 2018-04-19 Drill / Deepen / Reopen No Violations Upon arrival on location I found the rig crew drilling ahead at a depth of 1145 feet. They will be ready to run intermediate 8 5/8 inch diameter casing this afternoon.
0196636923 2018-04-12 Drill / Deepen / Reopen No Violations On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details.
0444237788 2018-05-18 Drill / Deepen / Reopen No Violations Upon arrival on location I found that the swabbing has been completed. The well has been shut in until the week of May 28th and will then be re-evaluated.
0585202627 2018-04-18 Drill / Deepen / Reopen No Violations On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details.
0668918191 2018-05-03 Drill / Deepen / Reopen No Violations Upon arrival on location I found the rig crew preparing to run 4 1/2 inch diameter casing into the wellbore.
0809357070 2018-04-09 Drill / Deepen / Reopen No Violations On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details.
1107936850 2018-05-03 Drill / Deepen / Reopen No Violations Arrived on location on 05/03/2018 to check on the status of operations. Noah Horn Well Drilling Rig #831 was pulling production casing from the well, as no marker joint was run, and preparing to re-run it back downhole. No problems were noted at the time of the inspection.
1119229479 2018-04-23 Drill / Deepen / Reopen No Violations Arrived on location on 04/23/2018 to check on the status of drilling operations. Noah Horn Well Drilling Rig #831 was drilling ahead at 5,073. No problems were noted at the time of the inspection.
1190150472 2018-10-04 Final Restoration No Violations On the day of my inspection, I found that the final restoration has been completed. The vegetation is continuing grow. A land owner waiver has not been received yet. The land is considered Organic and the land owner has seeded the location. A later inspection will be completed to pass the final restoration
1265726132 2018-04-12 Drill / Deepen / Reopen No Violations Arrived on location on 04/12/2018 to witness the concentric drilling and casing of the conductor hole. Noah Horn Well Drilling Rig #831 was rigged up on-site and preparing to spud. The 18 conductor casing was set at 100 (106.5 KB), ~35 into a hard, gray shale. Pits were dug and lined. Will shut down operations for the weekend. No problems were noted at the time of the inspection.
1355405393 2018-04-25 Drill / Deepen / Reopen No Violations Arrived on location on 04/25/2018 to check on the status of drilling operations. Noah Horn Well Drilling Rig #831 was circulating and loading the hole while shut-down waiting on a replacement hoist cable. No problems were noted at the time of the inspection.
1387165676 2018-04-11 Drill / Deepen / Reopen No Violations Upon arrival on location I was accompanied by Inspector Jeff Adams. The rig crew is moving on location and rigging up. The will be ready to drill starting Thursday April 12,2018
1460496307 2018-04-19 Drill / Deepen / Reopen No Violations On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details.
1521546683 2018-03-20 Drill / Deepen / Reopen No Violations I received an email from Roger Heldman with HE Energy that they were going to start construction on the well site. Upon arrival on location I found that the location has not yet been started.
1523273135 2018-04-09 Drill / Deepen / Reopen No Violations Upon arrival on location I was accompanied by Inspector Jeff Adams. The well pad is almost complete. 85% of the pad has been stoned and the pits have not yet been dug. The rig is expected this week.
1523552594 2018-04-12 Drill / Deepen / Reopen No Violations Upon arrival on location I was accompanied by Inspector Jeff Adams. I found the rig crew concentric drill 18 3/4 inch diameter casing. They were at a depth of 15 feet.
1524053514 2018-04-17 Drill / Deepen / Reopen No Violations On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details.
1524072405 2018-04-18 Drill / Deepen / Reopen No Violations Upon arrival on location I was accompanied by Inspector Jeff Adams. The rig crew was preparing to run 11 3/4 inch diameter casing to 458 feet. The wellbore was drilled with a 14 3/4 inch diameter bit, to a depth of 538 feet. Lost circulation was pumped ahead and then 400 sacks of class A cement with 3 % calcium was pumped, and we had 16 1/2 bbl. of good cement returns to surface. The cement was displaced with 54 bbl. of fresh water.
1524226579 2018-04-19 Drill / Deepen / Reopen No Violations Upon arrival on location I found the rig crew preparing to test the BOP. The blind rams were closed and pressured up to 500 psi. and held for 30 minutes. There was no drop-off in pressure. Drill pipe was run into the wellbore and the pipe rams were closed and pressured up to 500 psi. and held for 30 minutes. There was no drop off in pressure. The test passed.
1524485970 2018-04-23 Drill / Deepen / Reopen No Violations On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details.
1524486128 2018-04-23 Drill / Deepen / Reopen No Violations Upon arrival on location I was accompanied by Inspector Jeff Adams. We found the rig crew drill ahead at a depth of 4831 feet.
1524576331 2018-04-25 Drill / Deepen / Reopen No Violations Upon arrival on location I found the rig crew drilling ahead at 5713 feet. They are down to repair cable on top drive system.
1524834694 2018-04-27 Drill / Deepen / Reopen No Violations Upon arrival on location I found the rig crew drilling ahead to a depth of 6590 feet. This is the Total depth of the well. The Wellbore will be conditioned and then a log will be run to evaluate the well.
1525435549 2018-05-04 Drill / Deepen / Reopen No Violations
1526406282 2018-05-12 Drill / Deepen / Reopen No Violations Upon arrival on location I found the rig crew ready to acidize the well. Circulation was established and 500 gallon of 15 percent acid was spotted in the wellbore. The formation broke at 2096 PSI. Perf balls were then pumped with 2500 gallon of 15 percent acid. Well was shut inand then rigged up for flowback.
1526481742 5018-05-16 Drill / Deepen / Reopen No Violations Upon arrival on location I found the rig crew swabbing the well. They have recovered about 80 bbl. of fluid. The fluid level has been coincidently at 2350 feet. They are continuing to swab.
1526562417 2018-05-17 Production Wells No Violations Upon arrival on location I found the rig crew swabbing the well. Overnight the well had 200 pounds of pressure on the tubing, with the fluid level at 2300 feet. They are continuing to swab the well.
1527862157 2018-06-01 Drill / Deepen / Reopen No Violations Upon arrival; on location I found the rig crew rigging up and preparing to swab the well. The tubing had 250 psi. and the casing had 450 psi. The fluid level was at 3000 feet. After three pulls. The fluid level was at 4500 feet. It has been decided to plug and abandon the well.
1529500021 2018-06-20 Drill / Deepen / Reopen No Violations Upon arrival on location I met with Hugh Palmer to discuss site reclamation and site erosion control to be used until vegetation is established. The drilling pits are being back filled today. The final restoration will not be completed until the well is plugged and abandon.
1531404102 2018-07-12 Plug / Plug Back No Violations Upon arrival on location I found the rig crew ready to start plugging. 2 3/8 inch diameter tubing was run to a depth of 6444. The bottom plug was set using 30 sacks of class A cement with 2 % gel. Circulation was established and the plug was pumped with a displacement of 23.5 bbl. of brine water.
1531504270 2018-07-13 Plug / Plug Back No Violations Upon arrival on location I found the rig crew ready to continue plugging. The 4 1/2 diameter casing was pulled to a depth of 4300 feet. Circulation was established, the cement was pumped using 90 sacks of class a cement with 2% gel. Circulation was established, the cement was pumped and displaced with 60 bbl. of salt water. The 4 1/2 inch diameter casing was then pulled to a depth of 2821 feet. Circulation was established, the cement was pumped, using 40 sacks of class A cement with 2% gel and displaced with 41 bbl. of salt water. The 4 1/2 inch diameter casing was then pulled to a depth of 1173 feet. Circulation was established, the cement was pumped, using 50 sacks of class A cement with 2% gel and displaced with 14.5 bbl. of fresh water. The 4 1/2 inch diameter casing was then pulled to a depth of 105 feet. Circulation was established, the cement was pumped using 40 sacks of class A cement with 2% gel, good cement returns to surface.
1540814607 2018-10-29 0:00 FR No Violations 1.00
1550589877 2018-04-11 Drill / Deepen / Reopen No Violations On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details.
1735068446 2018-04-18 Drill / Deepen / Reopen No Violations

-psi test was started, and there was some leakage in the supply line and some of the other test fittings. Some of the fitting were blocked off and the pressure held. The test was completed

185963611 2018-4-17 0:00: DD No Violations
189655111 2018-4-19 0:00: DD No Violations 0.80
444237788 2018-5-18 0:00: DD No Violations 0.80
585202627 2018-4-18 0:00: DD No Violations 5.00
78751735 2018-5-14 0:00: DD No Violations 2.30

For data sources see[5]

References