34-079-20262

Well Details

Well ID: 34-079-20262
Loading map...
Country: United States
State: Ohio
County: Jackson
Municipality: Madison Township
Operator Name: KNOX ENERGY INC.
Well Pad ID:
Farm/Lease Name: S & D ENTERPRISES
License Status: Final Restoration
License Date: 2012-07-24
Spud Date: 2008-04-29
Spud Drilling Contractor: HIGHLAND DRLG
Final Drill Date: 2008-05-06
Well Total Depth: 4876.00 ft
Configuration: Directional
Latitude: 38.880000
Longitude: -82.550000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-04-25 Proposed Formations:OHIO SHALE, Issued Date:4/25/2008, Expired Date:4/25/2009 6:00:00 AM, Drilling unit acres:51.95, Proposed Well Type:OG, Proposed Well Class:ENPW
Reached Total Depth 2008-05-06
Correction to Well 2008-06-06 ADDED TARGET INFORMATION TO PERMIT (MISSING FROM PREVIOUSLY ISSUED PERMIT)/TARGET INFORMATION: FOOTAGE= 390'NL & 1215'WL OF SW QTR, SEC. 30; X= 1,981,080;Y= 323,280; ELEV.= 823'.
Completion Report Received 2009-01-09
Correction to Well 2009-01-23 CORRECTION TO TARGET INFORMATION: NEW FOOTAGE= 400'NL & 1225'WL OF SW QTR., SEC. 30; NEW X=1,981,090; NEW Y= 323,275; NEW TARGET ELEVATION= 825'. UNIT SIZE DECREASED TO 51.78 ACRES.
Change of Owner 2009-11-30 Operator changed from 8334, UNBRIDLED ENERGY OHIO LLC to 6295, KNOX ENERGY INC.
APP 2010-07-01 Proposed Formations:OHIO SHALE, Issued Date:7/1/2010, Expired Date:7/1/2011 6:00:00 AM, Drilling unit acres:51.78, Proposed Well Type:OG, Proposed Well Class:
APP 2012-07-24 Proposed Formations:OHIO SHALE, Issued Date:7/24/2012, Expired Date:7/24/2014 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2012-09-17
Construction Permit Expires 2014-07-24
Record Last Modified 2017-02-15

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
N2 0 1001 Mscf 0 STAGE 2 OF 7
N2 0 1001 Mscf 0
N2 0 1003 Mscf 0 STAGE 6 OF 7
N2 0 1200 Mscf 0 STAGE 1 OF 7
N2 0 1002 Mscf 0 STAGE 4 OF 7
N2 0 1002 Mscf 0 STAGE 5 OF 7
N2 0 1002 Mscf 0 STAGE 3 OF 7

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 UNBRIDLED ENERGY OHIO LLC 0.00 0.00 0
2010 KNOX ENERGY INC. 0.00 0.00 0
2011 KNOX ENERGY INC. 0.00 0.00 0

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 UNBRIDLED ENERGY OHIO LLC Brine 0 0
2010 KNOX ENERGY INC. Brine 0 0
2011 KNOX ENERGY INC. Brine 0 0

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1144367559 2012-9-14 0:00: PB No Violations 6.50
-1686909996 2012-9-12 0:00: PB No Violations 3.00
-211910661 2012-9-17 0:00: PB No Violations 1.50
-45588986 2012-9-17 0:00: PB No Violations 3.00
-923596264 2012-9-13 0:00: PB No Violations 10.00
0045588986 2012-09-17 Plug / Plug Back No Violations Met Jon Scott at this well to check on cement level of the surface plug in the surface csg after the weekend. Top of cement was about four feet below the top of this casing and about 30 inches below ground surface.
0211910661 2012-09-17 Plug / Plug Back No Violations Cement is at surface 20 bellow grade. Pit has been filled in. Wellhead has not been cut off. Accompanied by Morgan Button MRI 2. Access road gate was locked. We walked to location.
0458439499 2010-03-01 Administrative Inspection No Violations Called and talked to Terry Wade at 11:40am Re: Well needs identification. I also requested a written time line on getting the well in production or plugged. Terry said that they have not had a chance since taking over the wells to evaluate and see if it is capable or needs plugged. Terry told me that Bill Mitton is on vacation and will be back in a week. He will have Bill get in touch with me.
0554213431 2009-10-06 Preliminary Restoration No Violations Good id. Site is graded with good vegetative cover growing. The well site is all gravel. Well is equipped with tubing. No production equipment or lines were on location.
0592700677 2010-03-08 Administrative Inspection No Violations Received call from Bill Mitton. 3:20pm Re: will get identification on wells this week. Bill told me that they will plug the well this spring.
0763055173 2012-09-13 Plug / Plug Back No Violations Appalachian Well Surveys ran a bond log on the 4.5 casing. Packer inside 7 casing at 1095. Used casing cutter inside 4.5 casing at 1721 Measured depth. BJ Hughes Packer required 74,000 pounds to release it. While pulling 4.5 casing Brine flowed into lined pit. Packer was swabbing the well as casing was being pulled to surface. Wire line set a mechanical bridge plug in 6.25 wellbore at 1700 feet.
0923596264 2012-09-13 Plug / Plug Back No Violations Appalachian Well Survey on location and rigging up to run GR-CLL-VDL. Went to 2000 an logged hole. Survey found packer on 4-1/2 inch csg deployed in the 7-inch surface csg @ 1095. Decision was made to run casing cutter in hole and shoot the 4-1/2 csg at 1721 MTD. Cut csg. Slowly applied 75,000 lbs pull on 4-1/2 csg until packer at 1095 released. Started to bring 4-1/2 csg out after two joints foamy fluid started coming out between the 7-inch and 4-1/2 csgs. After removing 26 joints well unloaded gas and water blowing to the crown for a few minutes and then died. Got all 4-1/2 csg out from 1721. Packer at 1095 was Baker-Hughes. $-1/2 csg was in good shape. Went back to 1700 and set a bridge plug as a footing to the plugs this well. Shut down for night.
1030907426 2012-09-14 Plug / Plug Back No Violations Ran 1690 feet of 1.5 tubing. Conditioned open hole with gel and Lost Circulation Material (Flake and Cotton seed hulls) Set bottom plug in two stages from 1690 Pulled 10 joints tubing (average 33 each) Plug top 1090. Waited on cement 35 minutes no fluid loss at the surface inside casing. Pulled tubing to 110 and circulated cement to surface. Cement stayed at the surface.
1142645850 2012-09-12 Plug / Plug Back No Violations Arrived at the location. Berry Well Services service rig was set up and pulling the 1-1/2 inch production tubing. Pulled 61 joints including the approximately 20 mud anchor. Based on an average length there was about approximately 2000 feet. Went back down hole with a sand bailer attached to cable sounding for a port. Pulling this string back to surface didnt find anything from 1350 feet below ground surface to the surface. Went back into the well and went deeper to 1500 feet with the same assembly. Still found nothing. Placed cap on csg and called it a day.
1144367559 2012-09-14 Plug / Plug Back No Violations Started setting 1-1/2 inch tubing and went to 1690 to start conditioning the hole. Formation Cementing arrived on location and set up for plugging. Jon laid out a plan to plug the well, Everyone agreed. Started by using gel and LCM Cellophane (Flake) to condition the bottom of the hole above the plug set last night. This hopefully will help to seal off openings in the Ohio Shale and let the first cement plug stay without losing it in the formation. It went like clock work and finished the job around 1200 hrs topping cement close to the surface. It looks like surface cement was holding. Jon stayed to get Formations plugging report. I left.
1213641230 2008-06-09 Completion Testing Violations Noted Well has been blown back with out piping to the pit. This resulted in a high level brine being sprayed on the surface around the wellhead. The brine was off the chart for the high end Quantabs. The brine was bright orange in color. A 15 by 10 by 4 deep puddle of brine was collected near the pit. Wellhead is covered with gravel and the brine can be seen running out from under the gravel. The brine flow heads toward the puddle mentioned above. I informed the men overseeing the well that this must be cleaned up. Drill pit liner has fallen in on two places. Liner needs to be fixed or replaced.
1289949973 2015-03-03 Final Restoration No Violations Final Restoration requirements met.
1347973463 2012-09-11 Plug / Plug Back No Violations Tried to contact JD (Berry Well Services about the plugging status of this well and Rapier D1-16-3541 (API .34-079-20261)
1352703846 2008-04-30 Drill / Deepen / Reopen No Violations Spud 4-29-08. Equitable Drilling is overseeing the project. Highland Rig #5 is drilling the well. Rig is a Speed Star 185. BJ is cementing. Weatherford is Logging the hole. 80 9 5/8 conductor set in a 12 7/8 hole. TD 1222. 1192 of 7 in a 8 7/8 hole. Basket Depths 49 and 89. I was un able to witness the cement job due to a Pipe Line Safety Training in Athens.
1488314487 2008-06-09 Administrative Inspection No Violations Talked to Bob Reel from Equitable. He is seeing to the clean up and the pumping of the pit. He said that they will pipe tubing over to the drill pit and discharge into the pit. They are arranging some equipment right now.
1686909996 2012-09-12 Plug / Plug Back No Violations Berry well service is rigged up and pulling tubing. Accompanied by Morgan Button MRI 2.
458439499 2010-3-1 0:00:0 AM No Violations
554213431 2009-10-6 0:00: PL No Violations
592700677 2010-3-8 0:00:0 AM No Violations
763055173 2012-9-13 0:00: PB No Violations 8.00

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1213641230 US-OH-105605 2008-06-16 Pollution and contamination
1213641230 US-OH-105606 2008-06-16 Pit incapable of preventing escape of brine or other wastes

For data sources see[8]

References