If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-079-20267 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.05,"lon":-82.51,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jackson | |
Municipality: Milton Township | |
Operator Name: TOMSTAN DRILLING COMPANY | |
Well Pad ID: | |
Farm/Lease Name: J MORROW ETAL | |
License Status: Final Restoration | |
License Date: 2009-01-29 | |
Spud Date: 2009-01-29 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2009-02-12 | |
Well Total Depth: 1984.00 ft | |
Configuration: Vertical | |
Latitude: 39.050000 | |
Longitude: -82.510000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-01-29 | Proposed Formations:BIG LIME, Issued Date:1/29/2009, Expired Date:1/29/2010 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:ST, Proposed Well Class:O |
Reached Total Depth | 2009-02-12
-SO | |
Plugged Back | 2009-02-14
-SO | |
Construction Permit Expires | 2010-01-29
-SO | |
Completion Report Received | 2010-04-07
-SO | |
Record Last Modified | 2017-02-14
-SO |
For data sources see[2]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | TOMSTAN DRILLING COMPANY | Brine | 0 | 120 |
2011 | TOMSTAN DRILLING COMPANY | Brine | 0 | 120 |
2012 | TOMSTAN DRILLING COMPANY | Brine | 0 | 120 |
2013 | TOMSTAN DRILLING COMPANY | Brine | 0 | 0 |
2014 | TOMSTAN DRILLING COMPANY | Brine | 0 | 0 |
2015 | TOMSTAN DRILLING COMPANY | Brine | 0 | 0 |
2016 | TOMSTAN DRILLING COMPANY | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-103470789 | 2009-2-11 0:00: | AM | No Violations | |
-1191651610 | 2009-5-20 0:00: | PL | No Violations | |
-1441192134 | 2009-3-9 0:00:0 | DD | No Violations | |
-1723395139 | 2014-3-26 0:00: | PW | No Violations | 5.50 |
-2000073997 | 2009-2-5 0:00:0 | DD | No Violations | |
-2067939885 | 2009-8-10 0:00: | PL | No Violations | |
-295622640 | 2009-2-11 0:00: | AM | No Violations | |
-685229925 | 2010-8-24 0:00: | PW | No Violations | 1.00 |
-887848291 | 2009-4-28 0:00: | DD | No Violations | |
-961450638 | 2012-9-26 0:00: | PW | No Violations | 1.00 |
0051593346 | 2015-05-12 | Production Wells | No Violations | Well equipped with a pumping unit. No noted violations. |
0103470789 | 2009-02-11 | Administrative Inspection | No Violations | I returned phone call to Chris Smith ODNR Wildlife. Chris wanted to know status of drilling and expressed concerns over the access roads condition (ruts and loss of stone). I told Chris that I have told Stan Holler (Well owner) that he must fix the road as part of the restoration. I informed Chris of the damage to the AML rock channel near the well site GPS N39.05982 / W082.51196. |
0186385097 | 2009-02-17 | Drill / Deepen / Reopen | No Violations | Pits look good. Rig is idle and not drilling due to horizontal equipment problems. Drill hands did not have a copy of the plug back information for me. I will contact Stan Holler (Owner) for the plug back information. |
0295622640 | 2009-02-11 | Administrative Inspection | No Violations | Phone call to Stan Holler Re: Where is kick off point for horizontal drilling? How far are going to plug back? Stan told me they will plug back solid from the Big Lime to the kick off point. The kick off point has not been determined yet they are going to log the hole and then determine the kick off point. |
0319150478 | 2009-12-14 | Production Wells | No Violations | No identification. No production equipment or production lines. Stan Holler (well owner) is bidding out the production line work and has not started on the project yet. Stan has asked if he could install the id at the same time as the production equipment and production lines. I called Stan and have requested a written time line for when the wells will be in production. |
0685229925 | 2010-08-24 | Production Wells | No Violations | Pump jack being installed on well. Well is equipped with rods and tubing. Gas engine. No identification. |
0820629359 | 2009-10-08 | Preliminary Restoration | No Violations | Good vegetative cover on location. No identification, No production equipment or production lines. I called Stan Holler Well owner and Stan has asked to be allowed to install the id when he installs the production lines. I agreed as long as it happens soon. |
0887848291 | 2009-04-28 | Drill / Deepen / Reopen | No Violations | Solidify pit with bulk cement from Schlumberger. 150 sacs. |
0910474338 | 2009-02-10 | Drill / Deepen / Reopen | No Violations | On site meeting with Cathy Hoobler ODNR AML. To verify that drill site is in compliance with Permit conditions specified by AML. Every thing meets their specifications. I showed Cathy the rock channel that was damaged by the timber activity. The rock channel is near the well site. |
0961450638 | 2012-09-26 | Production Wells | Violations Noted | Good well identification sign. No production reported from operator for well since completion date 2-25-2009. Well not producing. 1509.062A: Nonproduction; well shall be plugged or produced. Presently there is a pumping unit and three 110 barrels tanks in a beamed tank battery for this well. |
1191651610 | 2009-05-20 | Preliminary Restoration | No Violations | Site has been graded. Looks good. No seed or mulch has been applied to the site. No identification, no production equipment or production lines. |
1239904250 | 2009-02-03 | Drill / Deepen / Reopen | No Violations | Installing sediment fence per permit conditions. Killbarger doing the work. They used a dozer to scrape the snow off the path around the perimeter of drill site. They were careful not to cut into the soil. A skid steer with a trenching attachment was used to cut a 6-8 trench for the sediment fence. The sediment fence was then installed per BMP instructions. Top soil has been segregated per permit conditions. |
1240336555 | 2009-02-11 | Drill / Deepen / Reopen | No Violations | Surface Cement job. Spud 2-9-09. Hit water in Big Injun. Set 35 of 11 3/4conductor. 1095 of 8 5/8 surface casing. Good circulation and had cement returns to surface. |
1441192134 | 2009-03-09 | Drill / Deepen / Reopen | No Violations | Kilbarger rig pulled off 2-27-09 and went to finish the horizontal portion of the Morrow #2. Pitts are full and need to be pumped down and then solidify per permit requirements. Garbage has been left on location. I called Stan Holler and He sent his business partner Tom out to clean up the site. I returned to site before I left the property and the trash had been cleaned up. |
1581601707 | 2009-10-08 | Preliminary Restoration | No Violations | This is the horizontal portion of well # 34-079-20267. Preliminary Restoration passed on 10-8-09 |
1619600261 | 2009-02-10 | Drill / Deepen / Reopen | No Violations | Received a call from Gerald Smith (Killbarger tool pusher) that the pit liner had been damaged by high pressure air and cuttings while drilling at 300 feet. I arrived on location to witness the damage and to observe the new pit liner installation. Fluid was pumped out of drill pit and into mud pit. New pit liner was installed over top of damaged liner. Drilling resumed. |
1723395139 | 2014-03-26 | Production Wells | No Violations | Upon arriving at this site, I reviewed the production records for this well and found them to be current for 2012. This satisfies the requirements for compliance with the issued violation. Upon inspection, it was observed that this well is shut in, but is capable of production. |
186385097 | 2009-2-17 0:00: | DD | No Violations | |
2000073997 | 2009-02-05 | Drill / Deepen / Reopen | No Violations | Sediment fence installation is complete. Fence looks good. Pit location has been established. Will wait to dig pit until finished with the Morrow #2 well. |
2067939885 | 2009-08-10 | Preliminary Restoration | No Violations | Good vegetative cover on well site. No erosion at this time. I called Stan Holler at 9:30am and we discussed the need to identify well and equip well for production. |
319150478 | 2009-12-14 0:00 | PW | No Violations | |
51593346 | 2015-5-12 0:00: | PW | No Violations | 5.00 |
820629359 | 2009-10-8 0:00: | PL | No Violations | |
910474338 | 2009-2-10 0:00: | DD | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0961450638 | US-OH-131003 | 2012-12-24 | Nonproduction; well shall be plugged or placed in temporary inactive status | |
0961450638 | US-OH-131004 | 2012-12-24 | Statement of annual production not filed |
For data sources see[5]