If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-081-20489 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.44,"lon":-80.75,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Jefferson | |
| Municipality: Island Creek Township | |
| Operator Name: ERIC PETROLEUM CORP | |
| Well Pad ID: | |
| Farm/Lease Name: DENOON | |
| License Status: Producing | |
| License Date: 2008-01-07 | |
| Spud Date: 2008-02-12 | |
| Spud Drilling Contractor: WARREN DRLG | |
| Final Drill Date: 2008-02-18 | |
| Well Total Depth: 5195.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.440000 | |
| Longitude: -80.750000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2008-01-07 | Proposed Formations:BIG LIME, Issued Date:1/7/2008, Expired Date:1/6/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW |
| Correction to Well | 2008-02-01 | CHANGE IN TOTAL DEPTH TO 5300' AND CHANGE IN PROPOSED FORMATION TO "ORISKANY" PER REQUEST OF OPERATOR. |
| Reached Total Depth | 2008-02-18 | |
| Completion Report Received | 2008-09-25 | |
| Construction Permit Expires | 2009-01-06 | |
| Correction to Well | 2010-07-16 | INCREASE UNIT SIZE TO 640 ACRES. |
| Record Last Modified | 2015-09-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2010-03-01 | 4812 | 4818 | 24 |
| 2010-03-01 | 4908 | 4928 | 80 |
| 4812 | 4818 | 24 | |
| 4908 | 4928 | 80 | |
| 4812 | 4818 | 24 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 1105000 Gal | 591900 | TREATED AT 120 BPM |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | ERIC PETROLEUM CORP | 0.00 | 0.00 | 0 |
| 2009 | ERIC PETROLEUM CORP | 9380.00 | 158.00 | 0 |
| 2010 | ERIC PETROLEUM CORP | 6725.00 | 171.00 | 365 |
| 2011 | ERIC PETROLEUM CORP | 9103.00 | 169.00 | 365 |
| 2012 | ERIC PETROLEUM CORP | 3382.00 | 0.00 | 366 |
| 2013 | ERIC PETROLEUM CORP | 3166.00 | 125.00 | 365 |
| 2014 | ERIC PETROLEUM CORP | 3462.00 | 0.00 | 365 |
| 2015 | ERIC PETROLEUM CORP | 730.00 | 0.00 | 365 |
| 2016 | ERIC PETROLEUM CORP | 2109.00 | 0.00 | 365 |
| 2017 | ERIC PETROLEUM CORP | 4851.00 | 0.00 | 365 |
| 2018 | ERIC PETROLEUM CORP | 4579.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | ERIC PETROLEUM CORP | Brine | 0 | 0 |
| 2009 | ERIC PETROLEUM CORP | Brine | 3851 | 0 |
| 2010 | ERIC PETROLEUM CORP | Brine | 789 | 365 |
| 2011 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
| 2012 | ERIC PETROLEUM CORP | Brine | 165 | 366 |
| 2013 | ERIC PETROLEUM CORP | Brine | 150 | 365 |
| 2014 | ERIC PETROLEUM CORP | Brine | 150 | 365 |
| 2015 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
| 2016 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
| 2017 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
| 2018 | ERIC PETROLEUM CORP | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1243377465 | 2008-2-11 0:00: | DD | No Violations | 1.00 |
| -1318542860 | 2008-1-24 0:00: | DD | No Violations | 1.00 |
| -165468106 | 2008-2-29 0:00: | DD | No Violations | 1.50 |
| -2006949548 | 2008-3-11 0:00: | DD | No Violations | 1.50 |
| -304156727 | 2008-7-2 0:00:0 | CT | No Violations | 1.00 |
| -35990735 | 2008-2-5 0:00:0 | DD | No Violations | 1.50 |
| -70042372 | 2008-2-12 0:00: | DD | No Violations | 1.50 |
| -797629026 | 2008-2-7 0:00:0 | DD | No Violations | 1.00 |
| -977588674 | 2010-3-17 0:00: | PL | No Violations | 1.00 |
| 0035990735 | 2008-02-05 | Drill / Deepen / Reopen | No Violations | Inspection revealed that they are building location at this time. Warren Drilling is suppose to be moving onto location any day now. No violations at this time. |
| 0070042372 | 2008-02-12 | Drill / Deepen / Reopen | No Violations | Inspection revealed that Warren Drilling is finishing moving onto location and they are finishing the digging of the drilling pits. They advised that they should spud the well later this evening. No violations at this time. |
| 0165468106 | 2008-02-29 | Drill / Deepen / Reopen | No Violations | Inspection revealed that Warren drilling is still stacked out on location. Inspection of the drilling pits revealed that the liners are intact and the fluid levels are acceptable. No violations at this time. |
| 0304156727 | 2008-07-02 | Completion Testing | No Violations | Inspection revealed no violations at this time. |
| 0324252907 | 2016-11-16 | Production Wells | No Violations | On the day of my inspection I found a wellhead equipped with 2.375 inch tubing, a plunger lift system with valves in the closed position on the tubing as well as one valve on the casing supplying the motor valve. The tank battery consists of a 210 barrel tank, horizontal separator and 2 drips within an earthen dike. Also present is a 50 barrel polymer brine tank within a separate earthen dike. Identification was present and production records are current. |
| 0330470211 | 2008-02-25 | Drill / Deepen / Reopen | No Violations | Inspection revealed that Warren Drilling is still stacked out on location. No violations at this time. Note: the drilling rig is suppose to be moving onto locations for Brammer Engineering in Jefferson County. |
| 0567512542 | 2016-07-06 | Production Wells | No Violations | On the day of my inspection accompanied by Inspector Doug Bennett I witnessed production including a 210 barrel tank, horizontal separator and 2 drips within an earthen dike. Also present is a 50 barrel polymer brine tank within a separate earthen dike. The well was equipped with 2.375 inch tubing, a plunger lift system with valves in the open position on the tubing as well as one valve on the casing supplying the motor valve. Identification was present and production records were current. |
| 0577374170 | 2015-03-23 | Production Wells | No Violations | On the date of inspection I found that production equipment consists of a 210bbl tank and a horizontal separator within an earthen dike. There is a 50bbl poly tank outside of the dike. The well is equipped with a gas plunger lift system, 2.375 inch tubing, and a Texas style well head. Tubing valve is in open position and production records are current through 2013. |
| 0797629026 | 2008-02-07 | Drill / Deepen / Reopen | No Violations | Inspection revealed that they are still building location and Warren drilling still not on location. No violations at this time. |
| 0808036028 | 2008-05-28 | Drill / Deepen / Reopen | No Violations | Inspection revealed no violations at this time. |
| 0977588674 | 2010-03-17 | Preliminary Restoration | No Violations | Inspection revealed that the preliminary restoration can be approved at this time. No violations at this time. |
| 1234669062 | 2008-01-31 | Drill / Deepen / Reopen | No Violations | Inspection revealed that they are unloading equipment to build the wellsite. No violations at this time. |
| 1243377465 | 2008-02-11 | Drill / Deepen / Reopen | No Violations | Inspection revealed that Warren drilling is moving onto location and rigging up. They are also digging the drilling pits at this time. No violations at this time. |
| 1318542860 | 2008-01-24 | Drill / Deepen / Reopen | No Violations | Inspection revealed that they havent started building the location . No violations at this time. Suppose to be moving Warren Drilling onto location anytime. |
| 1364842711 | 2013-04-01 | Production Wells | No Violations | A lease load leads up to properly signed tank battery which is enclosed in a SPCC dike. The Tank battery consists of a 210 barrel production tank and a 50 barrel poly brine tank. A horizontal separator is also contained in the tank. The plunger lift well is located in an adjacent field and is in well maintained condition. There are no violations at this time for this location. |
| 1405541258 | 2008-02-19 | Drill / Deepen / Reopen | No Violations | Inspection revealed that Warren Drilling has finished the well and is stacked out on location. No violations at this time. |
| 1506710911 | 2008-03-06 | Drill / Deepen / Reopen | No Violations | Inspection revealed that Warren drilling is still stacked out on location. No violations at this time. |
| 1871409162 | 2008-08-05 | Completion Testing | No Violations | Inspection revealed that the drilling pits have been closed and location rough graded . No violations at this time. |
| 2006949548 | 2008-03-11 | Drill / Deepen / Reopen | No Violations | Inspection revealed that Warren Drilling is still stacked out on location. Inspection also revealed that the pit liners are intact and the fluid levels are acceptable at this time. No violations at this time. |
| 324252907 | 2016-11-16 0:00 | PW | No Violations | 1.50 |
| 330470211 | 2008-2-25 0:00: | DD | No Violations | 1.00 |
| 567512542 | 2016-7-6 0:00:0 | PW | No Violations | 0.50 |
| 577374170 | 2015-3-23 0:00: | PW | No Violations | 1.00 |
| 808036028 | 2008-5-28 0:00: | DD | No Violations | 1.00 |
For data sources see[9]