34-081-20539

Well Details

Well ID: 34-081-20539
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Cross Creek Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-000515
Farm/Lease Name: NAC
License Status: Producing
License Date: 2012-10-01
Spud Date: 2012-11-25
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2013-02-13
Well Total Depth: 15430.00 ft
Configuration: Horizontal
Latitude: 40.300000
Longitude: -80.700000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-10-01 Proposed Formations:POINT PLEASANT, Issued Date:10/1/2012, Expired Date:10/1/2014 12:00:00 PM, Drilling unit acres:154.04, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-02-13
Completion Report Received 2013-05-01
Correction to Well 2013-06-28 CORRECTION TO TARGET INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT.
Construction Permit Expires 2013-10-01
Change of Owner 2014-06-18 Operator changed from 8870, HESS OHIO DEVELOPMENTS LLC to 8514, HESS OHIO RESOURCES LLC
Change of Owner 2014-07-24 Operator changed from 8514, HESS OHIO RESOURCES LLC to 9193, AMERICAN ENERGY UTICA LLC
Change of Owner 2015-08-19 Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 9520, ASCENT RESOURCES UTICA LLC
Record Last Modified 2017-10-24

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/11/2013 03/11/2013 9728.0 5403342.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 GBW-5 Baker Hughes Breaker Ammonium Phosphate 7727-54-0 100.0 0.00039
Sand, White, 100 mesh Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100.0 2.3593
GasFlo G, 330 gal tote Baker Hughes Surfactant Methanol 67-56-1 30.0 0.00057
NE-900, tote Baker Hughes Non-emulsifier Methanol 67-56-1 30.0 0.00056
Petroleum Distillates 64742-47-8 30.0 0.08604
Mixture of Surfactants Trade Secret 60.0 0.00114
Paraffinic Petroleum Distillate 64742-55-8 30.0 0.08604
Water 7732-18-5 None 0.0553185819
Modified Thiorea Polymer 68527-49-1 None 0.000207695
Copolymer Trade Secret None 0.0007505811
Water 7732-18-5 85.0 0.05247
Methanol 67-56-1 60.0 0.00005000
Ethylene Glycol 107-21-1 30.0 0.00744
Methyl Borate 121-43-7 30.0 0.00003000
Propargyl Alcohol 107-19-7 5.0 0.00015
Oxyalkylated Alcohol Trade Secret 5.0 0.00302
Guar Gum 9000-30-0 60.0 0.17208
Oxyalkylated Alkylphenol 9016-45-9 10.0 0.00019
2-Butoxy-1-Propanol 15821-83-7 None 0.0002294364
Inorganic Salt 7647-14-5 None 0.0030235159
Water 7732-18-5 50.0 0.00095
Cyrstalline Silica, Quartz (SiO2) 14808-60-7 5.0 0.01434
Polyoxyalkylenes Trade Secret 30.0 0.00089
Isotridecanol, ethoxylated 9043-30-5 5.0 0.01434
Potassium Chloride 7447-40-7 None 0.00001241
Polyol Ester Trade Secret None 0.0030235159
Polyacrylate Trade Secret None 0.0049629342
Anionic Terpolymer Trade Secret None 0.036282191
EDTA 64-02-8 None 0.00003024
Potassium Hydroxide 1310-58-3 30.0 0.00005000
Oxyalkylated Fatty Acid Derivative Trade Secret None 0.0030235159
Water 7732-18-5 95.0 0.02323
Sodium Chloride 7647-14-5 None 0.00000744
Olefin Trade Secret 5.0 0.00015
Hydrochloric Acid 7647-01-0 None 0.00002967
Methanol 67-56-1 None 0.0029670715
Water 7732-18-5 92.5 1.47102
Formaldehyde 50-00-0 None 0.00002967
CI-14 Baker Hughes Corrosion Inhibitor Fatty Acids Trade Secret 10.0 0.0003
HCl, 10.1 - 15 Baker Hughes Acidizing Hydrochloric Acid 7647-01-0 15.0 0.00926
Scaletrol 720 Baker Hughes Scale Inhibitor Calcium Chloride 10043-52-4 5.0 0.00124
Water Operator Carrier Water 7732-18-5 100.0 85.35917
Ingredients shown above are subject

to 29 CFR 1910.1200(i) and appear on Material Safety Data Sheets (MSDS). Ingredients shown below are Non-MSDS.

None None
Sand, White, 30/50 Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100.0 10.06508
BF-9L, 300 gal tote Baker Hughes Buffer Potassium Carbonate 584-08-7 60.0 0.0001
MaxPerm-20A, 265 gallon tote Baker Hughes Friction Reducer Aliphatic Hydrocarbon Trade Secret 30.0 0.01814
GW-3LDF Baker Hughes Gelling Agent 1-Butoxy-2-Propanol 5131-66-8 5.0 0.01434
XLW-32 Baker Hughes Crosslinker Boric Acid (H3BO3) 10043-35-3 30.0 0.00003000
HCl, 5.1 - 7.5 Baker Hughes Acidizing Hydrochloric Acid 7647-01-0 7.5 0.11927
Ferrotrol 300L Baker Hughes Iron Control Citric Acid 77-92-9 60.0 0.00751
Enzyme G-NE Baker Hughes Breaker Hemicellulase Enzyme Concentrate 9025-56-3 5.0 0.00122

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-03-11 H2O 8 4879 Bbl 281544 BAKER-HUGHES STAGE 21

36 SHOTS

2013-03-12 H2O 8 4344 Bbl 299644 BAKER-HUGHES STAGE 25

36 SHOTS

2013-02-21 H2O 8 4872 Bbl 258374 BAKER-HUGHES STAGE 1

12 SHOTS

2013-02-23 H2O 8 3596 Bbl 175430 BAKER-HUGHES STAGE 9

24 SHOTS

2013-03-11 H2O 8 4621 Bbl 279921 BAKER-HUGHES STAGE 23

36 SHOTS

2013-03-08 H2O 8 4500 Bbl 276330 BAKER-HUGHES STAGE 11

72 SHOTS

2013-02-23 H2O 8 4281 Bbl 282886 BAKER-HUGHES STAGE 8

24 SHOTS

2013-03-09 H2O 8 4267 Bbl 271966 BAKER-HUGHES STAGE 14

36 SHOTS

2013-03-09 H2O 8 4427 Bbl 279793 BAKER-HUGHES STAGE 13

24 SHOTS

2013-03-11 H2O 8 4755 Bbl 237736 BAKER-HUGHES STAGE 24

36 SHOTS

2013-03-10 H2O 8 4608 Bbl 281433 BAKER-HUGHES STAGE 19

36 SHOTS

2013-02-22 H2O 8 4877 Bbl 227675 BAKER-HUGHES STAGE 3

24 SHOTS

2013-03-10 H2O 8 4432 Bbl 281055 BAKER-HUGHES STAGE 18

36 SHOTS

2013-03-10 H2O 8 4444 Bbl 280367 BAKER-HUGHES STAGE 20
2013-02-22 H2O 8 4466 Bbl 281442 BAKER-HUGHES STAGE 5

24 SHOTS

2013-02-22 H2O 8 5323 Bbl 249065 BAKER-HUGHES STAGE 4

24 SHOTS

2013-02-22 H2O 8 4416 Bbl 281357 BAKER-HUGHES STAGE 6

24 SHOTS

2013-02-21 H2O 8 3082 Bbl 37957 BAKER-HUGHES STAGE 2

24 SHOTS

2013-02-23 H2O 8 4512 Bbl 71078 BAKER-HUGHES STAGE 7

24 SHOTS

2013-03-10 H2O 8 5241 Bbl 280713 BAKER-HUGHES STAGE 17

36 SHOTS

2013-03-09 H2O 8 4582 Bbl 279383 BAKER-HUGHES STAGE 16

36 SHOTS

2013-03-11 H2O 8 4404 Bbl 273017 BAKER-HUGHES STAGE 22
2013-03-08 H2O 8 5238 Bbl 280167 BAKER-HUGHES STAGE 12

24 SHOTS

2013-03-09 H2O 8 4206 Bbl 281545 BAKER-HUGHES STAGE 15

36 SHOTS

2013-03-06 H2O 8 701 Bbl 0 BAKER-HUGHES STAGE 10

24 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 HESS OHIO DEVELOPMENTS LLC 305033 0 137
2014 AMERICAN ENERGY UTICA LLC 192305 0 79
2015 ASCENT RESOURCES UTICA LLC 0 0 0
2016 ASCENT RESOURCES UTICA LLC 1958220 0 342
2017 ASCENT RESOURCES UTICA LLC 802483 0 327
2018 ASCENT RESOURCES UTICA LLC 478158 0 328
2019 ASCENT RESOURCES UTICA LLC 96122 0 88

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 HESS OHIO DEVELOPMENTS LLC Brine 4601 137
2014 AMERICAN ENERGY UTICA LLC Brine 288 79
2015 ASCENT RESOURCES UTICA LLC Brine 77 0
2016 ASCENT RESOURCES UTICA LLC Brine 11756 342
2017 ASCENT RESOURCES UTICA LLC Brine 8814 327
2018 ASCENT RESOURCES UTICA LLC Brine 6054 328
2019 ASCENT RESOURCES UTICA LLC Brine 857 88

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1315892323 2020-1-29 0:00: PW No Violations 1.00
-1336339507 2016-9-20 0:00: PW No Violations 0.30
-1465220266 2019-12-10 0:00 PW No Violations 1.00
-1466886953 2016-11-30 0:00 PW No Violations 0.30
-1500936205 2013-8-7 0:00:0 PW No Violations 2.00
-1698205920 2014-11-5 0:00: PW No Violations 1.00
-1780929206 2012-11-16 0:00 DD No Violations 1.00
-1938688602 2018-6-20 0:00: UP No Violations 1.00
-2040154135 2013-3-4 0:00:0 AM No Violations 4.00
-2139743730 2012-12-31 0:00 DD No Violations 2.00
-278504352 2012-12-20 0:00 DD No Violations 3.00
-55108775 2013-5-1 0:00:0 SC No Violations 3.00
-811035016 2013-5-6 0:00:0 SC No Violations 1.00
0055108775 2013-05-01 Surface Facility Construction No Violations I was onsite to check the progress of the construction of the Hess production facility onsite. There is a 400 barrel production barrel installed contained within a steel SPCC dike. There are separators and other production facility onsite as well. The gas from the location is being sold through a polyline, but the sales line is insufficient for the quantity of methane being produced. A workover rig is being brought on location within the week to work on the Hess NAC 3H-20 well. This well is in production but is currently choked back. There are no violations at this time.
0278504352 2012-12-20 Drill / Deepen / Reopen No Violations
0352928427 2012-12-14 Drill / Deepen / Reopen No Violations I stopped to check the status of H&P #287 in their drilling. They are currently at 7939 feet on air at 59 feet per hour. They had a small show of gas around 7805 feet when entering the Queenstown. They expect to drill to the desired depth of 8415 feet tomorrow allowing them to run their 9 5/8 casing. There are currently no violations at this time.
0766600111 2017-06-21 Production Wells No Violations On the date of my inspection I found a well maintained lease road with a fence and gate. The pad has 3 properly identified producing wells, one open cellar with an unidentified wellhead (Permit 34-081-2-
0811035016 2013-05-06 Surface Facility Construction No Violations The surface production facility for this location is still being constructed. They are permanent production lines from the wells to the facility so that the gas can be processed onsite before it could be sold to a pipeline. The facility has the capacity to be expanded if more wells are to be drilled on this location.
0998705034 2014-07-24 Production Wells No Violations Met with AEU representatives Kevin Eshbaugh and Corey McNutt to gain access to site. This well is currently shut-in. AEU reps stated that they are unable to flow the wells on this pad simultaniously due to pipeline restrictions and that they are alternating production on the wells. Large texas style wellhead with 1 400bbl tank, 3 phase seperator, line heater, and dehydrator are onsite.
1150841085 2013-03-25 Completion Testing No Violations This well is currently being flowed back and produced at the same time. The well is being flared while being flowed back in order to handle the excess gas that cannot be sold in the poly line that is currently on location. They expect the flow back to continue until Wednesday but that time table is tentative at this time.
1336339507 2016-09-20 Production Wells No Violations
1354043773 2012-11-27 Drill / Deepen / Reopen No Violations I stopped to check the status of H&P #287 in their drilling. They are currently at 426 feet of the 600 feet they are trying to drill. They are currently trying to pull out of the hole with the hammer bit do to the hole collapsing back in on itself. Once out of the hole they will go back in and try to continue drilling. There are currently no violations at this time.
1356971707 2012-12-27 Drill / Deepen / Reopen No Violations I stopped at this location to check the status of the squeeze cement job on the 9 5/8 casing. They are currently reaming the perforations and DV tool in order to set casing patches. A total of 3 patches 4 feet long each will be set in the casing by Saltel Industries to close off the DV tool and the perforations at the estimated depth of 4650. After the patches are set the casing will be tested to 6000 psi using the onsite Halliburton truck. There are no violations at this time.
1357575845 2012-12-27 Drill / Deepen / Reopen No Violations I stopped onsite to investigate a confidential complaint received in an email. The complaint stated that there has been oil based mud spilled on location several times and that it is entering draining ditches on the backside of the location. This is to have occurred around 12/11/2012. I investigated the drainage ditch and the area around the mud tanks on location and saw no signs of any spills or overflowing tanks from oil based mud. I asked to check the tickets from Mohawk Transport to check when oil based mud came on location. The tickets showed 11/28/2012 but the well was never drilling using oil based mud during the date the complaint was filed. I contacted Marcus Attaway, Hess completions supervisor, and there was a 1 barrel spill of oil based mud when drilling the 3H-20 well, which was reported. There were no documented spills on this site and I saw no signs of spills on location. During this inspection there were no spills on site and no violations.
1357928606 2013-01-08 Drill / Deepen / Reopen No Violations I was onsite to check the drilling sit while the rig was waiting on orders. They have a whipstock on location to sidetrack the well should that plan be approved and ordered. The rig was currently shut down and company men were about to make a hitch change. There are no violations onsite.
1360156257 2013-02-05 Administrative Inspection No Violations I was on location to pick up the Mohawk Transport tickets for the location. The rig was currently drilling ahead at 12000 feet.
1361891580 2013-02-25 Administrative Inspection No Violations I was onsite to check the status of the hydraulic fracturing of this well. Baker Hughes was onsite waiting for the 10th stage of perforations to be run. The job will include a total of 24 stages. Hess production was onsite to establish a selling point through a 4 flow line from a previous well located on the location. The process was going to resume in the mourning and they estimate that they will be on location until Saturday conducting the frac.
1362419911 2013-03-01 Administrative Inspection No Violations I was on location to check the status of the hydrallic fracturing of this well. They are currently stuck on the 9th of 24 stages in the frac schedule. They are having trouble drilling out the plug seperating the 9th and 10th stages. They expect to start the 10th stage early Monday mourning.
1363800380 2013-03-18 Completion Testing No Violations I was onsite to check the status of the hydraulic fracturing and completions of the NAC 4H-20 well. They recently completed their 24 stage frac job and are now preparing the well to be put into production. A flair stack is onsite and the flow back process has began. They plan on using a poly line from an adjacent well to sell gas in order to hold their lease with the North American Coal Co. The well will be substantially restricted due to the lack of sellable pipeline capacity. They will initially flair some of the excess gas until the established sale quantity can be established.
1363802773 2013-03-18 Drill / Deepen / Reopen No Violations I conducted a inspection in regards to complaint #4164 regarding spilling of oil based mud. The Mohawk mud tanks are still on location but have been thoroughly cleaned and set aside on site for removal. The complaint will be closed out when the tanks are removed and the site is seen to show no signs of oil based mud contamination, which it currently shows no signs at this time.
1366214137 2013-04-16 Administrative Inspection No Violations I was onsite to check and confirm that all Mohawk frac tanks have been removed from the Hess NAC well pad. The pad is free of any oil based drilling mud and pictures documenting the cleaning of the frac tanks have been received. Complaint #4164 can not be closed out.
1366219641 2013-04-16 Production Wells No Violations I was onsite to check the status of putting this well into full production. A Key workover rig was on location to fish out a packer and some tools left in the hole. They plan to complete the well in 2 days time and be offsite. A GIS crew is currently onsite spotting locations for the production facilities that will be placed onsite. There are no violations at this time.
1371739256 2013-06-18 Production Wells No Violations I was onsite to check the status of the production of this well. There have been some delays in getting the production facilities completed. There was an oversized valve in place that needed to be switched out in order to allow proper control of the facilities. They expect the production facilities to be completed tonight and the well to be put into a chocked back production tomorrow afternoon.
1373563902 2013-07-10 Production Wells No Violations I was onsite to check the status of the production wells on this location. The location has the production facilities completely finished and the wells are being sold into a poly line, causing the wells to be choked back from full production at this time. I also checked the annulus gauges of the wells and this well showed no signs of annular pressures. There are no violations at this time.
1435819218 2013-05-16 Preliminary Restoration No Violations I was onsite to pass preliminary restoration for this well. The well has been completed and is currently in a choked back production state. A production facility is being completed onsite for the well as well when the proper pipelines can be installed to sell the full capacity of the well. All of the drilling equipment has been removed offsite and the proper erosion controls have been installed and are established. At this time preliminary restoration can be passed.
1466886953 2016-11-30 Production Wells No Violations On the date of my inspection I found a well maintained lease road with a fence and gate. The pad has 3 properly identified producing wells, one open cellar with an unidentified wellhead (Permit 34-081-2-
1500936205 2013-08-07 Production Wells No Violations I was onsite to check annular pressures of the wells on this location. This well is currently producing. One of the annular gauges showed 50psi of pressure and the valve is leaking into the cellar full or water. The valve is slightly bubbling and I have contacted Hess to inform them of the small leak so that their well tender can take care of the issue.
1610381579 2012-11-30 Drill / Deepen / Reopen No Violations I was onsite to witness the cementing of the 20 inch surface casing. The well was attempted to be circulated with 1000 barrels of fresh water but no returns were seen. The Halliburton job expected 70 barrels of cement returns. There were no returns of any kind seen on the job. The well was bond logged and it showed that the cement was around 80 feet below ground surface, just below the base of the 30 inch conductor. It was decided that a cement basket be set at 70.5 feet and the job be topped off with cement by Halliburton.
1647690934 2015-05-05 Production Wells No Violations
1698205920 2014-11-05 Production Wells No Violations On the date of inspection I was on site to check the status of the temporary plugging operation for the well. I was informed by American Energy Utica consultant, Andy Ingram, that he planned to set two temporary plugs in the well for safety reasons so that additional wells can be drilled on the same well pad. Precision Rathole equipment is on site to begin drilling conductors after the plugs are set.
1780929206 2012-11-16 Drill / Deepen / Reopen No Violations I was on site to check the status of the conductor hole that is being drilled by Butchs. There have been several attempts to drill the hole to 120 feet but have failed because the hole keeps collapsing in on itself. Currently the hole was drilled and then filled with Halliburton cement to try to provide support for the drilling of the hole without cave in. They are planning on letting the cement cure for 12 hours before redrilling the conductor hole. There are no violations on the site.
1938688602 2018-06-20 UrbanProduction Wells No Violations On the date of my inspection I found this pad to contain three properly identified producing wells and one open cellar with an unidentified wellhead (permit 20499.) There are also three sand separators, two vertical separators, three line heaters, and a 400 barrel steel tank within a metal dike. Surface annular pressure is 400 psi, Intermediate annular pressure is 0 psi, production casing pressure is 0 and tubing pressure is 1250 psi. Production is up to date.
2000275105 2013-01-31 Drill / Deepen / Reopen No Violations I was on location to pick up the cement tickets from the cementing of the 7 casing. The rig is currently in the middle of their kickoff at 9300. They estimate the will be drilling another 6 days before they will TD the well. There are no violations onsite at this time.
2040154135 2013-03-04 Administrative Inspection No Violations I was on location to check the status of the fracturing of this well. They are still in their 9th of 24 stages. They are having trouble drilling out the plugs with the coiled tubing to move onto the 10th stage. They also had some cross contamination of their frac water. Baker Hughes is onsite testing the water that Hess has been remediating and chemically treating. They are also running the water through a 5 micron filter before any of it is used in the fracturing process. They plan to get back to fracing the well tomorrow. 4 Mowhawk/Hardrock Excavating mud tanks are still on location but are fenced off and not being used for any process onsite. They are awaiting orders on how to have the tanks taking off location. There are no violations at this time.
2102986100 2013-05-28 Production Wells No Violations I received an email from Hess stating that they were going to production testing/producing this well for several days before the production facilities onsite were completed. The onsite consultant informed me that they have a flare stack onsite to allow an extra gas or pressures that cannot be sent down the sales line to be safely flared off. The well needs to be produced in order hold the lease and the well will be sold in this condition until the production facility is completed and the gas can be proccessed and sold through the flowline.
2107387963 2017-12-13 Production Wells No Violations On the date of my inspection I found a well maintained lease road with a fence and gate. The pad has 3 properly identified producing wells, one open cellar with an unidentified wellhead (Permit 34-081-2-
2139743730 2012-12-31 Drill / Deepen / Reopen No Violations I stopped at this location to check the status of the squeeze cement job on the 9 5/8 casing. They are currently trying to fish out the packer that was used to set the casing patch. The casing patch was not properly set and they were unable to deflate the packer. It is currently stuck in the hole and they are putting 90k lbs of pressure trying to move it. The plan is to set the packer free or damage it enough and sheer the pins so that it will deflate on its own. There currently no violations at this time.
352928427 2012-12-14 0:00 DD No Violations 2.50
766600111 2017-6-21 0:00: PW No Violations 0.50
998705034 2014-7-24 0:00: PW No Violations 0.50

For data sources see[9]

References