If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20617 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.4,"lon":-80.83,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Salem Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001358 | |
Farm/Lease Name: NEWBURN 26-10-3 | |
License Status: Producing | |
License Date: 2016-02-18 | |
Spud Date: 2016-04-13 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2016-07-01 | |
Well Total Depth: 18893.00 ft | |
Configuration: Horizontal | |
Latitude: 40.400000 | |
Longitude: -80.830000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-02-05 | Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:2/5/2016, Expired Date:2/4/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2016-02-18 | Proposed Formations:POINT PLEASANT, Issued Date:2/18/2016, Expired Date:2/17/2018 12:00:00 PM, Drilling unit acres:221.25, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2016-07-01 | |
Correction to Well | 2016-09-30 | CHANGE IN ACREAGE/TARGET/TAKEPOINT PER AS DRILLED RECEIVED 8/30/16-ALE |
Completion Report Received | 2016-11-30 | |
Construction Permit Expires | 2018-02-17 | |
Change of Owner | 2018-12-18 | Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC |
Record Last Modified | 2018-12-18 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-11-30 | 9423 | 18772 | 0 |
9423 | 18772 | 0 | |
9423 | 18772 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/15/2016 | 09/20/2016 | 9056 | 6,732,640.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Non-crystalline silica (impurity) | 7631-86-9 | 0.00175 | 0.00029 | 0 | |||
Formaldehyde (impurity) | 50-00-0 | 0.00012 | 0.00002000 | 0 | ||||
Siloxanes and silicones, dimethyl,
reaction products with silica |
67762-90-7 | 0 | 0 | 0 | ||||
Polymer of 2-acrylamido-2-methylpropanesulfonic
acid sodium salt and methyl acrylate |
136793-29-8 | 0.00295 | 0.00049 | 0 | ||||
Ammonium sulfate | 7783-20-2 | 0.03734 | 0.00618 | 0 | ||||
Magnesium silicate hydrate (talc) | 14807-96-6 | 0.0002 | 0.00003000 | 0 | ||||
Alcohol, C9-C11, Ethoxylated | 68439-46-3 | 0.00072 | 0.00012 | 0 | ||||
Urea | 57-13-6 | 0.00181 | 0.0003 | 0 | ||||
Dodecamethylcyclohexasiloxane | 540-97-6 | 0 | 0 | 0 | ||||
Potassium hydroxide | 1310-58-3 | 0.07076 | 0.01172 | 0 | ||||
Methanol | 67-56-1 | 0.00422 | 0.0007 | 0 | ||||
poly(tetrafluoroethylene) | 9002-84-0 | 0.00009000 | 0.00001000 | 0 | ||||
Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 0.00005000 | 0.00001000 | 0 | ||||
Copper(II) sulfate | 7758-98-7 | 0 | 0 | 0 | ||||
Diammonium peroxidisulphate | 7727-54-0 | 0.03695 | 0.00612 | 0 | ||||
Acetic acid(impurity) | 64-19-7 | 0.00019 | 0.00003000 | 0 | ||||
Decamethyl cyclopentasiloxane | 541-02-6 | 0 | 0 | 0 | ||||
Sodium sulfate | 7757-82-6 | 0.00042 | 0.00007000 | 0 | ||||
Chlorine Dioxide | 010049-04-4 | 100 | 0.0155 | |||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 0.00048 | 0.00008000 | 0 | ||||
Dimethyl siloxanes and silicones | 63148-62-9 | 0.00003000 | 0 | 0 | ||||
Hydrochloric acid | 7647-01-0 | 0.42163 | 0.06981 | 0 | ||||
Glycerol | 56-81-5 | 0.06243 | 0.01034 | 0 | ||||
Reaction product of: acetophenone,
formaldehyde, cyclohexylamine, methanol and acetic acid |
224635-63-6 | 0.00174 | 0.00029 | 0 | ||||
Acrylamide, 2-acrylamido-2-methylpropanesulfonic
acid, sodium salt polymer |
38193-60-1 | 0.02756 | 0.00456 | 0 | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 0 | 0 | 0 | ||||
Amines, tallow alkyl, ethoxylated | 61791-26-2 | 0.00014 | 0.00002000 | 0 | ||||
Sodium erythorbate | 6381-77-7 | 0.00328 | 0.00054 | 0 | ||||
Quartz, Crystalline silica | 14808-60-7 | 98.6629 | 16.3361 | 0 | ||||
2-Propenamid (impurity) | 79-06-1 | 0.00009000 | 0.00001000 | 0 | ||||
Cinnamaldehyde | 104-55-2 | 0.00097 | 0.00016 | 0 | ||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 0.00658 | 0.00109 | 0 | ||||
Guar gum | 9000-30-0 | 0.54617 | 0.09043 | 0 | ||||
Potassium borate | 1332-77-0 | 0.19146 | 0.0317 | 0 | ||||
Acetophenone | 98-86-2 | 0.00018 | 0.00003000 | 0 | ||||
Water | Schlumberger | Corrosion Inhibitor, Acid, Breaker, Gelling Agent, Friction Reducer, Crosslinker, Iron Control Agent, Propping Agent, Fluid Loss Additive | 7732-18-5 | 0.02209 | ||||
Water (Including Mix Water Supplied by Client)* | 7732-18-5 | 0 | 83.4426 | 0 | ||||
Water | Terra Services | Corrosion Inhibitor, Acid, Breaker, Gelling Agent, Friction Reducer, Crosslinker, Iron Control Agent, Propping Agent, Fluid Loss Additive |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-08-11 | H2O | 0 | 4851 Bbl | 330140 | Schlumberger | STAGE 1/34
25 SHOTS STAGES 2-33 SEE IMAGES |
2016-09-20 | H2O | 0 | 4240 Bbl | 338880 | Schlumberger | STAGE 34/34
40 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | CHESAPEAKE EXPLORATION LLC | 843031 | 17 | 77 |
2017 | CHESAPEAKE EXPLORATION LLC | 2485573 | 5 | 361 |
2018 | CHESAPEAKE EXPLORATION LLC | 1016161 | 0 | 290 |
2019 | EAP OHIO LLC | 222037 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 21730 | 77 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 11243 | 361 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 3913 | 351 |
2019 | EAP OHIO LLC | Brine | 941 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1239456372 | 2016-9-27 0:00: | DD | No Violations | 1.00 |
-2014206866 | 2016-11-21 0:00 | PW | No Violations | 1.20 |
-453533162 | 2016-4-15 0:00: | DD | No Violations | 7.00 |
-584368683 | 2016-6-30 0:00: | DD | No Violations | 2.00 |
-810844003 | 2020-6-9 0:00:0 | PW | No Violations | 1.00 |
-917038927 | 2020-5-20 0:00: | PW | No Violations | 1.00 |
0080009066 | 2016-04-14 | Drill / Deepen / Reopen | No Violations | I am on site today accompanied by Inspector Mark Moreland, to meet with the company man Brett Farnsworth for information about the conductor cement job that will occur promptly. Brett informed us that the cement job was scheduled for 8:30 pm that night. While on site I witnessed Express Energy Services was drilling a 26 inch diameter hole with an auger rig. During the conduction of my inspection I performed a site overview, were I found no signs of pollution or contamination. I will be back on site tonight to witness the cementing of the conductor job. |
0238962527 | 2017-11-16 | Production Wells | No Violations | |
0453533162 | 2016-04-15 | Drill / Deepen / Reopen | No Violations | I am on site today accompanied by Inspector Mark Moreland, to witness the cementing of the conductor casing. Express Energy Services drilled a 26 inch diameter hole to a depth of 100 feet and ran 100 feet of 20 inch diameter, 94 pound per foot casing. O-Tex Cementing Service is the cement contractor on site. O-Tex displaced with 32 bbl. of fresh water and then pumped 245 sacks of Class A 1.18 percent yield/15.6 pound cement. I witnessed cement returns to surface and 2 feet of cement was left in the tin horn, sealing off the tin horn and conductor. |
0584368683 | 2016-06-30 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Nomac Rig No. 74 in the process of drilling the lateral section of the well bore. The company man stated that total depth would be reached within the next two days. While on site I performed a walk around the location and found no signs of pollution or contamination. |
1007863809 | 2016-03-24 | Surface Facility Construction | No Violations | On my inspection today, I found construction on this well pad nearly complete. The pad itself was complete at final grade and final gravel and rolling has been applied. Well pad slopes had not yet been seeded. All erosion and sedimentation controls are in place. Signage has been placed at the access road entry point with required well identification information. |
1037254233 | 2017-06-06 | Production Wells | No Violations | |
1133436737 | 2016-11-21 | Preliminary Restoration | No Violations | I am onsite today to perform a preliminary restoration inspection. All drilling equipment has been removed from the pad. The well has been placed into production. There are currently 2 frac tanks being stored onsite. |
1239456372 | 2016-09-27 | Drill / Deepen / Reopen | No Violations | On the date of my inspection I found a well maintained lease road with a fence and gate. The pad has 1 drilled well. The pad is surrounded by healthy vegetation. The wellhead is equipped with a christmas tree valve. There are no pressure gauges tied into the wellhead. Frac equipment is currently being removed from the site. Production equipment that is onsite but not assembled yet includes a sand separator, glycol dehydration unit, gas production unit, and one 400 barrel tank within a metal dike. |
1467119301 | 2016-06-27 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found Nomac Rig No 74 is in the process of completing the vertical section of the well bore. Company Man David Newman stated the rig would be drilling the horizontal section within the next couple of days and completing the well by the end of the week. |
1467383323 | 2016-07-01 | Drill / Deepen / Reopen | No Violations | Nomac Drilling Rig # 84 is drilling ahead on the lateral section of the well using oil base mud at 16,500 ft. They plan to finish drilling tonight and will run a series of logs following the drilling operation. The series of logs will be thru the bit type logs done before running the production casing. The rig plans on moving to the Shultz location after completing the current well. |
1468178542 | 2016-07-01 | Administrative Inspection | No Violations | |
1468504905 | 2016-07-06 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Nomac Rig No 74 is in the process of rigging down and preparing to move to permit No 3408120636. Company man John Smith stated that they should be ready to set and cement surface casing Saturday or Sunday. |
1559953424 | 2020-1-17 0:00: | PL | No Violations | 1.00 |
1568291614 | 2019-9-12 0:00: | PL | No Violations | 1.00 |
1847599930 | 2020-8-20 0:00: | PW | No Violations | 1.00 |
2014206866 | 2016-11-21 | Production Wells | No Violations | |
238962527 | 2017-11-16 0:00 | PW | No Violations | 0.80 |
364135074 | 2020-8-5 0:00:0 | PW | No Violations | 1.00 |
80009066 | 2016-4-14 0:00: | DD | No Violations | 2.50 |
For data sources see[10]