If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20634 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.47,"lon":-80.82,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Ross Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001383 | |
Farm/Lease Name: SHULTZ 25-11-3 | |
License Status: Producing | |
License Date: 2018-01-05 | |
Spud Date: 2018-06-28 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-09-28 | |
Well Total Depth: 22748.00 ft | |
Configuration: Horizontal | |
Latitude: 40.470000 | |
Longitude: -80.820000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-03-29 | Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:3/29/2016, Expired Date:3/29/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2018-01-05 | Proposed Formations:POINT PLEASANT, Issued Date:1/5/2018, Expired Date:1/5/2020 12:00:00 PM, Drilling unit acres:974.34, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-09-28 | |
Change of Owner | 2018-12-18 | Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC |
Completion Report Received | 2019-04-01 | |
Record Last Modified | 2019-04-04 | |
Construction Permit Expires | 2020-01-05 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2019-04-03 | 9159 | 9280 | 0 |
2019-04-03 | 22505 | 22605 | 0 |
22505 | 22605 | 0 | |
9159 | 9280 | 0 | |
9159 | 9280 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/21/2018 | 01/07/2019 | 8794 | 39,033,700.0 | 1,643,070.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | CI-14 | BJ SERVICES | Corrosion Inhibitor | Proprietary Fatty Acids | Trade Secret | 10 | 0.00011 | 0 |
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 5 | 0.00005000 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 70 | 0.00076 | 0 | ||||
Proprietary Polyoxyalkylenes | Trade Secret | 20 | 0.00022 | 0 | ||||
Proprietary Olefin | Trade Secret | 5 | 0.00005000 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 9.18243 | 0 | |
ThinFrac MP I | BJ SERVICES | Friction Reducer | Oxyalkylated alcohol | Trade Secret | 5 | 0.00346 | 0 | |
Distillates (petroleum), Hydrotreated Light | 64742-47-8 | 30 | 0.02074 | 0 | ||||
Sodium Chloride | 7647-14-5 | 5 | 0.00346 | 0 | ||||
HCL 5.1 - 7.5 | BJ SERVICES | Acid | Hydrochloric Acid | 007647-01-0 | 8 | 0.04737 | 0 | |
Water | 007732-18-5 | 93 | 0.58424 | 0 | ||||
HCL10.1 - 15 | BJ SERVICES | Acid | Water | 007732-18-5 | 85 | 0.01699 | 0 | |
Hydrochloric Acid | 007647-01-0 | 15 | 0.003 | 0 | ||||
Northern White Sand | BJ SERVICES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 8.13083 | 0 | |
ResCare IC 300L | BJ SERVICES | Iron Control Agent | Citric Acid | 000077-92-9 | 50 | 0.00224 | 0 | |
ALPHA 1427 | BJ SERVICES | Anti-Bacterial Agent | Quaternary Ammonium Compound | 068424-85-1 | 7 | 0.00131 | 0 | |
Water | 007732-18-5 | 60 | 0.01123 | 0 | ||||
Ethanol | 000064-17-5 | 5 | 0.00094 | 0 | ||||
Didecyl Dimethyl Ammonium Chloride | 007173-51-5 | 10 | 0.00187 | 0 | ||||
Glutaraldehyde (Pentanediol) | 000111-30-8 | 30 | 0.00562 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 81.9417 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2019-01-07 | H2O | 15 | 9818 Bbl | 331421 | BJ Services Company | STAGE 90/90
STAGES 2-89 SEE IMAGES |
2018-11-21 | H2O | 15 | 8646 Bbl | 197729 | BJ Services Company | STAGE 1/90
STAGES 2-89 SEE IMAGES |
2019-01-02 | H2O | 0 | 10584 Bbl | 329078 | BJ Services Company | On the day of my inspection I witnessed BJ's stimulate stage 78/90. Plug was set at 11095, with bootom perfs at 11080 and top perfs at 10959. They pumped 3000 gallons of 7.5% HCl and 10584 barrels of clean fluid. 131624 lbs of 40/70 mesh sand and 197454 lbs of 100 mesh sand pumped for a total of 329078 lbs. Breakdown pressure was 8121. Max rate was 97.5 barrels per minute and max pressure was 10809. Averate rate was 94.2 and average pressure was 10030. Frac gradiant was 1.23. surface and interme |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | EAP OHIO LLC | 1917582 | 0 | 79 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | EAP OHIO LLC | Brine | 36603 | 79 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1150923907 | 2019-1-8 0:00:0 | CT | No Violations | 1.00 |
-1195558717 | 2019-1-2 0:00:0 | CT | No Violations | 1.00 |
-1349772554 | 2018-12-12 0:00 | CT | No Violations | 1.00 |
-621157766 | 2018-12-19 0:00 | CT | No Violations | 1.00 |
-741912100 | 2018-8-21 0:00: | DD | No Violations | 2.00 |
0621157766 | 2018-12-19 | Completion Testing | No Violations | On the day of my inspection BJs was onsite. This well is on stage 39/90. Plug is set at 16945, with bottom perforations at 16930 and top perforations at 16809. Design for this stage is 330000 lbs of sand. 130000 40/70 mesh and 200000 100 mesh. 3000 gallons of 7.5% HCL acid and 7600 barrels of fluid. Did not watch to entire stage as it was a large one. |
0741912100 | 2018-08-21 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 571 rig moving in to drill the 1H and 3H wells. ID to Company man Joe. The 5H well has had SIMOPS procedures completed, see my report for that well on this date for more information. The rig is not completely on location yet and they are hoping to spud late in the weekend. |
0860859030 | 2019-01-22 | Completion Testing | No Violations | On the day of my inspection I witnessed Stone Rig 15 was moving off of location. This pad has had the frac plugs drilled. Several condtractors were on location working on surface production equipment and plumbing. Surface annular pressure is 0, and intermediate annular pressure is 50. |
1150923907 | 2019-01-08 | Completion Testing | No Violations | On the day of my inspection I witnessed the BJ frac crew rigging down equipment and moving off of location. I spoke with company man Dave and he said they are moving to the cevik pad in columbiana county. Kill plugs were set in this well last night at 8895 and 8807 feet. Surface annular pressure is zero and intermediate annular pressure is 0. |
1195558717 | 2019-01-02 | Completion Testing | No Violations | On the day of my inspection I witnessed BJs stimulate stage 78/90. Plug was set at 11095, with bootom perfs at 11080 and top perfs at 10959. They pumped 3000 gallons of 7.5% HCl and 10584 barrels of clean fluid. 131624 lbs of 40/70 mesh sand and 197454 lbs of 100 mesh sand pumped for a total of 329078 lbs. Breakdown pressure was 8121. Max rate was 97.5 barrels per minute and max pressure was 10809. Averate rate was 94.2 and average pressure was 10030. Frac gradiant was 1.23. surface and intermediate annular pressure is 0. |
1349772554 | 2018-12-12 | Completion Testing | No Violations | On the day of my inspection I witnessed a BJ Energy frac crew on location. Identified myself to Company man Terry Hickman. They are currently fracking stage 22/90. Plug set at 19495, with bottom perforation at 19479 and top perforation at 19359. Perforations made with 5 guns, 6 shots each. Stage included 3000 gallons of 7.5% HCl, 198116 lbs 100 mesh sand, 133718 lbs 40/70 mesh sand, and 9628 barrels of clean water. Max pressure was 10714, average pressure was 10226, maximum rate 93 barrels per minute (BPM), average rate 80 BPM. Break down pressure was 6768 at 15 BPM. Initial shut in pressure was 6389. Frac gradient was 1.17 psi/ft. Surface and intermediate annular pressures were 0. |
1530276284 | 2018-06-29 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Express had augured a 36 inch diameter hole to 120 feet. 120 feet of 30 inch diameter conductor casing was run. O-tex/CJs was onsite with 345 sacks of class A cement. Additives include 1% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.19. 30% percent excess ran. Cement was displaced with 92 barrels of fresh water. 10 barrels of cement returned to surface. |
1536826540 | 2018-09-12 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I wintessed Patterson 571 spud with a 24 inch diameter hammer. 30 inch diameter conductor casing set to 120 feet. Rig tagged cement at 110 feet from ground level. This mine string section will be drilled to approximately 505 feet. Cement job anticipated tomorrow. Identified myself to Company man Joe. |
1536898195 | 2018-09-14 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Patterson 571 drilled a 24 inch diameter open hole to a depth of 508 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 120 feet. Costys ran 504 feet of 20 inch diameter casing, j-55, 94 lbs/foot. Casing was centralized with 6 centralizers. Shoe track is 45 feet long. Halliburton was onsite with 762 sacks of class A cement. Cement weighed with mudscale at 15.8 ppg and yield of 1.223. 50% excess ran in open hole. Cement displaced with 163 barrels of fresh water. 30 barrels of gel and 10 barrel of water pumped ahead of cement. 43 barrels of cement returned to surface, and floats held with 2 barrels back. |
1537169477 | 2018-09-17 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the intermediate casing cement job. Patterson 571 drilled a 12.25 inch diameter open hole to a depth of 2016 feet. Previous casing set and cemented was 13.375 inch diameter mine string casing to a depth of 620 feet. Wyoming casing ran 2009 feet of 9.625 inch diameter casing, j-55, 40 lbs/foot. Shoe track is 45 feet long. Halliburton was onsite with 696 sacks of class A neocem cement. Cement weighed with mudscale at 15.8 ppg and yield of 1.21. 42% excess ran in open hole. Cement displaced with 149 barrels of fresh water. 30 barrels of gel and 10 barrels of water pumped ahead of cement. 29 barrels of cement returned to surface, and floats held with 1.5 barrels back. Returned cement weighed 14.6 prior to plug bumping. |
1537283515 | 2018-09-18 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I was accomapanied by Inspector Ken Fry. We identified ourselves to company man Neil Brown. Patterson 571 is currently drilling their 8.75 inch diameter hole at 5000 feet. This is a SIMOPs pad. Annular pressures on the temporarily abandoned well are zero psi. Ken and I also reviewed the anticollison reports for the wells. |
1556042764 | 2019-04-23 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed this pad to contain three properly labeled, producing wells. This well is producing through the 5.5 inch diameter casing. This well is producing from each side of the well head. Production equipment includes five sand seperators, five GPUs, and two 400 barrel steel tanks, in their own containment. Five desanders remain on location as well as two agricultural tractors, three water trucks, one lime truck, and three frac tanks. Area around the pad, (outside of pad disturbance limit) has been plowed. There is also a gravel road for pipeline right of way access that appears of recent construction. The 13.375x9.625 annular pressure is 0 psi and the 9.625x5.5 annular pressure is 200 psi. Pad slopes are stable and vegetated. Site meets requirements of 1509.072 (A) for preliminary restoration. |
1903334517 | 2020-1-31 0:00: | PW | No Violations | 1.00 |
860859030 | 2019-1-22 0:00: | CT | No Violations | 1.00 |
For data sources see[10]