Well ID: 34-081-20638 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.49,"lon":-80.76,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Ross Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001385 | |
Farm/Lease Name: HENRY 8-11-3 | |
License Status: Producing | |
License Date: 2016-07-14 | |
Spud Date: 2016-08-08 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2016-09-24 | |
Well Total Depth: 23651.00 ft | |
Configuration: Horizontal | |
Latitude: 40.490000 | |
Longitude: -80.760000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-03-31 | Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:3/31/2016, Expired Date:3/31/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2016-07-14 | Proposed Formations:POINT PLEASANT, Issued Date:7/14/2016, Expired Date:7/14/2018 12:00:00 PM, Drilling unit acres:1019.76, Proposed Well Type:OG, Proposed Well Class:FWC |
Reached Total Depth | 2016-09-24 | |
Correction to Well | 2017-03-31 | UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 3/6/17-RC |
Completion Report Received | 2017-05-31 | |
Construction Permit Expires | 2018-07-14 | |
Change of Owner | 2018-12-18 | Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC |
Record Last Modified | 2018-12-18 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-03-17 | 9298 | 23529 | 0 |
9298 | 23529 | 0 | |
9298 | 23529 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/11/2017 | 02/08/2017 | 9071 | 12,019,400.0 | 962200 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Northern White Sand | HALLIBURTON | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 14.1901 | 0 |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 75.2679 | 0 | |
HCL HYDROCHLORIC ACID | HALLIBURTON | Acid | Water | 007732-18-5 | 85 | 0.97219 | 0 | |
Hydrochloric Acid | 007647-01-0 | 15 | 0.17156 | 0 | ||||
FE-1A | HALLIBURTON | Iron Control Agent | Acetic Anhydride | 000108-24-7 | 100 | 0.00587 | 0 | |
Acetic acid | 000064-19-7 | 60 | 0.00352 | 0 | ||||
OPTIFLO-III DELAYED RELEASE | HALLIBURTON | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00251 | 0 | |
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 30 | 0.00075 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 7.81476 | 0 | |
BA-40L, BC-140 X2, FE-1A, FR-76,
HAI-OS, OPTIFLO-III DELAYED RELEASE, SP BREAKER, WG-36 |
HALLIBURTON | Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, pH Adjusting Agent | Non-MSDS Components Not Provided by Supplier | Not Assigned | 0 | 0 | 0 | |
Polyacrylamide copolymer | Trade Secret | 0 | 0.01526 | 0 | ||||
SC30 | X CHEM | Scale Inhibitor | Sodium Polyacrylate | 009003-04-7 | 100 | 0.00867 | 0 | |
WG-36 | HALLIBURTON | Gelling Agent | Guar Gum | 009000-30-0 | 100 | 0.09332 | 0 | |
BA-40L | HALLIBURTON | pH Adjusting Agent | Potassium Carbonate | 000584-08-7 | 60 | 0.00003000 | 0 | |
FR-76 | HALLIBURTON | Friction Reducer | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 30 | 0.01289 | 0 | |
Proprietary Inorganic Salt | Trade Secret | 30 | 0.01289 | 0 | ||||
Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 1 | 0.0001 | 0 | |
SP BREAKER | HALLIBURTON | Breaker | Sodium Persulfate | 007775-27-1 | 100 | 0.00104 | 0 | |
HAI-OS | HALLIBURTON | Corrosion Inhibitor | Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00019 | 0 | |
Methanol (Methyl Alcohol) | 000067-56-1 | 60 | 0.00115 | 0 | ||||
BC-140 X2 | HALLIBURTON | Cross Linker | Monoethanolamine borate | 026038-87-9 | 60 | 0.0292 | 0 | |
Ethylene Glycol | 000107-21-1 | 30 | 0.0146 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-02-08 | H2O | 0 | 5088 Bbl | 334174 | Halliburton | STAGE 57/57
40 SHOTS |
2017-01-11 | H2O | 0 | 4044 Bbl | 191231 | Halliburton | STAGE 1/57
30 SHOTS STAGES 2-56 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CHESAPEAKE EXPLORATION LLC | 2340580 | 0 | 251 |
2018 | CHESAPEAKE EXPLORATION LLC | 1326797 | 0 | 288 |
2019 | EAP OHIO LLC | 265784 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 25812 | 251 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 4343 | 349 |
2019 | EAP OHIO LLC | Brine | 853 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1699850409 | 2017-11-6 0:00: | PW | No Violations | 0.50 |
-1762432076 | 2017-1-6 0:00:0 | CT | No Violations | 0.70 |
-257149158 | 2016-9-13 0:00: | CS | No Violations | 4.00 |
-309768616 | 2018-3-22 0:00: | PL | No Violations | 1.00 |
-965982507 | 2017-3-9 0:00:0 | CT | No Violations | 0.80 |
0257149158 | 2016-09-13 | Casing String Witnessed | No Violations | I am on site to witness the running and cementing of 13.375 inch surface casing. Nomac Rig 80 drilled a 17.5 inch diameter hole to a depth of 644 feet and set 620 feet of 13.375 inch 54 pound per foot casing. Schlumberger established circulation with fresh water, pumped 570 sacks of class A cement, 1.21 yield and 15.6 pound per gallon. Approximately 25 barrels of good quality cement returned to surface. The wiper plug landed and pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 800 psi for 5 minutes. |
0309768616 | 2018-03-22 | Preliminary Restoration | No Violations | On the day of my inspection I found this pad containing three properly labeled producing wellheads. Surface annular PSI is 0 and intermediate is 0 psi. Intermediate annular is equipped with motor valve leading to buried flow line. Production Equipment includes three gas production units, three sand seperators, and three 400 barrel steel tanks, inside their own steel containment. Pad is stable and vegetated. Site meets requirements on ORC 1509.072A for preliminary restoration. |
0606639693 | 2017-06-29 | Production Wells | No Violations | |
0960701100 | 2016-08-08 | Casing String Witnessed | No Violations | I am on site today to witness the cementing of 20 inch conductor casing. Express Energy Services drilled a 24 inch diameter hole to a depth of 121 feet and ran 120 feet of 20 inch diameter 94 pound per foot conductor casing. Express Energy Services pumped 15 barrels fresh water as a pre-flush, then pumped 230 sacks of class A cement, 1.18 yield, 15.6 pounds per gallon with 2 percent Calcium Chloride and 0.5 pound per sack flow seal. 50 percent excess was pumped and there was good circulation. I witnessed approximately 18 barrels of good cement return to surface, cement maintained a static level. There were no centralizers or flow shoe ran. |
0965982507 | 2017-03-09 | Completion Testing | No Violations | On the date of my inspection I found a well maintained lease road with a fence and gate. The pad is surrounded by an earthen dike with healthy vegetation and a fence with an open gate. The pad has 3 wells, 3 sand separators, 2 glycol dehydration units, 3 gas production units, and 3 shared 400 barrel tanks within a metal dike. The wellhead is equipped with a christmas tree valve. The wells have recently been stimulated and construction crews are onsite installing the production equipment and piping from the wellheads. |
1699850409 | 2017-11-06 | Production Wells | No Violations | |
1762432076 | 2017-01-06 | Completion Testing | No Violations | On the date of my inspection I found Chesapeake setting up equipment to begin hydraulic fracturing on all three wells on this pad. Frac stacks have been rigged up on the wells. Halliburton is currently setting up their sand containers on site. Containment for other equipment is also being set up. Chesapeake estimates frac operations to begin on 1/9/17. |
290559523 | 2019-9-19 0:00: | PW | No Violations | 1.00 |
606639693 | 2017-6-29 0:00: | PW | No Violations | 0.50 |
960701100 | 2016-8-8 0:00:0 | CS | No Violations | 3.00 |
For data sources see[10]