If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20639 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.49,"lon":-80.76,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Ross Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001385 | |
Farm/Lease Name: HENRY 8-11-3 | |
License Status: Producing | |
License Date: 2016-07-14 | |
Spud Date: 2016-08-06 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2016-09-08 | |
Well Total Depth: 23583.00 ft | |
Configuration: Horizontal | |
Latitude: 40.490000 | |
Longitude: -80.760000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-03-31 | Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:3/31/2016, Expired Date:3/31/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2016-07-14 | Proposed Formations:POINT PLEASANT, Issued Date:7/14/2016, Expired Date:7/14/2018 12:00:00 PM, Drilling unit acres:1019.76, Proposed Well Type:OG, Proposed Well Class:FWC |
Reached Total Depth | 2016-09-08 | |
Correction to Well | 2017-03-31 | UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 3/6/17-RC |
Completion Report Received | 2017-05-31 | |
Construction Permit Expires | 2018-07-14 | |
Change of Owner | 2018-12-18 | Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC |
Record Last Modified | 2018-12-18 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-03-17 | 9163 | 23459 | 0 |
9163 | 23459 | 0 | |
9163 | 23459 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/11/2017 | 02/08/2017 | 9042 | 11,408,100.0 | 937914 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 1 | 0.00011 | 0 |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 8.57751 | 0 | |
OPTIFLO-III DELAYED RELEASE | HALLIBURTON | Breaker | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 30 | 0.00074 | 0 | |
Ammonium Persulfate | 007727-54-0 | 100 | 0.00245 | 0 | ||||
HCL HYDROCHLORIC ACID | HALLIBURTON | Acid | Hydrochloric Acid | 007647-01-0 | 15 | 0.17046 | 0 | |
Water | 007732-18-5 | 85 | 0.96597 | 0 | ||||
BC-140 X2 | HALLIBURTON | Cross Linker | Monoethanolamine borate | 026038-87-9 | 60 | 0.02776 | 0 | |
Ethylene Glycol | 000107-21-1 | 30 | 0.01388 | 0 | ||||
Northern White Sand | HALLIBURTON | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 14.5887 | 0 | |
SP BREAKER | HALLIBURTON | Breaker | Sodium Persulfate | 007775-27-1 | 100 | 0.00083 | 0 | |
WG-36 | HALLIBURTON | Gelling Agent | Guar Gum | 009000-30-0 | 100 | 0.09938 | 0 | |
FR-76 | HALLIBURTON | Friction Reducer | Proprietary Inorganic Salt | Trade Secret | 30 | 0.0104 | 0 | |
Petroleum Distillate Hydrotreated Light | 064742-47-8 | 30 | 0.0104 | 0 | ||||
FE-1A | HALLIBURTON | Iron Control Agent | Acetic acid | 000064-19-7 | 60 | 0.00342 | 0 | |
Acetic Anhydride | 000108-24-7 | 100 | 0.0057 | 0 | ||||
SC30 | X CHEM | Scale Inhibitor | Sodium Polyacrylate | 009003-04-7 | 100 | 0.0094 | 0 | |
BA-40L, BC-140 X2, FE-1A, FR-76,
HAI-OS, OPTIFLO-III DELAYED RELEASE, SP BREAKER, WG-36 |
HALLIBURTON | Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, pH Adjusting Agent | Polyacrylamide copolymer | Trade Secret | 0 | 0.01237 | 0 | |
Non-MSDS Components Not Provided by Supplier | Not Assigned | 0 | 0 | 0 | ||||
BA-40L | HALLIBURTON | pH Adjusting Agent | Potassium Carbonate | 000584-08-7 | 60 | 0.00013 | 0 | |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 74.1254 | 0 | |
HAI-OS | HALLIBURTON | Corrosion Inhibitor | Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00019 | 0 | |
Methanol (Methyl Alcohol) | 000067-56-1 | 60 | 0.00112 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-02-08 | H2O | 0 | 4084 Bbl | 3294798 | Halliburton | STAGE 57/57
40 SHOTS |
2017-01-11 | H2O | 0 | 4837 Bbl | 201632 | Halliburton | STAGE 1/57
30 SHOTS STAGES 2-56 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CHESAPEAKE EXPLORATION LLC | 2359961 | 0 | 248 |
2018 | CHESAPEAKE EXPLORATION LLC | 1388411 | 0 | 282 |
2019 | EAP OHIO LLC | 258095 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 24039 | 248 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 6353 | 343 |
2019 | EAP OHIO LLC | Brine | 1283 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1534220635 | 2017-1-6 0:00:0 | CT | No Violations | 0.70 |
-1536452214 | 2017-6-29 0:00: | PW | No Violations | 0.50 |
-75115143 | 2018-3-22 0:00: | PL | No Violations | 1.00 |
0075115143 | 2018-03-22 | Preliminary Restoration | No Violations | On the day of my inspection I found this pad containing three properly labeled producing wellheads. Surface annular PSI is 0 and intermediate is 0 psi. Production Equipment includes three gas production units, three sand seperators, and three 400 barrel steel tanks, inside their own steel containment. Pad is stable and vegetated. Site meets requirements on ORC 1509.072A for preliminary restoration. |
0903709772 | 2017-11-06 | Production Wells | No Violations | |
1470620662 | 2016-08-07 | Casing String Witnessed | No Violations
- | |
1472262065 | 2016-08-26 | Casing String Witnessed | No Violations | I am on site to witness the running and cementing of 13.375 inch surface casing. Nomac Rig 80 drilled a 17.5 inch diameter hole to a depth of 637 feet and set 627 feet of 13.375 inch 54 pound per foot casing. Schlumberger established circulation with fresh water, pumped 510 sacks of class A cement, 1.21 yield and 15.6 pound per gallon. Approximately 40 barrels of good quality cement returned to surface. The wiper plug landed and pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 1100 psi for 5 minutes. |
1534220635 | 2017-01-06 | Completion Testing | No Violations | On the date of my inspection I found Chesapeake setting up equipment to begin hydraulic fracturing on all three wells on this pad. Frac stacks have been rigged up on the wells. Halliburton is currently setting up their sand containers on site. Containment for other equipment is also being set up. Chesapeake estimates frac operations to begin on 1/9/17. |
1536452214 | 2017-06-29 | Production Wells | No Violations | |
1912264232 | 2019-9-19 0:00: | PW | No Violations | 1.00 |
1961611634 | 2017-03-09 | Completion Testing | No Violations | On the date of my inspection I found a well maintained lease road with a fence and gate. The pad is surrounded by an earthen dike with healthy vegetation and a fence with an open gate. The pad has 3 wells, 3 sand separators, 2 glycol dehydration units, 3 gas production units, and 3 shared 400 barrel tanks within a metal dike. The wellhead is equipped with a christmas tree valve. The wells have recently been stimulated and construction crews are onsite installing the production equipment and piping from the wellheads. |
903709772 | 2017-11-6 0:00: | PW | No Violations | 0.50 |
For data sources see[10]