34-081-20644

Well Details

Well ID: 34-081-20644
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Salem Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001386
Farm/Lease Name: WILLIAMSON 12-10-3
License Status: Producing
License Date: 2016-07-21
Spud Date: 2016-10-10
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2016-12-05
Well Total Depth: 21936.00 ft
Configuration: Horizontal
Latitude: 40.450000
Longitude: -80.770000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-05-23 Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:5/23/2016, Expired Date:5/23/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-07-21 Proposed Formations:POINT PLEASANT, Issued Date:7/21/2016, Expired Date:7/21/2018 12:00:00 PM, Drilling unit acres:285.59, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2016-12-05
Correction to Well 2017-02-24 UPDATE TARGET/TAKEPOINT/ACREAGE PER AS-DRILLED PLAT RCVD 1/31/17-ALE
Correction to Well 2017-06-30 UPDATE TAKE PER AS-COMPLETED PLAT RCVD 6-22-17 ALE
Completion Report Received 2017-08-28
Construction Permit Expires 2018-07-21
Change of Owner 2018-12-18 Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC
Record Last Modified 2018-12-18

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-09-01 9644 9768 0
2017-09-01 21720 21812 0
21720 21812 0
9644 9768 0
9644 9768 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/09/2017 05/30/2017 8970 26,069,700.0 1,938,450.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 15% HCl Acid HALLIBURTON Acid Muriatic Acid Hydrogen Chloride 7647-01-0 30 0.24115 0
Northern White Sand HALLIBURTON Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 12.0561 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 1 0.00008000 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 3.78898 0
7.5%HCL HYDROCHLORIC ACID HALLIBURTON Acid Hydrochloric Acid 007647-01-0 8 0.01201 0
Water 007732-18-5 93 0.14814 0
SC-30 FOUNTAIN QUAIL Scale Inhibitor Sodium Hydroxide 1310-73-2 2 0.00025 0
FE-1A, FR-76, HAI-OS HALLIBURTON Corrosion Inhibitor, Friction Reducer, Iron Control Agent Non-MSDS Components Not Provided by Supplier Not Assigned 0 0 0
Polyacrylamide copolymer Trade Secret 0 0.03235 0
FE-1A HALLIBURTON Iron Control Agent Acetic Anhydride 000108-24-7 100 0.0077 0
Acetic acid 000064-19-7 60 0.00462 0
FR-76 HALLIBURTON Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 30 0.02809 0
Proprietary Inorganic Salt Trade Secret 30 0.02809 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 81.2137 0
HAI-OS HALLIBURTON Corrosion Inhibitor Methanol (Methyl Alcohol) 000067-56-1 60 0.00149 0
Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00025 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-05-09 H2O 8 369096 Gal 320907 Halliburton STAGE 1 OF 85
2017-05-30 H2O 15 275688 Gal 413787 Halliburton STAGE 85 OF 85-SEE IMAGES FOR STAGES 2-84

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC 2248281 0 184
2018 CHESAPEAKE EXPLORATION LLC 2756110 0 302
2019 EAP OHIO LLC 375573 0 74

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC Brine 36645 184
2018 CHESAPEAKE EXPLORATION LLC Brine 16187 363
2019 EAP OHIO LLC Brine 2385 74

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1502846379 2019-7-15 0:00: PW No Violations 1.00
-2093007982 2019-8-7 0:00:0 PW No Violations 1.00
-682847019 2019-6-5 0:00:0 PW No Violations 1.00
-686514310 2017-4-6 0:00:0 CT No Violations 0.20
-772019974 2019-8-15 0:00: PW No Violations 1.00
-971028568 2019-7-2 0:00:0 PW No Violations 1.00
0091445085 2016-10-12 Drill / Deepen / Reopen No Violations Today I am onsite to witness topping out the conductor for this well. Cement was measured at 63 feet below ground surface with water at 58 feet. Grout was used to top out the conductor annulus since there was only 5 feet of water on top of the cement. The grout was mixed to an acceptable consistency and minimal water returned to surface. Grout was brought to 80 inches in the tin horn. The seal in the bottom of the tin horn was approximately 18 inches thick.
0474858894 2016-11-22 Drill / Deepen / Reopen No Violations On the date of my inspection I found Nomac 80 rigging up on the pad. The rig is approximately 20 percent moved in. I spoke with Chesapeake company man Chris, who indicated that the rig should be completely moved by early morning on 11/23.
0682847019 2019-06-05 Production Wells No Violations On the day of my inspection I was accompanied my Supervisor Eric Conrad. This well is shut in for SIMOPS on pad. A Profrac crew is onsite to stimulate the 1H, 5H, and 205H wells. The 9.625x5.5 annular pressure is 56 psi. Production gauges reads zero.
0686514310 2017-04-06 Completion Testing No Violations On the date of my inspection I found a well maintained access road with a locked gate. The pad has 2 drilled wells, 2 sand separators, 2 gas production units, and 2 shared 400 barrel tank within a metal dike. The pad is surrounded by an earthen dike covered by healthy vegetation. Both wells were drilled in 2016. Completion equipment has started to be moved onsite.
1038569975 2019-7-15 0:00: PW No Violations 0.70
1374822042 2018-03-22 Preliminary Restoration No Violations On the day of my inspection I found this pad containing two properly labeled producing wellheads. Surface annular PSI is 0 and intermediate is 580 psi. The intermediate annular pipe on this well and the 661 well have a motor valve on them and both of these wells intermediate annuli are plumbed together into a buried flowline. Production Equipment includes two gas production units, two sand seperators, and two 400 barrel steel tanks, inside their own steel containment. Pad is stable and vegetated. Site meets requirements on ORC 1509.072A for preliminary restoration.
1476282956 2016-10-11 Drill / Deepen / Reopen No Violations 0930 am - Chesapeake set the conductor for this permit number on 10/10/16. David Newman informed me this morning that cement was tagged at 96 feet down the annulus, with water at 68 feet. He planned to ready-mix the remaining portion to surface. I was onsite to verify these numbers. I spoke with Mike Moreland about this plan and expressed that I thought a 1 inch tremie pipe and grout should be used to bring cement to surface and he agreed. I informed David of the requirements for completing the cement job. This work will be completed later today.
1480121458 2016-11-25 Casing String Witnessed No Violations I am on site to witness the running and cementing of 13.375 inch surface casing. Nomac Rig 80 drilled a 17.5 inch diameter hole to a depth of 835 feet and set 829 feet of 13.375 inch 54 pound per foot casing. Schlumberger established circulation with fresh water, pumped 748 sacks of class A cement, 1.21 yield and 15.6 pound per gallon. Approximately 41 barrels of good quality cement returned to surface. The wiper plug landed and pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 800 psi for 5 minutes.
1499261137 2017-07-05 Completion Testing No Violations
1562593595 2019-7-8 0:00:0 PW No Violations 1.00
1564661956 2019-8-1 0:00:0 PW No Violations 1.00
1724006708 2016-11-23 Drill / Deepen / Reopen No Violations Today I inspected the route used to transport Nomac 80 from the Austin Lakes pad to the Williamson pad. No spills were evident along the route. Nomac 80 is 100 percent moved to the Williamson pad and is working on rigging up.
1890246643 2019-7-22 0:00: PW No Violations 1.00
2002101996 2019-8-7 0:00:0 PW No Violations 1.00
2056367625 2017-11-16 Production Wells No Violations
474858894 2016-11-22 0:00 DD No Violations 1.00
91445085 2016-10-12 0:00 DD No Violations 5.00
987969594 2019-6-18 0:00: PW No Violations 1.00

For data sources see[10]

References