34-081-20647

Well Details

Well ID: 34-081-20647
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Salem Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001551
Farm/Lease Name: OLD OAK FARM 6-10-3
License Status: Producing
License Date: 2018-05-10
Spud Date: 2018-05-14
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-07-12
Well Total Depth: 21635.00 ft
Configuration: Horizontal
Latitude: 40.460000
Longitude: -80.750000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-06-20 Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:6/20/2016, Expired Date:6/20/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Correction to Well 2017-09-15 CHANGE TO WELL NUMBER FROM 1 TO 5
APP 2018-05-10 Proposed Formations:POINT PLEASANT, Issued Date:5/10/2018, Expired Date:5/9/2020 12:00:00 PM, Drilling unit acres:301.433, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-07-12
Correction to Well 2018-08-31 TAKE TARGET AS-DRILLED
Change of Owner 2018-12-18 Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC
Completion Report Received 2019-01-11
Record Last Modified 2019-01-16
Construction Permit Expires 2020-05-09

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-01-15 9304 9464 0
2019-01-15 21408 21504 0
21408 21504 0
9304 9464 0
9304 9464 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/11/2018 09/08/2018 8976.5 15,478,200.0 1,118,310.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Northern White Sand HALLIBURTON Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 1 0.13154 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.73343 0
SC-30 FOUNTAIN QUAIL Scale Inhibitor Sodium Hydroxide 1310-73-2 0.02 0 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.12211 0
LD-2900 MULTI-CHEM Friction Reducer Distillates (petroleum), Hydrotreated Light 64742-47-8 0.3 0 0
Poly(oxy-1.2-ethanediyl), a-tridecyl-w-hydroxy-, branched 69011-36-5 0.05 0 0
OptiKleen-WF HALLIBURTON Breaker Sodium perborate tetrahydrate 010486-00-7 1 0.00002000 0
HAI-OS HALLIBURTON Corrosion Inhibitor Methanol (Methyl Alcohol) 000067-56-1 0.6 0.00001000 0
Propargyl Alcohol (2-Propynol) 000107-19-7 0.1 0 0
FE-2A HALLIBURTON Iron Control Agent Citric Acid 000077-92-9 0.6 0.00004000 0
FDP-S1320-18, FE-2A, FightR EC-1,

HAI-OS, OptiKleen-WF, SP BREAKER

HALLIBURTON Breaker, Corrosion Inhibitor, Friction Reducer, Iron Control Agent Not Provided Not Assigned 1 0.00039 0
Enter Chemical Name... Not Assigned 0 0 0
Non-MSDS Components Not Provided by Supplier Not Assigned 0 0 0
SP BREAKER HALLIBURTON Breaker Sodium Persulfate 007775-27-1 1 0.00002000 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 0.01 0 0
15% HCl Acid HALLIBURTON Acid Hydrochloric Acid 7647-01-0 0.3 0.00365 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-08-11 H2O 15 194233 Gal 200860 Halliburton STAGE 1/62

STAGES 2-60 SEE IMAGES

2018-09-08 H2O 15 218062 Gal 325660 Halliburton STAGE 62/62

STAGES 2-61 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 CHESAPEAKE EXPLORATION LLC 628034 0 29
2019 EAP OHIO LLC 920619 0 75

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 CHESAPEAKE EXPLORATION LLC Brine 0 0
2019 EAP OHIO LLC Brine 18730 75

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1325927511 2020-9-21 0:00: PW No Violations 0.50
-1397885549 2019-4-23 0:00: PL No Violations 1.00
-1697077239 2018-8-9 0:00:0 CT No Violations 1.00
-694469487 2018-7-13 0:00: DD No Violations 1.00
-977684844 2018-8-14 0:00: CT No Violations 2.00
0066727537 2018-06-26 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 580 was drilling an 8.75 inch diameter hole at 6335 feet. Walk around inspection revealed no issues with containment. No flare during inspection.
0217725251 2018-05-15 Casing String Witnessed No Violations Pad address is 1136 township road 259, Richmond Ohio. On the day of my inspection I witnessed Express had augured a 26 inch diameter hole to 120 feet. 120 feet of 20 inch diameter conductor casing was run. Express was onsite with 230 sacks of class A cement. Additives include 2% CaCl and .5 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. 50 percent excess ran. Cement was displaced with 39 barrels of fresh water. No returns to surface. Cement fell back from ~30 to 60 feet after puming. Company man David Newman will tag cement after it solidifies and call me with results. Top out will be 5/15 or 5/16.
0361714087 2018-07-27 Completion Testing No Violations On the day of my inspection I witnessed 9 Energy running a CBL on the 1H. No frack crew onsite yet. Company man said they would be opening the toe valves on Monday. Surface and annular gauges read 0.
0694469487 2018-07-13 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed wyonming casing running 5.5 inch diameter production casing. 23#/ft grade p-110. Well was drilled to a total depth of 21635. Kick off point was 8338 and landing point was 9329. this is the last well on this pad and rig will leave for Pennsylvania starting Monday. Cement job will be late tonight.
0977684844 2018-08-14 Completion Testing No Violations On the day of my inspection I witnessed a Halliburton frac crew rigged up on well. ID to company men Fletcher Brand and Rudy. Surface annular pressure is zero. Intermediate annular pressure is 289 psi. A composite plug is at 10560 and operator has a tractor with a mill on it coming out to try and mill the plug out. They fracked stage 1 and were setting plug for casing test. Plug failed and needs milled out.
1044405085 2018-08-20 Completion Testing No Violations On the day of my inspection I witnessed a Halliburton frac crew on site. ID to company men Rudy and Fletcher. Surface annular pressure is 0 and intermediate annular pressure is 216 psi, prior to frac. Last week they had brought a tractor on location that had a mill. They went down hole and milled out the center of the plug but did not get the slips. They anticipate bringing in Stone rig 15 or coiled tubing unit later in week to drill out the plug so they can continue fracking.
1397885549 2019-04-23 Preliminary Restoration No Violations On the day of my inspection I witnessed this pad to contain 3 producing wells. Production equipment includes three sand seperators, three GPUs, and six line heaters that are not plumbed in. Three 400 barrel steel produced water tanks are in their own containment. The 13.375x9.625 annular pressure is 0 psi and the 9.625x5.5 annular pressure is 1400 psi. The 9.625x5.5 annular is plumbed into a flowline. Pad slopes are stable and vegetated. Site meets requirements of 1509.072 (A) for preliminary restoration.
1526474304 2018-05-16 Casing String Witnessed No Violations On the day of my inspection I witnessed Superintenant David Newman tag cement at 68 feet from ground surface. Backside was grouted back to surface with approximately 8 yards of grout.
1530542055 2018-07-02 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Schlumberger pump an 800 foot plug with 25% excess (~1000 feet total). Bottom of plug is 6795 feet and top is estimated around 5800 feet. 28 barrels of 13.0 ppg mud push was pumped prior to 74.4 barrels of 17.5 ppg class H cement with .94 yield. Cement was followed with 12 barrels of 13 ppg mud push. Plug displaced with 102 barrels of oil based mud. This kick off plug was set because the rig lost a fish in the wellbore. Total depth drilled was 8340. Top of fish is at 6847 feet, fish is 1445 feet long and consists of 3 joints of drill pipe, 5 crossover subs, 2 antenna subs, 2 indexing tools, drill collars, MWD tool, shock sub, mud motor, and bit.
1599754002 2020-8-31 0:00: PW No Violations 0.50
1697077239 2018-08-09 Completion Testing No Violations On the day of my inspection I found a Halliburton frac crew on location. ID to compnay man Dave. He said they should be starting to frac in the next day or two. Surface and intermediate annular pressures are zero.
217725251 2018-5-15 0:00: CS No Violations 1.00
361714087 2018-7-27 0:00: CT No Violations 1.00
66727537 2018-6-26 0:00: DD No Violations 1.00

For data sources see[10]