34-081-20653

Well Details

Well ID: 34-081-20653
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Salem Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001551
Farm/Lease Name: OLD OAK FARM 6-10-3
License Status: Producing
License Date: 2018-05-10
Spud Date: 2018-05-15
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-06-21
Well Total Depth: 21783.00 ft
Configuration: Horizontal
Latitude: 40.460000
Longitude: -80.750000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-06-20 Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:6/20/2016, Expired Date:6/20/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Correction to Well 2017-09-15 CHANGE TO WELL NUMBER FROM 206 TO 3
APP 2018-05-10 Proposed Formations:POINT PLEASANT, Issued Date:5/10/2018, Expired Date:5/9/2020 12:00:00 PM, Drilling unit acres:301.433, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-06-21
Correction to Well 2018-08-31 TAKE TARGET AS-DRILLED
Change of Owner 2018-12-18 Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC
Completion Report Received 2019-01-11
Record Last Modified 2019-06-11
Construction Permit Expires 2020-05-09

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/11/2018 09/06/2018 8984 14,999,700.0 1,133,500.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 10.5249 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 1 0 0
OptiKleen-WF HALLIBURTON Breaker Sodium perborate tetrahydrate 010486-00-7 100 0.00258 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 74.4039 0
SC-30 FOUNTAIN QUAIL Scale Inhibitor Sodium Hydroxide 1310-73-2 2 0.00013 0
HAI-OS HALLIBURTON Corrosion Inhibitor Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00019 0
Methanol (Methyl Alcohol) 000067-56-1 60 0.00112 0
SP BREAKER HALLIBURTON Breaker Sodium Persulfate 007775-27-1 100 0.0004 0
15% HCl Acid HALLIBURTON Acid Hydrochloric Acid 7647-01-0 30 0.36635 0
FE-2A HALLIBURTON Iron Control Agent Citric Acid 000077-92-9 60 0.00392 0
Northern White Sand HALLIBURTON Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 13.7386 0
FDP-S1320-18, FE-2A, FightR EC-1,

HAI-OS, OptiKleen-WF, SP BREAKER

HALLIBURTON Breaker, Corrosion Inhibitor, Friction Reducer, Iron Control Agent Not Provided Not Assigned 100 0.06914 0
Enter Chemical Name... Not Assigned 0 0 0
Non-MSDS Components Not Provided by Supplier Not Assigned 0 0 0
LD-2900 MULTI-CHEM Friction Reducer Poly(oxy-1.2-ethanediyl), a-tridecyl-w-hydroxy-, branched 69011-36-5 5 0.00023 0
Distillates (petroleum), Hydrotreated Light 64742-47-8 30 0.00139 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-08-20 H2O 0 5316 Bbl 338285 Halliburton On the day of my inspection I witnessed a Halliburton frac crew on site. ID to company men Rudy and Fletcher. Surface annular pressure is 0 and intermediate annular pressure is 21 psi, prior to frac. Nine wireline set frac plug at 17769 feet. Bottom perforation is at 17750 and top perforation is at 17590. Well perforated with 5 guns with 6 shots on 40 foot spacing. Operator pumped 3000 gallons of 15% Hcl acid. Total job was 5316 barrels. 338285 lbs of sand pumped, 96281 lbs of 100 mesh and 24400

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 CHESAPEAKE EXPLORATION LLC 682719 0 30
2019 EAP OHIO LLC 945820 0 76

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 CHESAPEAKE EXPLORATION LLC Brine 0 0
2019 EAP OHIO LLC Brine 14294 76

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-25799170 2018-7-27 0:00: CT No Violations 1.00
-491269232 2020-8-31 0:00: PW No Violations
-567358602 2018-8-14 0:00: CT No Violations 2.00
-659539647 2018-5-16 0:00: CS No Violations 2.00
-879883289 2018-6-22 0:00: DD No Violations 1.00
0025799170 2018-07-27 Completion Testing No Violations On the day of my inspection I witnessed 9 energy running a CBL on the 1H well. No frack crew onsite yet. Company man said they would be opening the toe valves on Monday. Surface and annular gauges read 0.
0099795449 2019-04-23 Preliminary Restoration No Violations On the day of my inspection I witnessed this pad to contain 3 producing wells. Production equipment includes three sand seperators, three GPUs, and six line heaters that are not plumbed in. Three 400 barrel steel produced water tanks are in their own containment. The 13.375x9.625 annular pressure is 0 psi and the 9.625x5.5 annular pressure is 500 psi. Pad slopes are stable and vegetated. Site meets requirements of 1509.072 (A) for preliminary restoration.
0469701928 2018-08-09 Completion Testing No Violations On the day of my inspection I found a Halliburton frac crew on location. ID to compnay man Dave. He said they should be starting to frac in the next day or two. Surface and intermediate annular pressures are zero.
0567358602 2018-08-14 Completion Testing No Violations On the day of my inspection I witnessed a Halliburton frac crew rigged up on well. ID to company men Fletcher Brand and Rudy. Stage 6 has plug set at 20747, bottom perforation at 20727, and top perforation at 20568. Perforations were shot with 5 guns with 6 shots each. 3000 gallons of 15% HCl pumped along with 100000 lbs of 100 mesh sand and 230000 lbs of 40/70 mesh sand. Total job volume pumped was 5452 barrels. ISIP was 6219. Shut in pressure on well was 5876 at about 3 minutes. They do not do a 5, 10, or 15 minute ISIP. Average pressure was 9846 and average rate was 85 barrels per minute. Break down pressure was 7143. Surface annular pressure is zero. Intermediate annular pressure is 74 psi.
0659539647 2018-05-16 Casing String Witnessed No Violations Pad address is 1136 township road 259, Richmond Ohio. On the day of my inspection I witnessed Express had augured a 26 inch diameter hole to 120 feet. 120 feet of 20 inch diameter conductor casing was run. Express was onsite with 230 sacks of class A cement. Additives include 2% CaCl and .5 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. 50 percent excess ran. Cement was displaced with 39 barrels of fresh water. 15 barrels of cement returned to surface.
0879883289 2018-06-22 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Wyoming Casing is running 5.5 inch diameter production casing. Patterson 580 reached a total depth of 21783 on 6/21. This afternoon there will be a cement job and I will return then.
1035971254 2020-9-21 0:00: PW No Violations 0.50
1297010489 2018-05-17 Casing String Witnessed No Violations On the day of my inspetion I witnessed a worm had developed in the cement that was pumped yesterday. The information I received this morning via phone call indicated cement had fallen to 50. Upon inspection of the cement I found a worm hole that was 8 feet deep. Kris Gonzales, Chesapeake Superintenant was also onsite because of the misinformation. I stuck around to watch Express do mouse holes while waiting on grout truck to fill the hole. One yard placed in worm hole and cellar floor.
1528833251 2018-06-12 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 580 was drilling an 8.75 inch diameter hole at a depth of 6100 feet. Walk around location revealed no issues with containment. Company Man Danny Lambert was advised to get a vac on location to dispose of rain water within containment as it was nearly full near the northwest corner of the pad. Area has received significant rains over the last few days and more rain is expected.
1529691482 2018-06-22 Casing String Witnessed No Violations On the day of my inspection I witnessed Wyoming casing ran 21786 feet of 23#/ft 5.5 inch diameter production casing with a stick 3.7 foot stick up. Shoe track is 88 feet long. O-tex/CJs onsite with 351 barrels (1480 sacks) of 14 ppg lead cement and 681 barrels (3160 sacks) of 15.6 ppg tail cement. Yields are 1.33 and 1.21 respectively. Lead cement is 50% class H/ 50% poz mix. Tail cement is class H. 100 barrel of 13 ppg spacer. Job is figuered with 15% excess on 8.75 inch diameter hole. Casing was centralized. 458 barrels of displacement calculated.
1534774593 2018-08-20 Completion Testing No Violations On the day of my inspection I witnessed a Halliburton frac crew on site. ID to company men Rudy and Fletcher. Surface annular pressure is 0 and intermediate annular pressure is 21 psi, prior to frac. Nine wireline set frac plug at 17769 feet. Bottom perforation is at 17750 and top perforation is at 17590. Well perforated with 5 guns with 6 shots on 40 foot spacing. Operator pumped 3000 gallons of 15% Hcl acid. Total job was 5316 barrels. 338285 lbs of sand pumped, 96281 lbs of 100 mesh and 244004 40/70 mesh. Break down pressure was 7702 at 15 barrels per minute. Average rate was 81.5 barrels per minute. Average pressure was 10392 with a max pressure of 11537. ISIP of 6760.
469701928 2018-8-9 0:00:0 CT No Violations 1.00
99795449 2019-4-23 0:00: PL No Violations 1.00

For data sources see[9]