Well ID: 34-081-20667 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.44,"lon":-80.7,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Island Creek Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001427 | |
Farm/Lease Name: ACTON 23-7-2 | |
License Status: Producing | |
License Date: 2017-02-15 | |
Spud Date: 2017-04-15 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2017-07-17 | |
Well Total Depth: 19115.00 ft | |
Configuration: Horizontal | |
Latitude: 40.440000 | |
Longitude: -80.700000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-11-29 | Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:11/29/2016, Expired Date:11/29/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-02-15 | Proposed Formations:POINT PLEASANT, Issued Date:2/15/2017, Expired Date:2/15/2018 12:00:00 PM, Drilling unit acres:240.79, Proposed Well Type:OG, Proposed Well Class:FWC |
Reached Total Depth | 2017-07-17 | |
Correction to Well | 2017-12-29 | UPDATE TARGET/TAKE/ACREAGE PER AS-DRILLED PLAT |
Completion Report Received | 2018-02-05 | |
Construction Permit Expires | 2018-02-15 | |
Change of Owner | 2018-12-18 | Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC |
Record Last Modified | 2018-12-18 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-02-09 | 10073 | 10296 | 30 |
2018-02-09 | 19251 | 19474 | 30 |
19251 | 19474 | 30 | |
10073 | 10296 | 30 | |
10073 | 10296 | 30 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/25/2017 | 10/07/2017 | 9415 | 7,273,100.0 | 654794 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | OPTIFLO-III DELAYED RELEASE | HALLIBURTON | Breaker | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 30 | 0.00046 | 0 |
Ammonium Persulfate | 007727-54-0 | 100 | 0.00153 | 0 | ||||
FR-76 | HALLIBURTON | Friction Reducer | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 30 | 0.01783 | 0 | |
Proprietary Inorganic Salt | Trade Secret | 30 | 0.01783 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 67.7154 | 0 | |
7.5%HCL HYDROCHLORIC ACID | HALLIBURTON | Acid | Water | 007732-18-5 | 93 | 0.55896 | 0 | |
Hydrochloric Acid | 007647-01-0 | 8 | 0.04532 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 14.5111 | 0 | |
Northern White Sand | HALLIBURTON | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 14.2411 | 0 | |
SP BREAKER | HALLIBURTON | Breaker | Sodium Persulfate | 007775-27-1 | 100 | 0.00053 | 0 | |
15% HCl Acid | HALLIBURTON | Acid | Hydrochloric Acid | 7647-01-0 | 30 | 0.19065 | 0 | |
FE-1A | HALLIBURTON | Iron Control Agent | Acetic acid | 000064-19-7 | 60 | 0.0053 | 0 | |
Acetic Anhydride | 000108-24-7 | 100 | 0.00883 | 0 | ||||
Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 1 | 0.00013 | 0 | |
BC-140 X2 | HALLIBURTON | Cross Linker | Monoethanolamine borate | 026038-87-9 | 60 | 0.02412 | 0 | |
Ethylene Glycol | 000107-21-1 | 30 | 0.01206 | 0 | ||||
BC-140 X2, FE-1A, FR-76, HAI-OS,
OPTIFLO-III DELAYED RELEASE, SP BREAKER, WG-36 |
HALLIBURTON | Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent | Non-MSDS Components Not Provided by Supplier | Not Assigned | 0 | 0 | 0 | |
Polyacrylamide copolymer | Trade Secret | 30 | 0.02116 | 0 | ||||
SC-30 | FOUNTAIN QUAIL | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 2 | 0.00013 | 0 | |
WG-36 | HALLIBURTON | Gelling Agent | Guar Gum | 009000-30-0 | 100 | 0.08938 | 0 | |
HAI-OS | HALLIBURTON | Corrosion Inhibitor | Methanol (Methyl Alcohol) | 000067-56-1 | 60 | 0.00172 | 0 | |
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00029 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-09-25 | H2O | 0 | 7697 Bbl | 331084 | Halliburton | STAGE 1/34
STAGES 2-33 SEE IMAGES |
2017-10-07 | H2O | 0 | 3708 Bbl | 335804 | Halliburton | STAGE 34/34
STAGES 2-33 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CHESAPEAKE EXPLORATION LLC | 315735 | 0 | 26 |
2018 | CHESAPEAKE EXPLORATION LLC | 1737268 | 0 | 290 |
2019 | EAP OHIO LLC | 234491 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 7091 | 26 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 5869 | 351 |
2019 | EAP OHIO LLC | Brine | 608 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-966656635 | 2017-9-19 0:00: | CT | No Violations | 0.40 |
0083238759 | 2017-07-05 | Drill / Deepen / Reopen | No Violations | On the date of my inspection I found Nomac drilling rig 80 had just started drilling the surface string of this well. They are currently drilling ahead at approximately 230 feet. They plan to drill the 17.5 inch hole to 626 feet and set 616 feet of 13.375 inch 54.5 pound casing. The Chesapeake company man estimates they will reach total depth by around 1 pm. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking. Chesapeake plans to drill the surface strings on all 3 wells on this location before going back to complete drilling the rest of the wells. |
0138717930 | 2017-11-16 | Completion Testing | No Violations | On the date of my inspection I found a well maintained access road with an unlocked gate. The pad has 3 drilled wells, 3 vertical sand separators, 3 gas production units, and three 400 barrel tanks within a metal dike. There are not any identification tags on the production equipment. All of the production equipment is surrounded by concrete barriers. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. Currently Stone Well Service has a rig on site for drill out operations. The plugs in this well have been drilled out and they are currently working on the 9H. |
0966656635 | 2017-09-19 | Completion Testing | No Violations | On the date of my inspections I found a well maintained access road with an unlocked gate. The pad has 3 drilled wells. Halliburton moving equipment onto the pad for hydraulic fracturing operations. The Halliburton foreman expects to be moved in and beginning operations by 9/23/17. The production equipment has already been installed on the pad and currently includes 3 sand traps, 3 gas production units, and three 400 barrel tanks surrounded by a metal dike. The pad is surrounded by an earthen berm covered by healthy vegetation with the exception of where the pipeline has recently tied into the pad. |
1288163309 | 2017-07-05 | Casing String Witnessed | No Violations | I am on site to witness the cementing of 13.375 inch surface casing. Nomac 80 drilled a 17.5 inch diameter hole to a depth of 626 feet and set 616 feet of centralized 13.375 inch 54.5 pound per foot casing. Schlumberger established circulation with fresh water, pumped 25 barrels of bentonite gel spacer followed by 10 barrels of water, then pumped 520 sacks of class A cement (1.2 yield and 15.6 pound per gallon, Surface Set). The wiper plug was released and Schlumberger displaced with 88 barrels of fresh water. By the time the plug landed approximately 21 barrels of cement had returned to surface. When the plug landed, pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 900 psi for 5 minutes. |
138717930 | 2017-11-16 0:00 | CT | No Violations | 0.50 |
1411850221 | 2017-07-26 | Drill / Deepen / Reopen | No Violations | On the date of my inspection I found Patterson drilling rig 580 drilling the curve at approximately 9483 feet. Chesapeake anticipates landing the curve and beginning the lateral portion of the well this afternoon. During my inspection I found two pallets of chemicals (hydrated line and calcium carbonate) outside of containment staged near the mixing house. The containment on the eastern side of the back yard area has large portions torn off. Also, I found a large puncture in the containment around the catwalk. I spoke with the Chesapeake company man about the issues and he indicated that he would call the containment contractor out to repair the torn areas and add containment to the mixing house area. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking. |
1501680698 | 2017-08-02 | Drill / Deepen / Reopen | No Violations | On the date of my inspection I found Patterson drilling rig 580 tripping out of the hole after reaching their total depth of 19605 feet. Chesapeake anticipates running casing this afternoon and cementing the production string on 8/3/17. During my inspection I found multiple punctures and tears in the containment near the changing house. I spoke with the Chesapeake company man about the issues and he indicated that he would call the containment contractor out to repair the damaged areas. All chemicals are within containment. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking. |
1507814106 | 2017-10-12 | Completion Testing | No Violations | On the date of my inspection, I found a well maintained lease road with an unlocked gate. The pad is surrounded by a fenced earthen dike covered with healthy vegetation. All three wells on the pad have recently been hydraulically fractured. Equipment remaining on site from frac operations include a man lift, 3 residual waste containers, 13 frac tanks, a skid steer, a 3 forklifts, 2 roll off trash containers, walls components for an above ground storage tank, and the secondary containment mats. The wells are equipped with a wellhead that has chains looped through the valve handles to prevent tampering. Production equipment on the pad includes three 400 barrel tanks within a metal dike, 3 sand separators, and 3 gas production units. Currently a pipeline crew is tying the gas pipeline into the production equipment. |
1573834150 | 2019-11-15 0:00 | PL | No Violations | 1.00 |
83238759 | 2017-7-5 0:00:0 | DD | No Violations | 1.50 |
For data sources see[10]