34-081-20667

Well Details

Well ID: 34-081-20667
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Island Creek Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001427
Farm/Lease Name: ACTON 23-7-2
License Status: Producing
License Date: 2017-02-15
Spud Date: 2017-04-15
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-07-17
Well Total Depth: 19115.00 ft
Configuration: Horizontal
Latitude: 40.440000
Longitude: -80.700000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-11-29 Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:11/29/2016, Expired Date:11/29/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-02-15 Proposed Formations:POINT PLEASANT, Issued Date:2/15/2017, Expired Date:2/15/2018 12:00:00 PM, Drilling unit acres:240.79, Proposed Well Type:OG, Proposed Well Class:FWC
Reached Total Depth 2017-07-17
Correction to Well 2017-12-29 UPDATE TARGET/TAKE/ACREAGE PER AS-DRILLED PLAT
Completion Report Received 2018-02-05
Construction Permit Expires 2018-02-15
Change of Owner 2018-12-18 Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC
Record Last Modified 2018-12-18

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-02-09 10073 10296 30
2018-02-09 19251 19474 30
19251 19474 30
10073 10296 30
10073 10296 30

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/25/2017 10/07/2017 9415 7,273,100.0 654794

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 OPTIFLO-III DELAYED RELEASE HALLIBURTON Breaker Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 30 0.00046 0
Ammonium Persulfate 007727-54-0 100 0.00153 0
FR-76 HALLIBURTON Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 30 0.01783 0
Proprietary Inorganic Salt Trade Secret 30 0.01783 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 67.7154 0
7.5%HCL HYDROCHLORIC ACID HALLIBURTON Acid Water 007732-18-5 93 0.55896 0
Hydrochloric Acid 007647-01-0 8 0.04532 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 14.5111 0
Northern White Sand HALLIBURTON Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 14.2411 0
SP BREAKER HALLIBURTON Breaker Sodium Persulfate 007775-27-1 100 0.00053 0
15% HCl Acid HALLIBURTON Acid Hydrochloric Acid 7647-01-0 30 0.19065 0
FE-1A HALLIBURTON Iron Control Agent Acetic acid 000064-19-7 60 0.0053 0
Acetic Anhydride 000108-24-7 100 0.00883 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 1 0.00013 0
BC-140 X2 HALLIBURTON Cross Linker Monoethanolamine borate 026038-87-9 60 0.02412 0
Ethylene Glycol 000107-21-1 30 0.01206 0
BC-140 X2, FE-1A, FR-76, HAI-OS,

OPTIFLO-III DELAYED RELEASE, SP BREAKER, WG-36

HALLIBURTON Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent Non-MSDS Components Not Provided by Supplier Not Assigned 0 0 0
Polyacrylamide copolymer Trade Secret 30 0.02116 0
SC-30 FOUNTAIN QUAIL Scale Inhibitor Sodium Hydroxide 1310-73-2 2 0.00013 0
WG-36 HALLIBURTON Gelling Agent Guar Gum 009000-30-0 100 0.08938 0
HAI-OS HALLIBURTON Corrosion Inhibitor Methanol (Methyl Alcohol) 000067-56-1 60 0.00172 0
Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00029 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-09-25 H2O 0 7697 Bbl 331084 Halliburton STAGE 1/34

STAGES 2-33 SEE IMAGES

2017-10-07 H2O 0 3708 Bbl 335804 Halliburton STAGE 34/34

STAGES 2-33 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC 315735 0 26
2018 CHESAPEAKE EXPLORATION LLC 1737268 0 290
2019 EAP OHIO LLC 234491 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC Brine 7091 26
2018 CHESAPEAKE EXPLORATION LLC Brine 5869 351
2019 EAP OHIO LLC Brine 608 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-966656635 2017-9-19 0:00: CT No Violations 0.40
0083238759 2017-07-05 Drill / Deepen / Reopen No Violations On the date of my inspection I found Nomac drilling rig 80 had just started drilling the surface string of this well. They are currently drilling ahead at approximately 230 feet. They plan to drill the 17.5 inch hole to 626 feet and set 616 feet of 13.375 inch 54.5 pound casing. The Chesapeake company man estimates they will reach total depth by around 1 pm. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking. Chesapeake plans to drill the surface strings on all 3 wells on this location before going back to complete drilling the rest of the wells.
0138717930 2017-11-16 Completion Testing No Violations On the date of my inspection I found a well maintained access road with an unlocked gate. The pad has 3 drilled wells, 3 vertical sand separators, 3 gas production units, and three 400 barrel tanks within a metal dike. There are not any identification tags on the production equipment. All of the production equipment is surrounded by concrete barriers. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. Currently Stone Well Service has a rig on site for drill out operations. The plugs in this well have been drilled out and they are currently working on the 9H.
0966656635 2017-09-19 Completion Testing No Violations On the date of my inspections I found a well maintained access road with an unlocked gate. The pad has 3 drilled wells. Halliburton moving equipment onto the pad for hydraulic fracturing operations. The Halliburton foreman expects to be moved in and beginning operations by 9/23/17. The production equipment has already been installed on the pad and currently includes 3 sand traps, 3 gas production units, and three 400 barrel tanks surrounded by a metal dike. The pad is surrounded by an earthen berm covered by healthy vegetation with the exception of where the pipeline has recently tied into the pad.
1288163309 2017-07-05 Casing String Witnessed No Violations I am on site to witness the cementing of 13.375 inch surface casing. Nomac 80 drilled a 17.5 inch diameter hole to a depth of 626 feet and set 616 feet of centralized 13.375 inch 54.5 pound per foot casing. Schlumberger established circulation with fresh water, pumped 25 barrels of bentonite gel spacer followed by 10 barrels of water, then pumped 520 sacks of class A cement (1.2 yield and 15.6 pound per gallon, Surface Set). The wiper plug was released and Schlumberger displaced with 88 barrels of fresh water. By the time the plug landed approximately 21 barrels of cement had returned to surface. When the plug landed, pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 900 psi for 5 minutes.
138717930 2017-11-16 0:00 CT No Violations 0.50
1411850221 2017-07-26 Drill / Deepen / Reopen No Violations On the date of my inspection I found Patterson drilling rig 580 drilling the curve at approximately 9483 feet. Chesapeake anticipates landing the curve and beginning the lateral portion of the well this afternoon. During my inspection I found two pallets of chemicals (hydrated line and calcium carbonate) outside of containment staged near the mixing house. The containment on the eastern side of the back yard area has large portions torn off. Also, I found a large puncture in the containment around the catwalk. I spoke with the Chesapeake company man about the issues and he indicated that he would call the containment contractor out to repair the torn areas and add containment to the mixing house area. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking.
1501680698 2017-08-02 Drill / Deepen / Reopen No Violations On the date of my inspection I found Patterson drilling rig 580 tripping out of the hole after reaching their total depth of 19605 feet. Chesapeake anticipates running casing this afternoon and cementing the production string on 8/3/17. During my inspection I found multiple punctures and tears in the containment near the changing house. I spoke with the Chesapeake company man about the issues and he indicated that he would call the containment contractor out to repair the damaged areas. All chemicals are within containment. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking.
1507814106 2017-10-12 Completion Testing No Violations On the date of my inspection, I found a well maintained lease road with an unlocked gate. The pad is surrounded by a fenced earthen dike covered with healthy vegetation. All three wells on the pad have recently been hydraulically fractured. Equipment remaining on site from frac operations include a man lift, 3 residual waste containers, 13 frac tanks, a skid steer, a 3 forklifts, 2 roll off trash containers, walls components for an above ground storage tank, and the secondary containment mats. The wells are equipped with a wellhead that has chains looped through the valve handles to prevent tampering. Production equipment on the pad includes three 400 barrel tanks within a metal dike, 3 sand separators, and 3 gas production units. Currently a pipeline crew is tying the gas pipeline into the production equipment.
1573834150 2019-11-15 0:00 PL No Violations 1.00
83238759 2017-7-5 0:00:0 DD No Violations 1.50

For data sources see[10]