34-081-20668

Well Details

Well ID: 34-081-20668
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Island Creek Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001427
Farm/Lease Name: ACTON 23-7-2
License Status: Producing
License Date: 2017-04-05
Spud Date: 2017-04-15
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-08-12
Well Total Depth: 17999.00 ft
Configuration: Horizontal
Latitude: 40.440000
Longitude: -80.700000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-11-29 Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:11/29/2016, Expired Date:11/29/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-04-05 Proposed Formations:POINT PLEASANT, Issued Date:4/5/2017, Expired Date:4/5/2019 12:00:00 PM, Drilling unit acres:197.23, Proposed Well Type:OG, Proposed Well Class:FWC
Correction to Well 2017-04-14 ADDED MISSING TARGET FOOTAGE.
Reached Total Depth 2017-08-12 LOG CONFIDENTIAL REQUEST 1 YEAR
Correction to Well 2017-12-29 UPDATE TARGET/TAKE POINT/ACREAGE PER AS-DRILLED PLAT
Completion Report Received 2018-02-06 LOG CONFIDENTIAL REQUEST 1 YEAR
Construction Permit Expires 2018-04-05 LOG CONFIDENTIAL REQUEST 1 YEAR
Change of Owner 2018-12-18 Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC
Record Last Modified 2018-12-18 LOG CONFIDENTIAL REQUEST 1 YEAR

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-02-09 9627 9850 30
2018-02-09 17657 17880 30
17657 17880 30
9627 9850 30
9627 9850 30

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/25/2017 10/07/2017 9396 5,784,320.0 554833

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SP BREAKER HALLIBURTON Breaker Sodium Persulfate 007775-27-1 100 0.00063 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 1 0.00013 0
WG-36 HALLIBURTON Gelling Agent Guar Gum 009000-30-0 100 0.10657 0
7.5%HCL HYDROCHLORIC ACID HALLIBURTON Acid Water 007732-18-5 93 0.89293 0
Hydrochloric Acid 007647-01-0 8 0.0724 0
Super LC HALLIBURTON Proppant - Resin Coated Hexamethylenetetramine (Hexamine) 000100-97-0 1 0.07176 0
Phenol/Formaldehyde Resin 009003-35-4 5 0.35878 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 97 6.96025 0
FR-76 HALLIBURTON Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 30 0.01863 0
Proprietary Inorganic Salt Trade Secret 30 0.01863 0
SC-30 FOUNTAIN QUAIL Scale Inhibitor Sodium Hydroxide 1310-73-2 2 0.00013 0
15% HCl Acid HALLIBURTON Acid Hydrochloric Acid 7647-01-0 30 0.11101 0
Northern White Sand HALLIBURTON Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 8.25864 0
BC-140 X2 HALLIBURTON Cross Linker Ethylene Glycol 000107-21-1 30 0.01412 0
Monoethanolamine borate 026038-87-9 60 0.02825 0
FE-1A HALLIBURTON Iron Control Agent Acetic acid 000064-19-7 60 0.00607 0
Acetic Anhydride 000108-24-7 100 0.01012 0
BC-140 X2, FE-1A, FR-76, HAI-OS,

OPTIFLO-III DELAYED RELEASE, SP BREAKER, WG-36

HALLIBURTON Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent Non-MSDS Components Not Provided by Supplier Not Assigned 0 0 0
Polyacrylamide copolymer Trade Secret 30 0.02245 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 12.9504 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 68.0791 0
HAI-OS HALLIBURTON Corrosion Inhibitor Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00034 0
Methanol (Methyl Alcohol) 000067-56-1 60 0.00206 0
OPTIFLO-III DELAYED RELEASE HALLIBURTON Breaker Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 30 0.0005 0
Ammonium Persulfate 007727-54-0 100 0.00166 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-10-07 H2O 0 4526 Bbl 329640 Halliburton STAGE 30/30

STAGES 2-29 SEE IMAGES

2017-09-25 H2O 0 6195 Bbl 346700 Halliburton STAGE 1/30

STAGES 2-29 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC 276650 0 25
2018 CHESAPEAKE EXPLORATION LLC 1537140 0 290
2019 EAP OHIO LLC 191773 0 89

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC Brine 9481 25
2018 CHESAPEAKE EXPLORATION LLC Brine 3598 351
2019 EAP OHIO LLC Brine 269 89

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-836745437 2017-11-16 0:00 CT No Violations 0.50
0836745437 2017-11-16 Completion Testing No Violations On the date of my inspection I found a well maintained access road with an unlocked gate. The pad has 3 drilled wells, 3 vertical sand separators, 3 gas production units, and three 400 barrel tanks within a metal dike. There are not any identification tags on the production equipment. All of the production equipment is surrounded by concrete barriers. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. Currently Stone Well Service has a rig on site for drill out operations. They have 8 plugs left to drill out on this well. It is the last well on the pad.
1492267060 2017-04-15 Casing String Witnessed No Violations Upon arrival on location I found the crew ready to cement the conductor casing. 120 feet of 20-inch casing was run and cemented back to surface. The cementing was done by Express Energy. 43.34 bbl. of class A with 2% calcium and 1 /2 pound of flake per sack was pumped and displaced with 39.7 bbl. of freshwater. Established circulation and circulated 17 bbl. of good cement returns to surface.
1499384766 2017-07-06 Casing String Witnessed No Violations I am on site to witness the cementing of 13.375 inch surface casing. Nomac 80 drilled a 17.5 inch diameter hole to a depth of 626 feet and set 616 feet of centralized 13.375 inch 54.5 pound per foot casing. Schlumberger established circulation with fresh water, pumped 25 barrels of bentonite gel spacer followed by 10 barrels of water, then pumped 520 sacks of class A cement (1.2 yield and 15.6 pound per gallon, Surface Set). The wiper plug was released and Schlumberger displaced with 88 barrels of fresh water. By the time the plug landed approximately 29 barrels of cement had returned to surface. When the plug landed, pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 900 psi for 5 minutes.
1502721377 2017-08-14 Casing String Witnessed No Violations On the date of my inspection I found Patterson Drilling rig 580 displacing the cement for the production casing. Patterson drilled an 8.5 inch diameter hole to a depth of 17999 feet and set 17999 feet of 5.5 inch 20 pound per foot casing. Schlumberger broke circulation and pumped 100 barrels of cemprime scrub ahead then pumped 4165 sacks of class H cement, 1.19 yield and 15.6 pound per gallon. Approximately 30 barrels of cement returned to surface. The wiper plug landed and pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 4800 psi for 5 minutes.
1573831088 2019-11-15 0:00 PL No Violations 1.00
1899957858 2017-09-19 Completion Testing No Violations On the date of my inspections I found a well maintained access road with an unlocked gate. The pad has 3 drilled wells. Halliburton moving equipment onto the pad for hydraulic fracturing operations. The Halliburton foreman expects to be moved in and beginning operations by 9/23/17. The production equipment has already been installed on the pad and currently includes 3 sand traps, 3 gas production units, and three 400 barrel tanks surrounded by a metal dike. The pad is surrounded by an earthen berm covered by healthy vegetation with the exception of where the pipeline has recently tied into the pad.
2059773011 2017-10-12 Completion Testing No Violations On the date of my inspection, I found a well maintained lease road with an unlocked gate. The pad is surrounded by a fenced earthen dike covered with healthy vegetation. All three wells on the pad have recently been hydraulically fractured. Equipment remaining on site from frac operations include a man lift, 3 residual waste containers, 13 frac tanks, a skid steer, a 3 forklifts, 2 roll off trash containers, walls components for an above ground storage tank, and the secondary containment mats. The wells are equipped with a wellhead that has chains looped through the valve handles to prevent tampering. Production equipment on the pad includes three 400 barrel tanks within a metal dike, 3 sand separators, and 3 gas production units. Currently a pipeline crew is tying the gas pipeline into the production equipment.