34-081-20669

Well Details

Well ID: 34-081-20669
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Island Creek Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001427
Farm/Lease Name: ACTON 23-7-2
License Status: Producing
License Date: 2017-04-05
Spud Date: 2017-04-13
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-07-17
Well Total Depth: 19115.00 ft
Configuration: Horizontal
Latitude: 40.440000
Longitude: -80.700000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-11-29 Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:11/29/2016, Expired Date:11/29/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-04-05 Proposed Formations:POINT PLEASANT, Issued Date:4/5/2017, Expired Date:4/5/2019 12:00:00 PM, Drilling unit acres:204.66, Proposed Well Type:OG, Proposed Well Class:FWC
Reached Total Depth 2017-07-17 WELL LOGS RCVD 8/7/17, UPDATE STATUS TO DR FROM WP-ALE.
Correction to Well 2017-12-29 UPDATE TARGET/TAKE/ACREAGE PER AS-DRILLED PLAT
Completion Report Received 2018-02-05 WELL LOGS RCVD 8/7/17, UPDATE STATUS TO DR FROM WP-ALE.
Construction Permit Expires 2018-04-05 WELL LOGS RCVD 8/7/17, UPDATE STATUS TO DR FROM WP-ALE.
Change of Owner 2018-12-18 Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC
Record Last Modified 2018-12-18 WELL LOGS RCVD 8/7/17, UPDATE STATUS TO DR FROM WP-ALE.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-02-09 10387 10604 30
2018-02-09 18774 18991 30
18774 18991 30
10387 10604 30
10387 10604 30

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/25/2017 10/07/2017 9216 7,401,910.0 576143

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 70.8897 0
FE-1A HALLIBURTON Iron Control Agent Acetic Anhydride 000108-24-7 100 0.0075 0
Acetic acid 000064-19-7 60 0.0045 0
SC-30 FOUNTAIN QUAIL Scale Inhibitor Sodium Hydroxide 1310-73-2 2 0.00013 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 1 0.00012 0
7.5%HCL HYDROCHLORIC ACID HALLIBURTON Acid Water 007732-18-5 93 0.87142 0
Hydrochloric Acid 007647-01-0 8 0.07066 0
HAI-OS HALLIBURTON Corrosion Inhibitor Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00026 0
Methanol (Methyl Alcohol) 000067-56-1 60 0.00154 0
BC-140 X2, FE-1A, FR-76, HAI-OS,

OPTIFLO-III DELAYED RELEASE, SP BREAKER, WG-36

HALLIBURTON Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent Non-MSDS Components Not Provided by Supplier Not Assigned 0 0 0
Polyacrylamide copolymer Trade Secret 30 0.02198 0
BC-140 X2 HALLIBURTON Cross Linker Ethylene Glycol 000107-21-1 30 0.0119 0
Monoethanolamine borate 026038-87-9 60 0.02381 0
OPTIFLO-III DELAYED RELEASE HALLIBURTON Breaker Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 30 0.00046 0
Ammonium Persulfate 007727-54-0 100 0.00152 0
Northern White Sand HALLIBURTON Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 12.9417 0
WG-36 HALLIBURTON Gelling Agent Guar Gum 009000-30-0 100 0.08538 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 13.0484 0
SP BREAKER HALLIBURTON Breaker Sodium Persulfate 007775-27-1 100 0.00052 0
15% HCl Acid HALLIBURTON Acid Hydrochloric Acid 7647-01-0 30 0.08017 0
FR-76 HALLIBURTON Friction Reducer Proprietary Inorganic Salt Trade Secret 30 0.01882 0
Petroleum Distillate Hydrotreated Light 064742-47-8 30 0.01882 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-10-07 H2O 0 5131 Bbl 348776 Halliburton STAGE 32/32

STAGES 2-31 SEE IMAGES

2017-09-25 H2O 0 9588 Bbl 255843 Halliburton STAGE 1/32

STAGES 2-31 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC 216968 0 27
2018 CHESAPEAKE EXPLORATION LLC 1196977 0 290
2019 EAP OHIO LLC 194188 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC Brine 9422 27
2018 CHESAPEAKE EXPLORATION LLC Brine 8640 351
2019 EAP OHIO LLC Brine 981 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1115581637 2017-9-19 0:00: CT No Violations 0.40
-174241233 2019-11-15 0:00 PL No Violations 1.00
-1789529304 2017-11-16 0:00 CT No Violations 0.50
-376942330 2017-7-3 0:00:0 DD No Violations 1.50
-601852776 2017-10-12 0:00 CT No Violations 0.80
0376942330 2017-07-03 Drill / Deepen / Reopen No Violations On the date of my inspection I found Nomac drilling rig 80 moving onto the pad and rigging up on this permit. According to the Chesapeake company man, they intend to start drilling the surface string on 7/4. He indicated that they would be drilling all of the surface strings for the wells on this pad before going back to 1H and drilling it to completion. The pad is surrounded by a fence and berm with healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking.
0601852776 2017-10-12 Completion Testing No Violations On the date of my inspection, I found a well maintained lease road with an unlocked gate. The pad is surrounded by a fenced earthen dike covered with healthy vegetation. All three wells on the pad have recently been hydraulically fractured. Equipment remaining on site from frac operations include a man lift, 3 residual waste containers, 13 frac tanks, a skid steer, a 3 forklifts, 2 roll off trash containers, walls components for an above ground storage tank, and the secondary containment mats. The wells are equipped with a wellhead that has chains looped through the valve handles to prevent tampering. Production equipment on the pad includes three 400 barrel tanks within a metal dike, 3 sand separators, and 3 gas production units. Currently a pipeline crew is tying the gas pipeline into the production equipment.
1115581637 2017-09-19 Completion Testing No Violations On the date of my inspections I found a well maintained access road with an unlocked gate. The pad has 3 drilled wells. Halliburton moving equipment onto the pad for hydraulic fracturing operations. The Halliburton foreman expects to be moved in and beginning operations by 9/23/17. The production equipment has already been installed on the pad and currently includes 3 sand traps, 3 gas production units, and three 400 barrel tanks surrounded by a metal dike. The pad is surrounded by an earthen berm covered by healthy vegetation with the exception of where the pipeline has recently tied into the pad.
1490627894 2017-03-23 Administrative Inspection No Violations Response to complaint #5562. Theresa Hendricks called at 8:56 AM on 3/23 to follow up on a complaint she had filed at 3:35 PM on 3/22. She informed me that she was having trouble with the contractor constructing the Acton well pad. She indicated that a construction truck had run off the road into a drainage area for a spring near her driveway on Township Road 371. The damage caused by the truck caused the water to leave the channel and flow down the road and was flooding her driveway. She indicated that the altered flow was also impacting a wetland nearby. She was frustrated by the lack of response from the township and county agencies she had contacted about the issue which began in February. After speaking with Supervisor Mike Moreland about the complaint, he indicated that the issues were outside of our jurisdiction and that the matter would have to be taken up with the township. I called Ms. Hendricks at 7:44 AM on 3/24 to inform her that unfortunately I could not do anything about issues at hand, and that she would have to continue to contact the township.
1500393735 2017-07-18 Drill / Deepen / Reopen No Violations On the date of my inspection I found Patterson drilling rig 580 tripping out of the hole to run their 5.5 inch production casing. They reached their total depth for this permit number of 19115 feet. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. I found a small tear in containment near the catwalk, and multiple punctures in the containment surrounding a portable fuel tank. There was a light generator and 2 pallets of chemicals outside of containment. I notified the Chesapeake company man of the issues who indicated they would take care of them today. The pad drain valves are in the closed position and do not appear to be leaking.
1770566393 2017-07-10 Drill / Deepen / Reopen No Violations On the date of my inspection I found Patterson drilling rig 580 drilling the production string of this well. They are currently drilling ahead at approximately 6263 feet. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. I found a small area behind the chemical storage where some calcium chloride had spilled onto the berm and has killed some vegetation. I also found the area behind the cuttings neutralization and stabilization box to be covered with overflow from the box. I notified the Chesapeake company man of both of the issues who indicated they would clean it up as soon as possible. The pad drain valves are in the closed position and do not appear to be leaking.
1789529304 2017-11-16 Completion Testing No Violations On the date of my inspection I found a well maintained access road with an unlocked gate. The pad has 3 drilled wells, 3 vertical sand separators, 3 gas production units, and three 400 barrel tanks within a metal dike. There are not any identification tags on the production equipment. All of the production equipment is surrounded by concrete barriers. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. Currently Stone Well Service has a rig on site for drill out operations. The plugs in this well have been drilled out and they are currently working on the 9H.

For data sources see[10]