If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20671 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.42,"lon":-80.72,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Island Creek Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001432 | |
Farm/Lease Name: BOZICH 28-7-2 | |
License Status: Producing | |
License Date: 2017-06-14 | |
Spud Date: 2017-07-08 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2017-07-22 | |
Well Total Depth: 21954.00 ft | |
Configuration: Horizontal | |
Latitude: 40.420000 | |
Longitude: -80.720000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-12-02 | Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:12/2/2016, Expired Date:12/2/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-06-14 | Proposed Formations:POINT PLEASANT, Issued Date:6/14/2017, Expired Date:6/14/2019 12:00:00 PM, Drilling unit acres:298.59, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-07-22 | |
Correction to Well | 2017-12-29 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-01-26 | |
Construction Permit Expires | 2018-06-14 | |
Change of Owner | 2018-12-18 | Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC |
Record Last Modified | 2018-12-18 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-02-06 | 9949 | 10168 | 0 |
2018-02-06 | 21761 | 21929 | 0 |
21761 | 21929 | 0 | |
9949 | 10168 | 0 | |
9949 | 10168 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/09/2017 | 09/21/2017 | 9263 | 8,168,580.0 | 766491 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Northern White Sand | HALLIBURTON | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 16.0592 | 0 |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 71.4552 | 0 | |
Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 1 | 0.00011 | 0 | |
SC-30 | FOUNTAIN QUAIL | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 2 | 0.00012 | 0 | |
HAI-OS | HALLIBURTON | Corrosion Inhibitor | Methanol (Methyl Alcohol) | 000067-56-1 | 60 | 0.00088 | 0 | |
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00015 | 0 | ||||
SP BREAKER | HALLIBURTON | Breaker | Sodium Persulfate | 007775-27-1 | 100 | 0.00064 | 0 | |
WG-36 | HALLIBURTON | Gelling Agent | Guar Gum | 009000-30-0 | 100 | 0.08627 | 0 | |
FE-1A | HALLIBURTON | Iron Control Agent | Acetic acid | 000064-19-7 | 60 | 0.00264 | 0 | |
Acetic Anhydride | 000108-24-7 | 100 | 0.0044 | 0 | ||||
15% HCl Acid | HALLIBURTON | Acid | Muriatic Acid Hydrogen Chloride | 7647-01-0 | 30 | 0.0821 | 0 | |
FR-76 | HALLIBURTON | Friction Reducer | Proprietary Inorganic Salt | Trade Secret | 30 | 0.01306 | 0 | |
Petroleum Distillate Hydrotreated Light | 064742-47-8 | 30 | 0.01306 | 0 | ||||
OPTIFLO-III DELAYED RELEASE | HALLIBURTON | Breaker | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 30 | 0.00046 | 0 | |
Ammonium Persulfate | 007727-54-0 | 100 | 0.00153 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 10.4649 | 0 | |
BC-140 X2 | HALLIBURTON | Cross Linker | Ethylene Glycol | 000107-21-1 | 30 | 0.01425 | 0 | |
Monoethanolamine borate | 026038-87-9 | 60 | 0.0285 | 0 | ||||
7.5%HCL HYDROCHLORIC ACID | HALLIBURTON | Acid | Water | 007732-18-5 | 93 | 0.36935 | 0 | |
Hydrochloric Acid | 007647-01-0 | 8 | 0.02995 | 0 | ||||
BC-140 X2, FE-1A, FR-76, HAI-OS,
OPTIFLO-III DELAYED RELEASE, SP BREAKER, WG-36 |
HALLIBURTON | Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent | Non-MSDS Components Not Provided by Supplier | Not Assigned | 0 | 0 | 0 | |
Polyacrylamide copolymer | Trade Secret | 30 | 0.01573 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-09-21 | H2O | 15 | 3781 Bbl | 327965 | Halliburton | STAGE 46/46
STAGES 2-45 SEE IMAGES |
2017-08-09 | H2O | 15 | 4207 Bbl | 264505 | Halliburton | STAGE 1/46
STAGES 2-45 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CHESAPEAKE EXPLORATION LLC | 489319 | 0 | 49 |
2018 | CHESAPEAKE EXPLORATION LLC | 1906398 | 0 | 302 |
2019 | EAP OHIO LLC | 294318 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 23844 | 49 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 20457 | 363 |
2019 | EAP OHIO LLC | Brine | 2931 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1019827435 | 2020-7-23 0:00: | PW | No Violations | 1.00 |
-1304395423 | 2019-11-14 0:00 | PL | No Violations | 1.00 |
-1511120546 | 2017-8-10 0:00: | CT | No Violations | 1.00 |
-1580342432 | 2017-9-19 0:00: | CT | No Violations | 1.30 |
-1969027593 | 2020-1-23 0:00: | PW | No Violations | 1.00 |
-233579154 | 2020-1-13 0:00: | UP | No Violations | 1.00 |
-255631751 | 2017-8-21 0:00: | CT | No Violations | |
-871836660 | 2020-4-30 0:00: | PW | No Violations | 1.00 |
0255631751 | 2017-08-21 | Completion Testing | No Violations | On the date of my inspection I found a work over rig from Stone Well Service rigged up on permit 34-081-2-0675 attempting to re-establish the ability to pump down hole by drilling out 2 stage plugs. Halliburton is also on site with a frac crew waiting for the work over rig to perform the maintenance on the wells so they can continue with frac operations. All of the wells on the pad require some maintenance before frac operations can resume. This well has been hydraulically fractured through stage 11 of 46 stages. Ascent anticipates the frac operations to be able to resume by 8/24 or 8/25. |
0388687932 | 2017-07-18 | Drill / Deepen / Reopen | No Violations | On the date of my inspection I found Patterson drilling rig 571 drilling their production string at 15167 feet. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. I found several punctures in the containment near the catwalk, a puncture in the containment near the drilling fluid tanks. The puncture near the drilling fluid tanks is actively leaking. I notified the Chesapeake company man of the issues who indicated they would take care of them as soon as possible. The pad drain valves are in the closed position and do not appear to be leaking. |
1499697624 | 2017-07-10 | Casing String Witnessed | No Violations | I am on site to witness the cementing of 9.625 inch surface casing. Patterson 571 drilled a 12.25 inch diameter hole to a depth of 2016 feet and set 2008 feet of centralized 9.625 inch 40 pound per foot casing. Schlumberger established circulation with fresh water, pumped 25 barrels of bentonite gel spacer followed by 10 barrels of water, then pumped 736 sacks of class A cement (1.2 yield and 15.6 pound per gallon, Surface Set). The wiper plug was released and Schlumberger displaced with 149 barrels of fresh water. By the time the plug landed approximately 37 barrels of cement had returned to surface. When the plug landed, pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 1415 psi for 5 minutes. |
1501077276 | 2017-07-26 | Drill / Deepen / Reopen | No Violations | On the date of my inspection I found Patterson drilling rig 571 rigging down and moving to a pad in Harrison County. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. Chesapeake has drained all water from the containment areas in preparation for moving the rig. Water lines have already been run to the pad to be used during the hydraulic fracturing operations. The pad drain valves are in the closed position and do not appear to be leaking. Chesapeake estimates the rig move will take approximately two days. |
1510842110 | 2017-11-16 | Production Wells | No Violations | |
1511120546 | 2017-08-10 | Completion Testing | No Violations | On the date of my inspection I found a Halliburton frac crew rigged up on all 4 wells on the pad. While I was on site I witnessed Halliburton pump the frac job for stage 5 of 96 for the 6H well. This well has had 3 stages of 46 completed. All hazardous materials are within double containment which is in good condition, free of visible punctures or tears. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position. |
1576273494 | 2019-12-13 0:00 | PW | No Violations | 1.00 |
1580342432 | 2017-09-19 | Completion Testing | No Violations | On the date of my inspection I found a Halliburton crew rigged up on all 4 wells on the pad for hydraulic fracturing operations. While I was on site I witnessed Halliburton pump the frac job for stage 40 of 46 on this well and stage 46 of 52 on permit 3408120675. They are currently on stage 10 on this well. All hazardous materials are within double containment which is in good condition, free of visible punctures or tears. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position. |
1836455405 | 2020-4-8 0:00:0 | PW | No Violations | 1.00 |
388687932 | 2017-7-18 0:00: | DD | No Violations | 1.30 |
443523628 | 2019-12-27 0:00 | UP | No Violations | 1.00 |
557716142 | 2020-3-6 0:00:0 | PW | No Violations | 1.00 |
951130779 | 2020-1-29 0:00: | UP | No Violations | 1.00 |
For data sources see[10]