If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20673 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.42,"lon":-80.72,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Island Creek Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001432 | |
Farm/Lease Name: BOZICH 28-7-2 | |
License Status: Producing | |
License Date: 2017-04-11 | |
Spud Date: 2017-04-08 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2017-07-04 | |
Well Total Depth: 23970.00 ft | |
Configuration: Horizontal | |
Latitude: 40.420000 | |
Longitude: -80.720000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-12-02 | Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:12/2/2016, Expired Date:12/2/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-04-11 | Proposed Formations:POINT PLEASANT, Issued Date:4/11/2017, Expired Date:4/11/2019 12:00:00 PM, Drilling unit acres:352, Proposed Well Type:OG, Proposed Well Class:FWC |
Reached Total Depth | 2017-07-04 | |
Correction to Well | 2017-12-29 | UPDATE TARGET/TAKE POINT PER AS-DRILLED PLAT |
Completion Report Received | 2018-01-22 | |
Construction Permit Expires | 2018-04-11 | |
Change of Owner | 2018-12-18 | Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC |
Record Last Modified | 2018-12-18 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-02-05 | 9959 | 10081 | 40 |
2018-02-05 | 23753 | 23845 | 24 |
23753 | 23845 | 24 | |
9959 | 10081 | 40 | |
9959 | 10081 | 40 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/09/2017 | 09/22/2017 | 9413 | 18,990,000.0 | 1,545,190.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FE-1A | HALLIBURTON | Iron Control Agent | Acetic acid | 000064-19-7 | 60 | 0.00241 | 0 |
Acetic Anhydride | 000108-24-7 | 100 | 0.00402 | 0 | ||||
Northern White Sand | HALLIBURTON | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 15.0744 | 0 | |
HAI-OS | HALLIBURTON | Corrosion Inhibitor | Methanol (Methyl Alcohol) | 000067-56-1 | 60 | 0.00079 | 0 | |
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00013 | 0 | ||||
SP BREAKER | HALLIBURTON | Breaker | Sodium Persulfate | 007775-27-1 | 100 | 0.00059 | 0 | |
SC-30 | FOUNTAIN QUAIL | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 2 | 0.00014 | 0 | |
OPTIFLO-III DELAYED RELEASE | HALLIBURTON | Breaker | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 30 | 0.00042 | 0 | |
Ammonium Persulfate | 007727-54-0 | 100 | 0.0014 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 12.063 | 0 | |
Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 1 | 0.00012 | 0 | |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 71.0123 | 0 | |
15% HCl Acid | HALLIBURTON | Acid | Muriatic Acid Hydrogen Chloride | 7647-01-0 | 30 | 0.01183 | 0 | |
BC-140 X2 | HALLIBURTON | Cross Linker | Ethylene Glycol | 000107-21-1 | 30 | 0.0131 | 0 | |
Monoethanolamine borate | 026038-87-9 | 60 | 0.0262 | 0 | ||||
FR-76 | HALLIBURTON | Friction Reducer | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 30 | 0.01314 | 0 | |
Proprietary Inorganic Salt | Trade Secret | 30 | 0.01314 | 0 | ||||
7.5%HCL HYDROCHLORIC ACID | HALLIBURTON | Acid | Hydrochloric Acid | 007647-01-0 | 8 | 0.04989 | 0 | |
Water | 007732-18-5 | 93 | 0.61525 | 0 | ||||
WG-36 | HALLIBURTON | Gelling Agent | Guar Gum | 009000-30-0 | 100 | 0.08108 | 0 | |
BC-140 X2, FE-1A, FR-76, HAI-OS,
OPTIFLO-III DELAYED RELEASE, SP BREAKER, WG-36 |
HALLIBURTON | Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent | Non-MSDS Components Not Provided by Supplier | Not Assigned | 0 | 0 | 0 | |
Polyacrylamide copolymer | Trade Secret | 30 | 0.01563 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-08-09 | H2O | 15 | 3844 Bbl | 266473 | Halliburton | STAGE 1/96
STAGES 2-95 SEE IMAGES |
2017-09-22 | H2O | 15 | 3751 Bbl | 254132 | Halliburton | STAGE 96/96
STAGES 2-95 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CHESAPEAKE EXPLORATION LLC | 810412 | 0 | 48 |
2018 | CHESAPEAKE EXPLORATION LLC | 4298076 | 0 | 301 |
2019 | EAP OHIO LLC | 551240 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 25368 | 48 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 26544 | 362 |
2019 | EAP OHIO LLC | Brine | 1601 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1017382589 | 2017-6-29 0:00: | DD | No Violations | 2.00 |
-1211512731 | 2019-12-13 0:00 | PW | No Violations | 1.00 |
-1211959154 | 2017-9-19 0:00: | CT | No Violations | 1.30 |
-1383762541 | 2020-4-30 0:00: | PW | No Violations | 1.00 |
-1967532708 | 2017-11-16 0:00 | PW | No Violations | 0.60 |
-206885553 | 2017-8-21 0:00: | CT | No Violations | 0.40 |
-583443058 | 2020-1-23 0:00: | PW | No Violations | 1.00 |
-934637187 | 2019-11-14 0:00 | PL | No Violations | 1.00 |
-985543120 | 2020-7-23 0:00: | PW | No Violations | 1.00 |
0206885553 | 2017-08-21 | Completion Testing | No Violations | On the date of my inspection I found a work over rig from Stone Well Service rigged up on permit 34-081-2-0675 attempting to re-establish the ability to pump down hole by drilling out 2 stage plugs. Halliburton is also on site with a frac crew waiting for the work over rig to perform the maintenance on the wells so they can continue with frac operations. All of the wells on the pad require some maintenance before frac operations can resume. This well has been hydraulically fractured through stage 22 of 96 stages. Chesapeake anticipates the frac operations to be able to resume by 8/24 or 8/25. |
0508973447 | 2017-08-10 | Completion Testing | No Violations | On the date of my inspection I found a Halliburton frac crew rigged up on all 4 wells on the pad. While I was on site I witnessed Halliburton pump the frac job for stage 5 of 96 for this well. All hazardous materials are within double containment which is in good condition, free of visible punctures or tears. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position. |
1017382589 | 2017-06-29 | Drill / Deepen / Reopen | No Violations | |
1211959154 | 2017-09-19 | Completion Testing | No Violations | On the date of my inspection I found a Halliburton crew rigged up on all 4 wells on the pad for hydraulic fracturing operations. While I was on site I witnessed Halliburton pump the frac job for stage 46 of 52 on permit 3408120675 and stage 40 of 46 on permit 3408120671. They are currently on stage 87 of 96 on this well. All hazardous materials are within double containment which is in good condition, free of visible punctures or tears. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position. |
1300134071 | 2019-12-27 0:00 | UP | No Violations | 1.00 |
1498134051 | 2017-06-22 | Casing String Witnessed | No Violations | I am on site to witness the cementing of 13.375 inch surface casing. Nomac 71 drilled a 17.5 inch diameter hole to a depth of 588 feet and set 578 feet of 13.375 inch 54.5 pound per foot casing. Schlumberger established circulation with fresh water, pumped 505 sacks of class A cement, 1.2 yield and 15.6 pound per gallon surface set cement. Approximately 20 barrels of cement returned to surface. The wiper plug landed and pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 812 psi for 5 minutes. |
1536801721 | 2017-04-08 | Casing String Witnessed | No Violations | I am on site today to witness the cementing of 20 inch conductor casing. Express Energy Services drilled a 24 inch diameter hole to a depth of 120 feet and ran 120 feet of 20 inch diameter 94 pound per foot conductor casing. Express 8 barrel of water ahead to verify circulation then pumped 230 sacks of class A cement, 1.18 yield, 15.6 pounds per gallon with 2 percent Calcium Chloride and 0.5 pound per sack flow seal. I witnessed good cement returns to surface. |
1753684573 | 2020-1-13 0:00: | UP | No Violations | 1.00 |
1967532708 | 2017-11-16 | Production Wells | No Violations | |
508973447 | 2017-8-10 0:00: | CT | No Violations | 1.00 |
665202305 | 2020-3-6 0:00:0 | PW | No Violations | 1.00 |
For data sources see[10]