If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20675 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.42,"lon":-80.72,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Island Creek Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001432 | |
Farm/Lease Name: BOZICH 28-7-2 | |
License Status: Producing | |
License Date: 2017-02-15 | |
Spud Date: 2017-04-09 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2017-05-29 | |
Well Total Depth: 23952.00 ft | |
Configuration: Horizontal | |
Latitude: 40.420000 | |
Longitude: -80.720000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-12-02 | Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:12/2/2016, Expired Date:12/2/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-02-15 | Proposed Formations:POINT PLEASANT, Issued Date:2/15/2017, Expired Date:2/15/2019 12:00:00 PM, Drilling unit acres:322.07, Proposed Well Type:OG, Proposed Well Class:FWC |
Reached Total Depth | 2017-05-29 | |
Correction to Well | 2017-07-21 | UPDATE ACREAGE/TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 6-30-17 ALE |
Correction to Well | 2017-12-29 | UPDATE TAKE POINT PER AS-DRILLED PLAT |
Completion Report Received | 2018-01-26 | |
Construction Permit Expires | 2018-02-15 | |
Change of Owner | 2018-12-18 | Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC |
Record Last Modified | 2018-12-18 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-02-06 | 10542 | 10761 | 40 |
2018-02-06 | 23515 | 23713 | 24 |
23515 | 23713 | 24 | |
10542 | 10761 | 40 | |
10542 | 10761 | 40 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/09/2017 | 09/21/2017 | 9286 | 11,047,200.0 | 935165 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HAI-OS | HALLIBURTON | Corrosion Inhibitor | Methanol (Methyl Alcohol) | 000067-56-1 | 60 | 0.00183 | 0 |
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00031 | 0 | ||||
Northern White Sand | HALLIBURTON | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 13.1955 | 0 | |
Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 1 | 0.00011 | 0 | |
SC-30 | FOUNTAIN QUAIL | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 2 | 0.00012 | 0 | |
OPTIFLO-III DELAYED RELEASE | HALLIBURTON | Breaker | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 30 | 0.00038 | 0 | |
Ammonium Persulfate | 007727-54-0 | 100 | 0.00126 | 0 | ||||
7.5%HCL HYDROCHLORIC ACID | HALLIBURTON | Acid | Water | 007732-18-5 | 93 | 0.20587 | 0 | |
Hydrochloric Acid | 007647-01-0 | 8 | 0.01669 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 70.6105 | 0 | |
BC-140 X2, FE-1A, FR-76, HAI-OS,
OPTIFLO-III DELAYED RELEASE, SP BREAKER, WG-36 |
HALLIBURTON | Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent | Non-MSDS Components Not Provided by Supplier | Not Assigned | 0 | 0 | 0 | |
Polyacrylamide copolymer | Trade Secret | 30 | 0.0178 | 0 | ||||
WG-36 | HALLIBURTON | Gelling Agent | Guar Gum | 009000-30-0 | 100 | 0.07894 | 0 | |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 12.9258 | 0 | |
BC-140 X2 | HALLIBURTON | Cross Linker | Ethylene Glycol | 000107-21-1 | 30 | 0.01407 | 0 | |
Monoethanolamine borate | 026038-87-9 | 60 | 0.02814 | 0 | ||||
SP BREAKER | HALLIBURTON | Breaker | Sodium Persulfate | 007775-27-1 | 100 | 0.0006 | 0 | |
FE-1A | HALLIBURTON | Iron Control Agent | Acetic Anhydride | 000108-24-7 | 100 | 0.00859 | 0 | |
Acetic acid | 000064-19-7 | 60 | 0.00516 | 0 | ||||
15% HCl Acid | HALLIBURTON | Acid | Muriatic Acid Hydrogen Chloride | 7647-01-0 | 30 | 0.24487 | 0 | |
FR-76 | HALLIBURTON | Friction Reducer | Proprietary Inorganic Salt | Trade Secret | 30 | 0.01523 | 0 | |
Petroleum Distillate Hydrotreated Light | 064742-47-8 | 30 | 0.01523 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-09-21 | H2O | 15 | 4273 Bbl | 334433 | Halliburton | STAGE 50/50
STAGES 2-49 SEE IMAGES |
2017-08-09 | H2O | 15 | 3888 Bbl | 264129 | Halliburton | STAGE 1/50
STAGES 2-49 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CHESAPEAKE EXPLORATION LLC | 375505 | 0 | 46 |
2018 | CHESAPEAKE EXPLORATION LLC | 1803023 | 0 | 302 |
2019 | EAP OHIO LLC | 267432 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 10326 | 46 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 16987 | 363 |
2019 | EAP OHIO LLC | Brine | 2123 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1467223836 | 2017-8-21 0:00: | CT | No Violations | 0.40 |
-1827664355 | 2020-4-30 0:00: | PW | No Violations | 1.00 |
-188158144 | 2020-1-29 0:00: | UP | No Violations | 1.00 |
-1970212686 | 2020-7-23 0:00: | PW | No Violations | 1.00 |
-480564947 | 2017-11-16 0:00 | PW | No Violations | 0.60 |
-663400176 | 2017-5-30 0:00: | DD | No Violations | 1.00 |
0480564947 | 2017-11-16 | Production Wells | No Violations | |
0663400176 | 2017-05-30 | Drill / Deepen / Reopen | No Violations | I am onsite to perform a general site inspection. Nomac drilling rig 71 is currently tripping out of the hole to run the production casing to their total depth of 23952. The pad is in good condition and the vegetation on the berms appears healthy. The pad drain valves are closed and do not appear to have any leakage issues. The containment areas around the catwalk and chemical storage have multiple tears and punctures. The Chesapeake company man was notified and indicated that he would have the repair crew come out this afternoon to fix the issues. All hazardous materials are within containment areas. |
1289410033 | 2017-08-10 | Completion Testing | No Violations | On the date of my inspection I found a Halliburton frac crew rigged up on all 4 wells on the pad. While I was on site I witnessed Halliburton pump the frac job for stage 5 of 96 for the 6H well. This well has had 2 stages of 52 completed. All hazardous materials are within double containment which is in good condition, free of visible punctures or tears. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position. |
1444234487 | 2017-09-19 | Completion Testing | No Violations | On the date of my inspection I found a Halliburton crew rigged up on all 4 wells on the pad for hydraulic fracturing operations. While I was on site I witnessed Halliburton pump the frac job for stage 46 of 52 on this well and stage 40 of 46 on permit 3408120671. All hazardous materials are within double containment which is in good condition, free of visible punctures or tears. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position. |
1467223836 | 2017-08-21 | Completion Testing | No Violations | On the date of my inspection I found a work over rig from Stone Well Service rigged up on this well, attempting to re-establish the ability to pump down hole by drilling out 2 stage plugs. Halliburton is also on site with a frac crew waiting for the work over rig to perform the maintenance on the wells so they can continue with frac operations. All of the wells on the pad require some maintenance before frac operations can resume. This well has been hydraulically fractured through stage 8 of 52 stages. Chesapeake anticipates the frac operations to be able to resume by 8/24 or 8/25. |
1491754541 | 2017-04-09 | Production Wells | No Violations | I am on site today to witness the cementing of 20 inch conductor casing. Express Energy Services drilled a 24 inch diameter hole to a depth of 120 feet and ran 120 feet of 20 inch diameter 94 pound per foot conductor casing. Express 5 barrel of water ahead to verify circulation then pumped 230 sacks of class A cement, 1.18 yield, 15.6 pounds per gallon with 2 percent Calcium Chloride and 0.5 pound per sack flow seal. I witnessed good cement returns to surface. |
1494741899 | 2017-05-14 | Production Wells | No Violations | I am on site to witness the cementing of 13.375 inch surface casing. Nomac 71 drilled a 17.5 inch diameter hole to a depth of 563 feet and set 553 feet of 13.375 inch 54.5 pound per foot casing. Schlumberger established circulation with fresh water, pumped 510 sacks of class A cement, 1.19 yield and 15.6 pound per gallon surface set cement. Approximately 25 barrels of cement returned to surface. The wiper plug landed and pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 875 psi for 5 minutes. |
1494940398 | 2017-05-16 | Drill / Deepen / Reopen | No Violations | I am onsite to perform a general site inspection. Nomac drilling rig 71 is currently tripping in the hole to begin drilling the production string. The pad is in good condition and the vegetation on the berms appears healthy. The pad drain valves are closed and do not appear to have any leakage issues. The containment area around the catwalk has some tears and punctures. The Chesapeake company man was notified and indicated that he would have the repair crew come out this afternoon to fix the issues. All hazardous materials are within containment areas. |
1495633642 | 2017-05-23 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Nomac 71 rig drilling at 9018 feet. Kickoff plug was at 8725 feet and they are in the top of their curve. Containment and pad drains are functioning properly. Drains are closed and both containment and drains have very small amount of water accumulating in them. No violations were noted during this inspection. |
1579876448 | 2020-1-23 0:00: | PW | No Violations | 1.00 |
2059673790 | 2020-4-8 0:00:0 | PW | No Violations | 1.00 |
2094261262 | 2019-11-14 0:00 | PL | No Violations | 1.00 |
2119382433 | 2019-12-27 0:00 | UP | No Violations | 1.00 |
468631639 | 2020-1-13 0:00: | UP | No Violations | 1.00 |
689332511 | 2019-12-13 0:00 | PW | No Violations | 1.00 |
820194588 | 2020-4-8 0:00:0 | PW | No Violations | 1.00 |
97636571 | 2020-3-6 0:00:0 | PW | No Violations | 1.00 |
For data sources see[10]