34-081-20684

Well Details

Well ID: 34-081-20684
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Island Creek Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001452
Farm/Lease Name: SCHIAPPA TRUST A 27-7-2
License Status: Producing
License Date: 2017-04-11
Spud Date: 2017-04-14
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2017-06-14
Well Total Depth: 19575.00 ft
Configuration: Horizontal
Latitude: 40.410000
Longitude: -80.720000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-12-16 Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:12/16/2016, Expired Date:12/16/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-04-11 Proposed Formations:POINT PLEASANT, Issued Date:4/11/2017, Expired Date:4/11/2019 12:00:00 PM, Drilling unit acres:230.16, Proposed Well Type:OG, Proposed Well Class:FWC
Reached Total Depth 2017-06-14
Correction to Well 2017-09-15 UPDATE TARGET/TAKE/ACREAGE PER AS-DRILLED PLAT
Completion Report Received 2018-01-18
Construction Permit Expires 2018-04-11
Change of Owner 2018-12-18 Operator changed from 8756, CHESAPEAKE EXPLORATION LLC to 10240, EAP OHIO LLC
Record Last Modified 2018-12-18

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-02-05 9727 9849 30
2018-02-05 19111 19203 24
19111 19203 24
9727 9849 30
9727 9849 30

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/08/2017 08/04/2017 9361 10,658,100.0 1,029,870.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1
BC-140 X2, FE-1A, FR-76, HAI-OS,

OPTIFLO-III DELAYED RELEASE, SP BREAKER, WG-36

HALLIBURTON Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent Polyacrylamide copolymer Trade Secret 30 0.01451 0
Non-MSDS Components Not Provided by Supplier Not Assigned 0 0 0
BC-140 X2 HALLIBURTON Cross Linker Ethylene Glycol 000107-21-1 30 0.01547 0
Monoethanolamine borate 026038-87-9 60 0.03095 0
FR-76 HALLIBURTON Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 30 0.01181 0
Proprietary Inorganic Salt Trade Secret 30 0.01181 0
SC-30 FOUNTAIN QUAIL Scale Inhibitor Sodium Hydroxide 1310-73-2 2 0.00013 0
Northern White Sand HALLIBURTON Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 17.7031 0
FE-1A HALLIBURTON Iron Control Agent Acetic acid 000064-19-7 60 0.00235 0
Acetic Anhydride 000108-24-7 100 0.00392 0
WG-36 HALLIBURTON Gelling Agent Guar Gum 009000-30-0 100 0.09449 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 7.51078 0
15% HCl Acid HALLIBURTON Acid Muriatic Acid Hydrogen Chloride 7647-01-0 30 0.00511 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 72.9183 0
7.5%HCL HYDROCHLORIC ACID HALLIBURTON Acid Hydrochloric Acid 007647-01-0 8 0.05178 0
Water 007732-18-5 93 0.63862 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 1 0.00011 0
OPTIFLO-III DELAYED RELEASE HALLIBURTON Breaker Ammonium Persulfate 007727-54-0 100 0.00144 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 30 0.00043 0
SP BREAKER HALLIBURTON Breaker Sodium Persulfate 007775-27-1 100 0.00114 0
HAI-OS HALLIBURTON Corrosion Inhibitor Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00013 0
Methanol (Methyl Alcohol) 000067-56-1 60 0.00078 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-08-04 H2O 15 3473 Bbl 299076 Halliburton STAGE 63/63

STAGES 2-62 SEE IMAGES

2017-07-08 H2O 15 3669 Bbl 264367 Halliburton STAGE 1/63

STAGES 2-62 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC 1266902 0 80
2018 CHESAPEAKE EXPLORATION LLC 1603949 0 293
2019 EAP OHIO LLC 267531 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC Brine 26552 80
2018 CHESAPEAKE EXPLORATION LLC Brine 16515 354
2019 EAP OHIO LLC Brine 2555 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1018755448 2017-11-15 0:00 PW No Violations 0.60
-1384556225 2017-9-19 0:00: CT No Violations 0.70
-1603637973 2017-6-7 0:00:0 DD No Violations 0.50
0943478770 2018-06-04 Preliminary Restoration No Violations On the day of my inspection I found this pad to contain 3 properly labeled producing wells. The wells are equipped with christmas tree style wellheads. Each well has the 9.625 inch diameter intermediate casing annulus plumbed into a collection line. Surface annular pressure is 5 psi, intermediate pressure is 260 psi, tubing is 874 psi, flowline is 848 psi, and production is 1120 psi. Production equipment includes three GPUs, three sand seperators, and three 400 barrel steel produced water tanks. Tanks are in steel containment. Site is stable and vegetated. Site meets preliminary restoration requirements of ORC 1509.072A.
1018755448 2017-11-15 Production Wells No Violations
1122054437 2017-04-14 Casing String Witnessed No Violations Upon arrival on location I found the crew ready to cement the conductor casing. 120 feet of 20-inch casing was run and cemented back to surface. The cementing was done by Express Energy. 43.34 bbl. of class A with 2% calcium and 1 /2 pound of flake per sack was pumped and displaced with 39.7 bbl. of freshwater. The cement returns came within 17 feet of ground level. The valve was shut, will let it set up and then grout 17 feet to surface.
1282111690 2017-07-18 Completion Testing No Violations On the date of my inspection I found Halliburton hydraulically fracturing all three wells on this pad. They are currently on stage 25 for this permit number. The pad is surrounded by healthy vegetation and the drain valves are in the closed position and do not appear to be leaking. During my inspection I found that the light generators on site are not within containment. I also found a tote of wireline grease and diesel exhaust fluid outside of containment, as well as a tote of diesel exhaust fluid with no label on it. I spoke with the Chesapeake company man about the lack of containment and he indicated that they would not be changing their operations. He did indicate that a label would be added to the exhaust additive tote immediately.
1295408659 2017-08-21 Completion Testing No Violations
1384556225 2017-09-19 Completion Testing No Violations On the date of my inspections I found a well maintained access road with an unlocked gate. The pad has 3 wells that have been stimulated and are equipped with a christmas tree valve. They are not currently plumbed into the production equipment. Advanced Oilfield Services is on site currently installing the production equipment that includes three 400 barrel tanks within a metal dike, 6 gas production units, 6 glychol dehydration units, and 6 sand traps (2 spherical, 4 vertical). The pad is surrounded by an earthen dike covered with healthy vegetation with the exception of where the pipeline has recently tied into the pad. Pressure gauges on the surface and intermediate casing in pounds per square inch read at 0 and 400 respectively. Other than the equipment associated with the construction operations, 2 frac tanks and the above ground storage tank are still on location from frac operations.
1492190825 2017-04-14 Casing String Witnessed No Violations Upon arrival on location I found the crew ready to cement the conductor casing. 120 feet of 20-inch casing was run and cemented back to surface. The cementing was done by Express Energy. 43.34 bbl. of class A with 2% calcium and 1 /2 pound of flake per sack was pumped and displaced with 39.7 bbl. of freshwater. Established circulation and circulated 15 bbl. of good cement returns to surface.
1495544739 2017-05-23 Casing String Witnessed No Violations On the day of my inspection I witnessed the 13.625 inch diameter surface casing cement job. Nomac 80 drilled a 17.5 inch diameter open hole to 583 feet and Wyoming casing set 573 feet of 13.625 inch diameter, 54 pounds per foot casing. Schlumberger was onsite to cement the casing back to surface with 526 sacks/112.4 barrels of class A surfaceset cement. Shoe track was 44 feet long and open hole excess of 50%. Mix water tested a pH of 7, 59 degrees F, and 31 ppm. 22 barrels of cement returned to surface and floats held with 0.5 barrel back.
1496151467 2017-05-30 Drill / Deepen / Reopen No Violations I am onsite to perform a general site inspection. Nomac drilling rig 80 is currently tripping out of the hole to repair a motor on their bottom hole assembly. They drilled to a depth of approximately 13440 feet. The pad is in good condition and the vegetation on the berms appears healthy. The pad drain valves are closed and do not appear to have any leakage issues. The containment areas around a portable fuel tank, the catwalk, and bottom of the doghouse have multiple tears and punctures. The Chesapeake company man was notified and indicated that he would have the repair crew come out this afternoon to fix the issues. All hazardous materials are within containment areas.
1601498921 2017-06-13 Drill / Deepen / Reopen No Violations I am onsite to perform a general site inspection. Nomac drilling rig 80 is currently drilling the production string at approximately 17400 feet and expect to reach their total depth on 6/14. The pad is in good condition and the vegetation on the berms appears healthy. The pad drain valves are closed and do not appear to have any leakage issues. I found tears in the containment around the catwalk, chemical storage, and mixing house. I notified the Chesapeake company man of my findings and he indicate that the containment crew will come out this evening to fix the issues. All hazardous materials are within containment areas.
1603637973 2017-06-07 Drill / Deepen / Reopen No Violations Jackie with Chesapeake called to notify me that they could not successfully sidetrack the well after failing to fish out lost tools. Chesapeake intends to set a whipstop in order to assist in sidetracking the well. I advised them to get the tool as close to the fish as possible within the Utica if possible. Once a plan is finalized they will notify me via email, which will be stored with the files for this permit number.
2000462676 2019-04-17 Preliminary Restoration No Violations On the day of my inspection I found pad to contain three producing wells. Production equipment includes three GPUs, three sand seperators, and three 400 barrel steel tanks in their own containment. Wells are producing on natural reservoir pressure and operated by a motor valve. 13.375 x 9.625 annular pressure is zero and 9.625 x 5.5 annular pressure is 400 psi. The 9.625 x 5.5 annular is plumbed into a flow line with a motor valve. Pad is stable and vegetated and meets requirements of 1509.072 (A) for preliminary restoration.
943478770 2018-6-4 0:00:0 PL No Violations 1.00

For data sources see[10]