If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20710 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.23,"lon":-80.77,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Smithfield Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001490 | |
Farm/Lease Name: FERGUSON NE SMF JF | |
License Status: Producing | |
License Date: 2017-08-04 | |
Spud Date: 2017-05-22 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2017-09-28 | |
Well Total Depth: 19147.00 ft | |
Configuration: Horizontal | |
Latitude: 40.230000 | |
Longitude: -80.770000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-02-17 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/17/2017, Expired Date:2/17/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-08-04 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:8/4/2017, Expired Date:8/4/2019 12:00:00 PM, Drilling unit acres:527.716, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-09-28 | |
Correction to Well | 2017-12-22 | UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT |
Completion Report Received | 2019-01-10 | |
Record Last Modified | 2019-01-16 | |
Construction Permit Expires | 2019-08-04 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2019-01-15 | 9813 | 9953 | 0 |
2019-01-15 | 19137 | 19244 | 0 |
19137 | 19244 | 0 | |
9813 | 9953 | 0 | |
9813 | 9953 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/23/2017 | 11/23/2017 | 9633 | 14,424,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SCALECHEK LP-50 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 1.22689 | 1,729,020.0 | |
FR-76 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
SP BREAKER | Halliburton | Breaker | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 85.2596 | 120,154,000.0 | |
WG-36 GELLING AGENT | Halliburton | Gelling Agent | Listed Below | Listed Below | 0 | 0 | 0 | |
Phosphate of a Diamine, Sodium Salt | Proprietary | 30 | 0.0134358 | 18935 | ||||
Acetic acid | 64-19-7 | 60 | 0.00313229 | 4415 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00008791 | 124 | ||||
Sodium persulfate | 7775-27-1 | 100 | 0.00004683 | 66 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000005 | 1 | ||||
Hydrochloric acid | 7647-01-0 | 7.5 | 0.0857083 | 120786 | ||||
Ethanol | 64-17-5 | 1 | 0.000224812 | 317 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00674435 | 9505 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00522048 | 7358 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 13.4585 | 18,966,600.0 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000263744 | 372 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.000263744 | 372 | ||||
Guar gum | 9000-30-0 | 100 | 0.00143408 | 2021 | ||||
Methanol | 67-56-1 | 60 | 0.0139947 | 19724 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0.00002248 | 32 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0192895 | 27185 | ||||
Inorganic salt | Proprietary | 30 | 0.0192895 | 27185 | ||||
Acrylamide acrylate copolymer | Proprietary | 30 | 0.0192895 | 27185 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000263744 | 372 | ||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.00112406 | 1585 | ||||
Olefins | Proprietary | 5 | 0.000105497 | 150 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-10-29 | H2O | 15 | 285570 Gal | 348548 | Halliburton | STAGE 1/54
STAGES 2-53 SEE IMAGES |
2017-11-18 | H2O | 15 | 315842 Gal | 452522 | Halliburton | STAGE 54/54
STAGES 2-53 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | 4929714 | 0 | 229 |
2019 | ASCENT RESOURCES UTICA LLC | 933454 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | Brine | 27443 | 229 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 8339 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1797886932 | 2017-10-31 0:00 | CT | No Violations | 2.40 |
-1996548211 | 2018-3-14 0:00: | PL | No Violations | 1.00 |
-2056807585 | 2017-5-24 0:00: | CS | No Violations | 4.00 |
-470148916 | 2017-9-14 0:00: | DD | No Violations | 1.80 |
0470148916 | 2017-09-14 | Drill / Deepen / Reopen | No Violations | On the date of my inspection I found Patterson rig 292 drilling the intermediate section of this well at approximately 4430 feet. During my inspection I did not find any visual tears or punctures in the containment. All of the chemicals were within containment. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. I did let the company man know that the containment around the chemicals was almost full to the point of overflowing. He indicated that he would have it drained. The pad drain valves are in the closed position and do not appear to be leaking. |
0853973169 | 2017-11-20 | Completion Testing | No Violations | On the date of my inspection I found a Halliburton Frac crew rigging down after successfully completing 54 frac stages on this well. They estimate that drill out operations should begin on the pad within 2 weeks. |
0959940192 | 2017-08-22 | Drill / Deepen / Reopen | No Violations | On the date of my inspection I found Patterson drilling rig 292 moving onto the location. Currently only the living quarters, frac tanks, and drill pipe have been staged on the pad. The pad is surrounded by healthy vegetation and the pad drains are in the closed position. The rig will be rigging up on permit 34-081-2-0711 first. The surface casing for this permit has already been set. |
1498051581 | 2017-06-21 | Drill / Deepen / Reopen | No Violations | I am on site today to verify that cement was brought to surface during the 13.375 inch cement job last night. I was not notified early enough to make it out for the job. I told the Ascent Company man that this is an issue and should not happen again. When I looked down the conductor annulus, I could see that the cement had not fallen back and was still at the same level as the valves into the cellar. The rig will be moving to another pad in a few days. |
1797886932 | 2017-10-31 | Completion Testing | No Violations | On the date of my inspection I found a Halliburton crew rigged up on both wells on the pad for hydraulic fracturing operations. While I was on site I witnessed Halliburton pump the frac job for stage 7 of 60 for permit 34-081-2-0711 and perforate stage 7 of 54 for this well. All hazardous materials are within double containment which is in good condition, free of visible punctures or tears. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position. |
1996548211 | 2018-03-14 | Preliminary Restoration | No Violations | On the day of my inspection I found pad to contain 3 wells that arent yet labeled. Two wells, this one and permit 20711, have been drilled to total depth while the third well, 20709, appears to only have the conductor set. No pressures are shown any of the gauges on wellhead. Production equipment includes two line heaters, four sand seperators, two gas production units, and two 500 barrel steel tanks. Wells are not in production. There are also 2 empty frac tanks location. There is pipeline activity in the vicinity of the pad. Pad is vegetated and stable. Site meets requirements of ORC 1509.072A for preliminary restoration. |
2056807585 | 2017-05-24 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the conductor casing cement job. Precision Rathole augered a 36 inch diameter x 100 feet hole and ran 100 feet of 30 inch diameter casing. Casing weighs 118 pounds per foot. O-tex was onsite to cement with 330 sacks (70.5 barrels) of class A., 15.6 lbs per gallon. Additives included 1.5% CaCl and .25 lb per sack celloflake. Yield is 1.2. Displaced with 70 barrels of fresh water. 35 barrels of cement returned to surface. Mix water tested a pH of 7, cholorides at 38 ppm, and temp of 57 degress F. |
853973169 | 2017-11-20 0:00 | CT | No Violations | 0.30 |
959940192 | 2017-8-22 0:00: | DD | No Violations | 0.40 |
For data sources see[10]