X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-081-20718

Well Details

Well ID: 34-081-20718
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001489
Farm/Lease Name: GIUSTO E CRC JF
License Status: Producing
License Date: 2017-08-18
Spud Date: 2017-10-16
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2017-10-31
Well Total Depth: 18046.00 ft
Configuration: Horizontal
Latitude: 40.340000
Longitude: -80.670000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-03-30 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/30/2017, Expired Date:3/30/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-08-18 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:8/18/2017, Expired Date:8/18/2019 12:00:00 PM, Drilling unit acres:551.415, Proposed Well Type:OG, Proposed Well Class:NWC
Reached Total Depth 2017-10-31
Correction to Well 2017-12-29 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Construction Permit Expires 2018-08-18
Completion Report Received 2018-09-12
Record Last Modified 2018-09-12

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-09-12 10037 10178 0
2018-09-12 17777 17882 0
17777 17882 0
10037 10178 0
10037 10178 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/19/2018 04/09/2018 9808 12,836,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Operator Base Fluid Water 7732-18-5 100 87.8469 106,930,000.0
GEL 1100 Mountain Supply and Service LLC Gelling Agent Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
FR-76 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
Hydrochloric acid 7647-01-0 7.5 0.0167495 20387
Ethoxylated alcohols Proprietary 30 0.000242895 296
Citric acid 77-92-9 60 0.0033861 4122
Glutaraldehyde 111-30-8 30 0.00658471 8016
Neutralized Polyacrylic Emulsion Proprietary 10 0.00235602 2868
Methanol 67-56-1 60 0.000516518 630
Ethylene Glycol 107-21-1 60 0.0141361 17207
Crystalline silica, quartz 14808-60-7 100 11.8192 14,386,700.0
Acrylamide acrylate copolymer Proprietary 30 0.0175101 21314
Inorganic salt Proprietary 30 0.0175101 21314
Emulsifier 9002-92-0 10 0.00003038 37
Fatty acids, tall oil Proprietary 30 0.000242895 296
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.00109745 1336
Ethanol 64-17-5 1 0.00021949 268
Hydrotreated light petroleum distillate 64742-47-8 30 0.0175101 21314
Modified thiourea polymer Proprietary 30 0.000242895 296
Polymer Not assigned 68 0.000206586 252
Propargyl alcohol 107-19-7 10 0.00008096 99
Olefins Proprietary 5 0.00009716 120
PH Buffer 8055-55-8 15 0.00004557 56
Phosphoric acid 7664-38-2 0.1 0.00002195 27
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.294076 357961
LP-70 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-04-07 H2O 8 274341 Gal 287585 Halliburton STAGE 45/45

STAGES 2-44 SEE IMAGES

2018-02-19 H2O 15 299589 Gal 352793 Halliburton STAGE 1/45

STAGES 2-44 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 3309903 0 180
2019 ASCENT RESOURCES UTICA LLC 738127 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 20275 180
2019 ASCENT RESOURCES UTICA LLC Brine 3272 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-140866257 2019-7-22 0:00: UL No Violations 1.00
-239545496 2017-6-26 0:00: DD No Violations 1.00
-241778376 2017-12-13 0:00 CT No Violations 0.50
-345027929 2018-2-23 0:00: PL No Violations 1.00
-855274158 2020-1-15 0:00: PW No Violations 1.00
0239545496 2017-06-26 Drill / Deepen / Reopen No Violations I am on site today to verify that cement had been brought to surface on the conductor cement job on 6/22/17. I witnessed good cement in the floor of the cellar to a depth of 6.75 feet, leaving a cement barrier between the cellar and the soil below approximately 14 inches thick. Falcon 26 is currently moving onto the location to drill the surface portion of the wells on this pad.
0241778376 2017-12-13 Completion Testing No Violations On the date of my inspection I found a well maintained access road with a locked gate. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. There are 4 recently drilled wells on the pad surrounded by metal fences. The wells have not been hydraulically fractured yet. Production equipment on the pad includes, 4 sand separators, 4 gas production units, and two 500 barrel tanks within a metal dike. The production equipment is surrounded by concrete barriers. There is a garbage roll off container being stored on the pad near the lease road entrance.
0345027929 2018-02-23 Preliminary Restoration No Violations On the day of my inspection I witnessed Halliburton was onsite under direction of Ascent Company man Delbert. This pad is splitting water with the Stone pad, and the other pad is currently receiving water for frac. 2h and 4h are being fraced currently. Received call from Mr. Niece (ODOT aviation) on 2/21 in regards to crane not having a permit from ODOT. Pad is within 10000 feet of jefferson airpark and ODOT has permits for erections that close to airport. A permanent solar powered light was installed on crane. Outslope of pad is vegetated and stable. Lease road is stable. Site meets requirements of ORC 1509.072A for preliminary restoration.
1509370659 2017-10-30 Drill / Deepen / Reopen No Violations On the date of my inspection I found Pioneer rig 77 preparing to move the rig. They completed the cement job on their production string early this morning. Currently they are cleaning the mud pits out while waiting for cement to set before removing the slips. Ascent estimates they will have the rig moved off the pad by 11/3/17. All of the chemicals were within containment. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking.

For data sources see[10]

References