If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20718 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.34,"lon":-80.67,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001489 | |
Farm/Lease Name: GIUSTO E CRC JF | |
License Status: Producing | |
License Date: 2017-08-18 | |
Spud Date: 2017-10-16 | |
Spud Drilling Contractor: PIONEER DRILLING | |
Final Drill Date: 2017-10-31 | |
Well Total Depth: 18046.00 ft | |
Configuration: Horizontal | |
Latitude: 40.340000 | |
Longitude: -80.670000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-03-30 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/30/2017, Expired Date:3/30/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-08-18 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:8/18/2017, Expired Date:8/18/2019 12:00:00 PM, Drilling unit acres:551.415, Proposed Well Type:OG, Proposed Well Class:NWC |
Reached Total Depth | 2017-10-31 | |
Correction to Well | 2017-12-29 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Construction Permit Expires | 2018-08-18 | |
Completion Report Received | 2018-09-12 | |
Record Last Modified | 2018-09-12 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-09-12 | 10037 | 10178 | 0 |
2018-09-12 | 17777 | 17882 | 0 |
17777 | 17882 | 0 | |
10037 | 10178 | 0 | |
10037 | 10178 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 02/19/2018 | 04/09/2018 | 9808 | 12,836,800.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 87.8469 | 106,930,000.0 |
GEL 1100 | Mountain Supply and Service LLC | Gelling Agent | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FR-76 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
Hydrochloric acid | 7647-01-0 | 7.5 | 0.0167495 | 20387 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000242895 | 296 | ||||
Citric acid | 77-92-9 | 60 | 0.0033861 | 4122 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00658471 | 8016 | ||||
Neutralized Polyacrylic Emulsion | Proprietary | 10 | 0.00235602 | 2868 | ||||
Methanol | 67-56-1 | 60 | 0.000516518 | 630 | ||||
Ethylene Glycol | 107-21-1 | 60 | 0.0141361 | 17207 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 11.8192 | 14,386,700.0 | ||||
Acrylamide acrylate copolymer | Proprietary | 30 | 0.0175101 | 21314 | ||||
Inorganic salt | Proprietary | 30 | 0.0175101 | 21314 | ||||
Emulsifier | 9002-92-0 | 10 | 0.00003038 | 37 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000242895 | 296 | ||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.00109745 | 1336 | ||||
Ethanol | 64-17-5 | 1 | 0.00021949 | 268 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0175101 | 21314 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.000242895 | 296 | ||||
Polymer | Not assigned | 68 | 0.000206586 | 252 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00008096 | 99 | ||||
Olefins | Proprietary | 5 | 0.00009716 | 120 | ||||
PH Buffer | 8055-55-8 | 15 | 0.00004557 | 56 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0.00002195 | 27 | ||||
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.294076 | 357961 | |
LP-70 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-04-07 | H2O | 8 | 274341 Gal | 287585 | Halliburton | STAGE 45/45
STAGES 2-44 SEE IMAGES |
2018-02-19 | H2O | 15 | 299589 Gal | 352793 | Halliburton | STAGE 1/45
STAGES 2-44 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | 3309903 | 0 | 180 |
2019 | ASCENT RESOURCES UTICA LLC | 738127 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | Brine | 20275 | 180 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 3272 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-140866257 | 2019-7-22 0:00: | UL | No Violations | 1.00 |
-239545496 | 2017-6-26 0:00: | DD | No Violations | 1.00 |
-241778376 | 2017-12-13 0:00 | CT | No Violations | 0.50 |
-345027929 | 2018-2-23 0:00: | PL | No Violations | 1.00 |
-855274158 | 2020-1-15 0:00: | PW | No Violations | 1.00 |
0239545496 | 2017-06-26 | Drill / Deepen / Reopen | No Violations | I am on site today to verify that cement had been brought to surface on the conductor cement job on 6/22/17. I witnessed good cement in the floor of the cellar to a depth of 6.75 feet, leaving a cement barrier between the cellar and the soil below approximately 14 inches thick. Falcon 26 is currently moving onto the location to drill the surface portion of the wells on this pad. |
0241778376 | 2017-12-13 | Completion Testing | No Violations | On the date of my inspection I found a well maintained access road with a locked gate. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. There are 4 recently drilled wells on the pad surrounded by metal fences. The wells have not been hydraulically fractured yet. Production equipment on the pad includes, 4 sand separators, 4 gas production units, and two 500 barrel tanks within a metal dike. The production equipment is surrounded by concrete barriers. There is a garbage roll off container being stored on the pad near the lease road entrance. |
0345027929 | 2018-02-23 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed Halliburton was onsite under direction of Ascent Company man Delbert. This pad is splitting water with the Stone pad, and the other pad is currently receiving water for frac. 2h and 4h are being fraced currently. Received call from Mr. Niece (ODOT aviation) on 2/21 in regards to crane not having a permit from ODOT. Pad is within 10000 feet of jefferson airpark and ODOT has permits for erections that close to airport. A permanent solar powered light was installed on crane. Outslope of pad is vegetated and stable. Lease road is stable. Site meets requirements of ORC 1509.072A for preliminary restoration. |
1509370659 | 2017-10-30 | Drill / Deepen / Reopen | No Violations | On the date of my inspection I found Pioneer rig 77 preparing to move the rig. They completed the cement job on their production string early this morning. Currently they are cleaning the mud pits out while waiting for cement to set before removing the slips. Ascent estimates they will have the rig moved off the pad by 11/3/17. All of the chemicals were within containment. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking. |
For data sources see[10]