If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20723 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.3,"lon":-80.69,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Cross Creek Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001477 | |
Farm/Lease Name: BATES S CRC JF | |
License Status: Producing | |
License Date: 2017-05-18 | |
Spud Date: 2017-04-28 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2017-08-22 | |
Well Total Depth: 20788.00 ft | |
Configuration: Horizontal | |
Latitude: 40.300000 | |
Longitude: -80.690000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-04-06 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/6/2017, Expired Date:4/6/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-05-18 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:5/18/2017, Expired Date:5/18/2019 12:00:00 PM, Drilling unit acres:561.358, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-08-22 | |
Completion Report Received | 2017-12-14 | |
Record Last Modified | 2017-12-16 | |
Conversion to Producer | 2018-01-05 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Construction Permit Expires | 2018-05-18 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-12-15 | 10510 | 10616 | 30 |
2017-12-15 | 20480 | 20589 | 18 |
10510 | 10616 | 30 | |
20480 | 20589 | 18 | |
10510 | 10616 | 30 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/14/2017 | 10/13/2017 | 9690 | 16,620,900.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | CI-14 | BJ Services | Corrosion Inhibitor | MSDS and Non-MSDS Ingredients are
listed below the green line. |
Listed Below | 0 | 0.00251107 | 4035.19 |
Other Chemical(s) | BJ Services | See Trade Name(s) List | Water | 7732-18-5 | 92.5 | 0.965767 | 1,551,950.0 | |
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 86.2384 | 138,581,000.0 | |
MAQUAT 25:12 | BJ Services | Biocide | MSDS and Non-MSDS Ingredients are
listed below the green line. |
Listed Below | 0 | 0.0235339 | 37818 | |
HCl, 5.1 - 7.5% | BJ Services | Acidizing | MSDS and Non-MSDS Ingredients are
listed below the green line. |
Listed Below | 0 | 0.952722 | 1,530,990.0 | |
Acetic acid, Potassium Salt | 64-19-7 | 0.1 | 0.00007043 | 113.173 | ||||
Fatty Acids | 61790-12-3 | 10 | 0.000156942 | 252.199 | ||||
Sodium Chloride | 7647-14-5 | 5 | 0.004041 | 6493.55 | ||||
Methanol | 67-56-1 | 100 | 0.00156942 | 2521.99 | ||||
Petroleum distillates | 64742-47-8 | 30 | 0.021128 | 33951.8 | ||||
Sorbitan monooleate ethoxylate | 9005-65-6 | 5 | 0.00352133 | 5658.64 | ||||
Olefin | 64743-02-8 | 5 | 0.00007847 | 126.1 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00641833 | 10314 | ||||
Ethanol | 64-17-5 | 5 | 0.00106972 | 1719 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0714 | 114849 | ||||
Citric Acid | 77-92-9 | 60 | 0.00409514 | 6580.73 | ||||
Potassium Chloride | 7447-40-7 | 1 | 0.000519563 | 834.916 | ||||
Crystalline Silica (Quartz) | 14808-60-7 | 100 | 12.5992 | 20,246,400.0 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 10 | 0.00213944 | 3438 | ||||
Ethylene Glycol | 107-21-1 | 30 | 0.0155869 | 25047.5 | ||||
Acetic acid | 127-08-2 | 1 | 0.000704266 | 1131.73 | ||||
Modified Thiourea Polymer | 68527-49-1 | 7 | 0.000109859 | 176.539 | ||||
Calcium Chloride | 10043-52-4 | 5 | 0.00259781 | 4174.58 | ||||
Acrylamide Modified Acrylic Polymer | 38193-60-1 | 60 | 0.042256 | 67903.6 | ||||
Polyoxyalkylenes | 68951-67-7 | 30 | 0.000470825 | 756.597 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001569 | 25.2199 | ||||
Sorbian, mono-(9Z)-9octadecenoate | 1338-43-8 | 5 | 0.00352133 | 5658.64 | ||||
Tetrasodium EDTA | 64-02-8 | 0.1 | 0.00007043 | 113.173 | ||||
2-propenoic, polymer with sodium phosphinate, sodium salt | 71050-62-9 | 20 | 0.0103913 | 16698.3 | ||||
Propargyl Alcohol | 107-19-7 | 5 | 0.00007847 | 126.1 | ||||
Oxyalkylated Alcohol | 78330-21-9 | 5 | 0.00352133 | 5658.64 | ||||
Quaternary Ammonium Compound | 68424-85-1 | 5 | 0.00106972 | 1719 | ||||
ThinFrac MP-1 | BJ Services | Friction Reducer | MSDS and Non-MSDS Ingredients are
listed below the green line. |
Listed Below | 0 | 0.12057 | 193752 | |
Sand, White | BJ Services | Proppant | MSDS and Non-MSDS Ingredients are
listed below the green line. |
Listed Below | 0 | 12.5992 | 20,246,400.0 | |
FraCare SI 720 | BJ Services | Scale Inhibitor | MSDS and Non-MSDS Ingredients are
listed below the green line. |
Listed Below | 0 | 0.0555932 | 89336 | |
ResCare IC 300L | BJ Services | Iron Control | MSDS and Non-MSDS Ingredients are
listed below the green line. |
Listed Below | 0 | 0.00750776 | 12064.7 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-10-13 | H2O | 15 | 6151 Bbl | 359209 | BAKER-HUGHES | STAGE 58/58
STAGES 2-57 SEE IMAGES |
2017-09-10 | H2O | 15 | 8278 Bbl | 351019 | BAKER-HUGHES | STAGE 1/58
STAGES 2-57 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ASCENT RESOURCES UTICA LLC | 968309 | 0 | 52 |
2018 | ASCENT RESOURCES UTICA LLC | 6215505 | 0 | 365 |
2019 | ASCENT RESOURCES UTICA LLC | 658556 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ASCENT RESOURCES UTICA LLC | Brine | 16016 | 52 |
2018 | ASCENT RESOURCES UTICA LLC | Brine | 32114 | 365 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 3394 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1551377393 | 2017-4-27 0:00: | CS | No Violations | 3.50 |
-1600892140 | 2017-12-13 0:00 | PW | No Violations | 0.80 |
-220561216 | 2019-12-10 0:00 | UL | No Violations | 1.00 |
-550786994 | 2017-5-10 0:00: | CS | No Violations | 12.00 |
0035321754 | 2017-09-21 | Completion Testing | No Violations | On the date of my inspection I found a BJ Services crew rigged up on all 3 wells on the pad for hydraulic fracturing operations. While I was on site I witness BJ Services pump the frac job for stage 11 of 54 on this well and stage 11 of 56 on permit 3408120723. They are currently on stage 10 of 58 on this well. All hazardous materials are within double containment which is in good condition, free of visible punctures or tears. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position. |
0550786994 | 2017-05-10 | Casing String Witnessed | No Violations | I am on site to witness the running and cementing of 13.375 inch surface casing. Falcon Rig 26 drilled a 17.5 inch diameter hole to a depth of 1520 feet and set 1507 feet of 13.375 inch 61 pound per foot casing. O-Tex established circulation with fresh water, pumped 1600 sacks of class H cement, 1.19 yield and 15.6 pound per gallon, 2 percent calcium chloride, 0.25 pound cello flake per sack. Approximately 85 barrels of cement returned to surface. The wiper plug landed and pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 1180 psi for 5 minutes. |
1493614839 | 2017-04-27 | Drill / Deepen / Reopen | No Violations | I am on site today to witness the cementing of 30 inch conductor casing. Precision Drilling drilled a 36 inch diameter hole to a depth of 100 feet and attempted to run 100 feet of 30 inch diameter 118 pound per foot conductor casing. While running casing, they could not get past the second joint. Precision had to ream the hole out with a 42 inch auger down to 60 feet to get past the blockage then ream the rest of the hole out. Once the hole is cleaned out they will attempt to run the casing again. |
1493648933 | 2017-04-28 | Casing String Witnessed | No Violations | Upon arrival on location I found the crew still drilling the hole for the conductor pipe from the Dickson 3H. The cement top for the 1H was tagged 1 foot below ground level. The Bates cement was tagged at 67 feet. 400 sacks of class A cement was pumped with no returns to surface. We shut down for 1 hour and then another 200 sacks of class A cement was pumped with no returns. Shut down and waiting on more cement. |
1551377393 | 2017-04-27 | Casing String Witnessed | No Violations | Onsite with Inspector Scott Scheiner to witness cementing of the 30 inch diameter conductor casing. Cement job was not witnessed, see Inspector Scheiners report this date for more information |
1600892140 | 2017-12-13 | Production Wells | No Violations | |
1608825186 | 2017-08-22 | Drill / Deepen / Reopen | No Violations | On the date of my inspection I found Patterson drilling rig 292 rigging down. The rig is currently being hauled to another location by Warren Trucking. The dirty rig pieces are being cleaned with pressure washers within containment. The fluid produced by the cleaning process is being hauled off site for disposal. The pad drains are in the closed position and do not appear to be leaking. |
1702061525 | 2020-1-29 0:00: | PW | No Violations | 1.00 |
1776450808 | 2017-08-02 | Drill / Deepen / Reopen | No Violations | On the date of my inspection I found Patterson drilling rig 292 drilling the intermediate section of this well at approximately 3000 feet. During my inspection I found the plastic containment berm on the high traffic side of the rig to be completely flattened. The containment is not capable of holding water if the berms are compressed. I spoke with the Ascent company man about the issue and he indicated that he would call the containment contractor out to repair the damaged areas as soon as possible. All of the chemicals were within containment. Areas of the pad appear to have subsided while the rig has been on site. Most of the water from the rig containment drains to the northwest corner of the pad containment. Ascent is having issues keeping up with the water when it rains. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking. |
2082791881 | 2017-08-16 | Drill / Deepen / Reopen | No Violations | On the date of my inspection I found Patterson drilling rig 292 drilling the production section of this well at approximately 19000 feet. Ascent expects to reach a total depth of approximately 20800 feet by 8/17/17. During my inspection I found the containment near the casing rack had been torn open and was allowing any fluid near the front of the rig to drain out onto the pad. I spoke with the Ascent company man about the issue and he indicated that he would call the containment contractor out to repair the damaged areas as soon as possible. All of the chemicals were within containment. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking. |
35321754 | 2017-9-21 0:00: | CT | No Violations | 2.20 |
For data sources see[10]