Well Details

Well ID: 34-081-20736
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Cross Creek Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001521
Farm/Lease Name: MINGO SE CRC JF
License Status: Producing
License Date: 2017-11-21
Spud Date: 2017-12-14
Spud Drilling Contractor: XTREME DRILLING
Final Drill Date: 2018-06-28
Well Total Depth: 24479.00 ft
Configuration: Horizontal
Latitude: 40.320000
Longitude: -80.740000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-09-28 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:9/28/2017, Expired Date:9/28/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-11-21 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/21/2017, Expired Date:11/21/2019 12:00:00 PM, Drilling unit acres:328.585, Proposed Well Type:OG, Proposed Well Class:POOL
Completion Report Received 2018-01-14
Correction to Well 2018-03-09 CHANGE TO TARGET INFORMATION & UNIT SIZE.
Reached Total Depth 2018-06-28
Correction to Well 2018-09-14 TAKE POINT PER AS-DRILLED
Construction Permit Expires 2018-11-21
Record Last Modified 2019-01-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-01-22 10373 10233 0
2019-01-22 24334 24228 0
24334 24228 0
10373 10233 0
10373 10233 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/14/2018 10/02/2018 9640 18,269,200.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Hib PE-18 UPP Scale Inhibitor Proprietary Scale Inhibitor Proprietary 30 0.0139384 23995.7
Unihib G UPP Acid inhibitor Methanol 67-56-1 5 0.00001938 33.372
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000193847 333.717
Formaldehyde 50-00-0 1 0.00000388 6.674
Thiourea 62-56-6 1 0.00000388 6.674
Butyl diglycol 112-34-5 75 0.00029077 500.575
HCL Acid (7.5%) UPP Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0370577 63796.6
I-7L UPP Iron Control Hydroxyacetic acid 79-14-1 5 0.000128931 221.96
Ammonium glycolate 35249-89-9 20 0.000515723 887.841
Ethylene glycol 107-21-1 20 0.000515723 887.841
K-Bac 1005 UPP Biocide Water 7732-18-5 44.3 0.00599037 10312.7
Polyethylene glycol 7732-18-5 50 0.00676114 11639.6
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5.8 0.000778883 1340.88
Other Chemical(s) Listed Above See Trade Name(s) List Sodium Chloride 7647-14-5 15 0.00782554 13472
Oleic Acid Diethanolamide 93-83-4 3 0.00156511 2694.41
Ammonium Chloride 12125-02-9 2 0.00104341 1796.27
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00156511 2694.41
Thiourea 62-56-6 1 0.00000388 6.674
Hydroxyacetic acid 79-14-1 5 0.000128931 221.96
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000193847 333.717
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0130426 22453.4
Polyoxyethylene Sorbitan Monoleate 9005-65-6 1 0.000521703 898.135
Polyethylene glycol 7732-18-5 50 0.00676114 11639.6
Water 7732-18-5 55 0.0286936 49397.4
Formaldehyde 50-00-0 1 0.00000388 6.674
Water 7732-18-5 44.3 0.00599037 10312.7
Methanol 67-56-1 5 0.00001938 33.372
Ethylene glycol 107-21-1 20 0.000515723 887.841
Water Ascent Carrier/Base Fluid Water 7732-18-5 100 88.5579 152,456,000.0
Sand UPP Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 10.8221 18,630,700.0
Unislick CST-LA UPP Friction reducer Ammonium Chloride 12125-02-9 2 0.00104341 1796.27
Water 7732-18-5 55 0.0286936 49397.4
Polyoxyethylene Sorbitan Monoleate 9005-65-6 1 0.000521703 898.135
Oleic Acid Diethanolamide 93-83-4 3 0.00156511 2694.41
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00156511 2694.41
Sodium Chloride 7647-14-5 15 0.00782554 13472
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0130426 22453.4
CHEMPLEX-Polymer_00019 Trade Secret 25 0.0130426 22453.4

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-10-02 H2O 15 5140 Bbl 226816 Universal Well Services Inc. STAGE 81/81

STAGES 2-80 SEE IMAGES

2018-08-14 H2O 15 4996 Bbl 234741 Universal Well Services Inc. STAGE 1/81

STAGES 2-80 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 838912 0 36
2019 ASCENT RESOURCES UTICA LLC 2714605 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 10683 36
2019 ASCENT RESOURCES UTICA LLC Brine 19554 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-10731626 2018-8-28 0:00: CT No Violations 1.00
-1244518225 2018-9-12 0:00: CT No Violations 1.00
-1445019177 2019-12-10 0:00 UL No Violations 1.00
-1602615020 2018-7-18 0:00: CT No Violations 1.00
-199903938 2018-10-22 0:00 CT No Violations 1.00
-276140568 2018-6-12 0:00: UD No Violations 1.00
-419361046 2018-7-26 0:00: CT No Violations 1.00
-487624342 2018-9-25 0:00: CT No Violations 1.00
-7752530 2018-10-4 0:00: CT No Violations 1.00
0007752530 2018-10-04 Completion Testing No Violations On the day of my inspection I identified myself to company man Justin. Frac crew has moved off of location and they are cleaning up the containment in preperation for drill out. 2 kill plugs set in well at 9150 and 9300. Surface annular pressure is 650 and intermediate annular pressure is 700.
0010731626 2018-08-28 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location. Identified myslef to company men Wendall Brady and Chris Telford. Stage 38 has been perforated. There are 81 total stages. Plug was set at 17909, bottom perforations at 17898, and top perforations at 17757. Spent guns are stuck in the wellbore around 13500 feet and they will need to fish for them. Surface annular pressure is 0 and intermediate annular pressure is 750.
0199903938 2018-10-22 Completion Testing No Violations On the day of my inspection I found Deep Well snub #11 onsite. I identified myself to company man James Edwards. The rig has just got into this well and came to drill the first kill plug during my inspection. Surface annular pressure is 550 and intermediate is 600. James anticipates moving off of this pad late in the week.
0249561975 2018-08-14 Completion Testing No Violations On the day of my inspection I witnessed Universal frac crew on location. ID to company men Brady and Wendall. They are beginning stage 1 frac during my inspection. Bottom perforation is at 24334 and top perforation is at 24288. They will pump 3000 gallons of 15% HCL for this stage. Surface annular pressure is 0 and intermediate annular pressure is 350, prior to pressuring up on well.
0276140568 2018-06-12 Urban Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Xtreme 802 was drilling an 8.5 inch diameter hole at a depth of 9225 feet. They are not seeing a lot of gas and are drilling with a 13.2 ppg mud. Walk around location revealed no issues with containment. Pad drains are shut.
0419361046 2018-07-26 Completion Testing No Violations On the day of my inspection I met with Company man Duke Landry. No frac crew is onsite yet. Miscellaneous equipment onsite such as aboveground storage tank and several frac tanks. Surface annular pressure is 0 and intermediate annular is 450.
0448693015 2018-06-05 Urban Drill / Deepen / Reopen No Violations On the day of my inspection Xtreme 802 is tripping out of the hole for their second bit failure. 12.25 inch diameter hole is currently drilled to 5300 feet. Walk around rig revealed areas needing minor housekeeping, mainly around the shale shakers.
0487624342 2018-09-25 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location. Identified myself to company men David and Gonzo. This well is on stage 63/81. Stage 63 was just perforated. Plug set at 13534, bottom perforation at 13523, and top perforation at 13382. Surface annular pressure is 0 and intermediate is 550.
0618432696 2018-09-18 Completion Testing No Violations On the day of my inspection I witnessed Universal frac crew on location. This well is on stage 46/81. Guns were retrieved from hole since last inspection. Stage 46 frac plug is at 16509, bottom perforation at 16498, and top perforation at 16358. Intermediate annualr pressure is 580 psi. Surface gauge not viewed as there was pressure on the lines for frac.
0706773099 2018-08-22 Completion Testing No Violations On the day of my inspection I witnessed Universal has a frac crew on location. ID to company man Chris Telford. Wireline set stage 16 frac plug at 21759 feet, bottom perforation at 21747 feet, and top perforation at 21607 feet. They ran 5 guns with 4 shots on 36 foot spacing. Surface annular pressure is 0 and intermediate annular pressure is 500. They will pump this stage next with 1000 gallons of 7.5% HCL and 230000 lbs of sand.
0924303290 2018-02-23 Preliminary Restoration No Violations On the day of my inspection I found this pad containg four labeled wells. Wells have surface casing set in them and are awaiting a larger rig to finish. The pad is fenced, gated, and locked. All disturbed area is heavily mulched and doing well with all the rain the area has received over the past 2 weeks. Leas road also in good shape. Pad drains are shut. Site meets requirements of ORC 1509.072A for preliminary restoration.
1008940669 2018-06-20 Urban Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Xtreme 802 drilling their lateral section on oil based mud at 17700 feet. Containment around the shale shakers is soiled and should be cleaned up before it migrates off containment. Shale shakers would be on south side of the wellheads. Company man Heath, who just returned to today, said he is aware and that it is his first order or business.
1244518225 2018-09-12 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location. Identified myself to company man Gonzo. Stage 38 has been perforated. No changes have occurred on this well since my previous inspection on 8/28.There are 81 total stages. Plug was set at 17909, bottom perforations at 17898, and top perforations at 17757. Spent guns are stuck in the wellbore around 13500 feet and they will need to fish for them. Surface annular pressure is 0 and intermediate annular pressure is 550. Coiled tubing will be on location later today to fish for the spent guns.
1513299306 2017-12-14 Casing String Witnessed No Violations I am on site today to witness the cementing of 30 inch conductor casing. Precision Drilling drilled a 42 inch diameter hole to a depth of 70 feet and then a 30 inch diameter hole from 70 to 100 feet and ran 100 feet of 30 inch diameter 118 pound per foot conductor casing. O-Tex Pumping LLC pumped 395 sacks of class H cement, 1.2 yield, 15.6 pounds per gallon with 1.5 percent Calcium Chloride and 0.25 pound per sack cello-flake. O-Tex then displaced with 71 barrels of water, leaving 15 feet of cement in the casing. Cement did not return to surface and remained approximately 15 feet below the base of the cellar in the annulus. Ascent will top out with grout.
1602615020 2018-07-18 Completion Testing No Violations On the day of my inspection I met with Company man Duke Landry. Frack stacks are on wells, an aboveground storage tank, and two frac tanks are onsite. Universal will be coming to this location after finishing the Elite pad. Surface annular pressure is 0 and the intermediate annular pressure is 450.
1637547051 2018-08-07 Completion Testing No Violations On the day of my inspection I witnessed Universal frac crew moving onto location. ID to Company Man Bub Ruckert. Mr. Ruckert believes they will likely start stimulation operations on Saturday. There is an above ground storage tank onsite. Not all equipment is onsite this date. Surface annular pressure is 0 and intermediate annular pressure is 500.
1936008026 2018-01-16 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1446 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming casing ran 1439.73 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot and a 3.7 foot stickup. Casing was centralized with 12 centralizers. Shoe track is 42.5 feet long. Halliburton was onsite with 1465 sacks of class H Neocem cement. Cement weighed with mudscale at 15.8 ppg and yield of 1.241. 50% excess ran in open hole. Cement displaced with 212 barrels of fresh water. 10 barrels of water spacer pumped ahead of cement. 25 barrels of gel pumped ahead of water spacer. 84 barrels of cement returned to surface, and floats held with 0.5 barrel back to truck.
1963212301 2018-06-28 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Xtreme 802 laying down drill pipe. Well was drilled to 24507 feet and 5.5 inch diameter production casing was cemented in place on the 27th by Schlumberger. They stated 9.5 barrels of cement to surface.
249561975 2018-8-14 0:00: CT No Violations 1.00
448693015 2018-6-5 0:00:0 UD No Violations 1.00
618432696 2018-9-18 0:00: CT No Violations 1.00
706773099 2018-8-22 0:00: CT No Violations 1.00
924303290 2018-2-23 0:00: PL No Violations 1.00

For data sources see[10]