If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20739 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.3,"lon":-80.75,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Cross Creek Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001515 | |
Farm/Lease Name: NOLAN S CRC JF | |
License Status: Producing | |
License Date: 2017-10-13 | |
Spud Date: 2017-10-31 | |
Spud Drilling Contractor: | |
Final Drill Date: 2018-01-03 | |
Well Total Depth: 18530.00 ft | |
Configuration: Horizontal | |
Latitude: 40.300000 | |
Longitude: -80.750000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-10-13 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:10/13/2017, Expired Date:10/13/2019 12:00:00 PM, Drilling unit acres:631.959, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2018-01-03 | |
Correction to Well | 2018-03-30 | CORRECTION TO TARGET AND TAKE-POINT INFORMATION FROM AS DRILLED SURVEY PLAT. |
Construction Permit Expires | 2018-10-13 | |
Completion Report Received | 2018-10-26 | |
Record Last Modified | 2018-11-01 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-10-31 | 10193 | 10334 | 0 |
2018-10-31 | 18283 | 18384 | 0 |
18283 | 18384 | 0 | |
10193 | 10334 | 0 | |
10193 | 10334 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/15/2018 | 07/15/2018 | 9592 | 10,270,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SAND-COMMON WHITE - 100 MESH, 3307 LB BAG | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
EXCELERATE PS-2 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 1.49814 | 1,462,410.0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 87.6427 | 85,552,000.0 | |
SCALECHEK LP-70 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
SP BREAKER | Halliburton | Breaker | Listed Below | Listed Below | 0 | 0 | 0 | |
GEL 1100 | Mountain Supply & Service | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Acrylic acid | 79-10-7 | 0.01 | 0.00000237 | 3 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.00032338 | 316 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 10.82 | 10,561,900.0 | ||||
Methanol | 67-56-1 | 60 | 0.000678194 | 663 | ||||
Emulsifier | 9002-92-0 | 10 | 0.00003284 | 33 | ||||
Ethylene glycol | 107-21-1 | 60 | 0.0142272 | 13888 | ||||
Sodium polyacrylate | 9003-04-7 | 1 | 0.00023712 | 232 | ||||
Sodium persulfate | 7775-27-1 | 100 | 0.00001024 | 10 | ||||
Citric acid | 77-92-9 | 60 | 0.00450812 | 4401 | ||||
Polymer Blend | Proprietary | 68 | 0.000223335 | 219 | ||||
Inorganic salt | Proprietary | 30 | 0.0161284 | 15744 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.00032338 | 316 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0.00002245 | 22 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.00032338 | 316 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.000107793 | 106 | ||||
Telmer | Proprietary | 10 | 0.0023712 | 2315 | ||||
Ethanol | 64-17-5 | 1 | 0.000224526 | 220 | ||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.00112263 | 1096 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000001 | 1 | ||||
Olefins | Proprietary | 5 | 0.000129352 | 128 | ||||
Acrylamide acrylate polymer | Proprietary | 30 | 0.0161284 | 15744 | ||||
Hydroteated light petroleum distillate | 64742-47-8 | 30 | 0.0161284 | 15744 | ||||
Hydrochloric acid | 7647-01-0 | 7.5 | 0.107139 | 104583 | ||||
pH Buffer | 8055-55-8 | 15 | 0.00004926 | 49 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00673578 | 6576 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-06-27 | H2O | 15 | 243089 Gal | 248810 | Halliburton | STAGE 1/47
STAGES 2-46 SEE IMAGES |
2018-07-12 | H2O | 15 | 215180 Gal | 226465 | Halliburton | DTSGE 47/47
STAGES 2-46 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | 2899813 | 0 | 129 |
2019 | ASCENT RESOURCES UTICA LLC | 1333515 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | Brine | 20997 | 129 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 6376 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1152485951 | 2017-12-12 0:00 | DD | No Violations | 2.30 |
-1300810154 | 2018-4-17 0:00: | CT | No Violations | 1.00 |
-1525757704 | 2018-7-12 0:00: | CT | No Violations | 1.00 |
-1894857213 | 2018-7-18 0:00: | CT | No Violations | 1.00 |
-1910230924 | 2018-8-1 0:00:0 | CT | No Violations | 1.00 |
-1918224241 | 2019-12-10 0:00 | UL | No Violations | 1.00 |
-35615811 | 2017-10-31 0:00 | CS | No Violations | 2.50 |
-773490009 | 2018-7-26 0:00: | CT | No Violations | 1.00 |
0035615811 | 2017-10-31 | Casing String Witnessed | No Violations | I am on site today to witness the cementing of 30 inch conductor casing. Precision Drilling drilled a 36 inch diameter hole to a depth of 111 feet and ran 111 feet of 30 inch diameter 118 pound per foot conductor casing. O-Tex Pumping LLC pumped 390 sacks of class H cement, 1.2 yield, 15.6 pounds per gallon with 1.5 percent Calcium Chloride and 0.25 pound per sack cello-flake. O-Tex then displaced with 80 barrels of water, leaving 13 feet of cement in the casing. Good cement returned to surface and remained static. Approximately 20 barrels of cement returned to surface, Ascent left approximately 18 inches of cement in the cellar as a seal. |
0773490009 | 2018-07-26 | Completion Testing | No Violations | On the day of my inspection I witnessed Deep Well Snub 11 onsite. Rig is drilling out on the 2H well. This well has been drilled out. Surface annular pressure is 450 and intermediate annular pressure is 650. |
1152485951 | 2017-12-12 | Drill / Deepen / Reopen | No Violations | On the date of my inspection I found a well maintained lease road with an unlocked gate. The pad is surrounded by an earthen dike with healthy vegetation and a fence with an unlocked gate. Ascent is currently rigging up Patterson Drilling rig 795 on this well. The company man expects that they should be ready to spud on 12/16/17. |
1300810154 | 2018-04-17 | Completion Testing | No Violations | On the day of my inspection I found Weir and Cameron on location putting on the tubing heads and valves respectively. The pad has not been stimulated and they are preparing for Halliburton frack crew. |
1325367512 | 2018-06-15 | Completion Testing | No Violations | On the day of my inspection I witnessed a halliburton frac crew was onsite. Surface annular pressure is 450 psi and intermediate pressure is 550 psi. This well is not rigged up for fracking yet. Currently rigged up on 1h, 2h, and 3h wells. |
1514382599 | 2018-01-03 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found Patterson 795 drilling the 8.5 inch diameter hole section at 10,139 feet. Company man Russ White stated that the wellbore is not making any fluid and there is currently no flare burning. Containment is functioning as designed. Air temperature is 4 degrees and any water on ground is frozen. Pad drains are shut. 9.625 inch diameter casing cemented on 12-25. |
1514904876 | 2018-01-02 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Patterson 795 had a drilled an 8.5 inch diameter hole to a depth of 18530. Wyoming casing ran 18535 feet of 5.5 inch diameter production casing, j-55, #/ft with a 5 foot stick up. Halliburton onsite with 3265 sacks of lead cement, with a yield of 1.09 and weight of 15.0. 10% excess ran. Bumped plug, floats held, no cement to surface. |
1525757704 | 2018-07-12 | Completion Testing | No Violations | On the day of my inspection I witnessed Halliburton was rigged up to this well. They started the last stage, 47/47 but the agiator is bent and they cannot pump sand. Top perforation is at 10193 and bottom perforation is at 10334. Perforated with 5 guns having 4 shots each on 35 foot spacing. Surface annular pressure is 475 and intermediate annular pressure is 565. Well is currently shut in until they get agitator fixed and can resume frac. Breakdown pressure was 9305 at 30 barrels per minute. |
1678173955 | 2018-06-29 | Completion Testing | No Violations | On the day of my inspection wireline was coming out of the well after shooting perforations for stage 4. Frac plug is at 17913 feet. Halliburton is onsite but blender broke down and they are waiting on repairs. Intermediate annular pressure is 711 psi. |
1809293653 | 2018-10-26 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed this contain contains five properly labeled producting wells. Wells do not have tubing in them and are produced on natural reservoir pressure through the 5.5 inch diameter casing. All wells on the pad are producing from each side of the wellhead. Production equipment includes 10 GPUs, 10 sand seperators, 2 500 barrel steel tanks in their own containment, and 1 combustor. Surface annular pressure is 24 and intermediate annular pressure is 366. Site meets requirements of OAC 1509.072A for preliminary restoration. |
1894857213 | 2018-07-18 | Completion Testing | No Violations | On the day of my inspection I found Deep Well Snub 11 rig moving onto location. Pad has been fracked and rig will drill out plugs. Surface annular pressure is 0 and intermediate annular pressure is 600. |
1910230924 | 2018-08-01 | Completion Testing | No Violations | On the day of my inspection I was accompanied by DOGRM inspector Bob Roush. ID to company man David Rapattoni. Deep Well Snub 11 rig onsite and set up on the 3H well. Surface annular pressure is 400 and intermediate annular pressure is 650 psi. Drill out has been completed on this well. |
1933074215 | 2020-4-20 0:00: | PW | No Violations | 1.00 |
For data sources see[10]