34-081-20745

Well Details

Well ID: 34-081-20745
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Cross Creek Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001521
Farm/Lease Name: MINGO SW CRC JF
License Status: Producing
License Date: 2017-11-21
Spud Date: 2017-12-14
Spud Drilling Contractor:
Final Drill Date: 2018-05-07
Well Total Depth: 22075.00 ft
Configuration: Horizontal
Latitude: 40.320000
Longitude: -80.740000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-11-21 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/21/2017, Expired Date:11/21/2019 12:00:00 PM, Drilling unit acres:256.865, Proposed Well Type:OG, Proposed Well Class:EOUT
Correction to Well 2018-03-09 CHANGE IN UNIT SIZE AND TARGET INFORMATION.
Reached Total Depth 2018-05-07
Construction Permit Expires 2018-11-21
Completion Report Received 2019-05-30
Record Last Modified 2019-06-05

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-06-05 9846 9986 0
2019-06-05 21809 21917 0
21809 21917 0
9846 9986 0
9846 9986 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/28/2018 10/03/2018 9642 15,210,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Unihib G UPP Acid inhibitor Methanol 67-56-1 5 0.00001972 28.327
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000197191 283.271
Formaldehyde 50-00-0 1 0.00000394 5.665
Thiourea 62-56-6 1 0.00000394 5.665
Butyl diglycol 112-34-5 75 0.000295787 424.907
K-Bac 1005 UPP Biocide Water 7732-18-5 44.3 0.00620227 8909.74
Polyethylene glycol 7732-18-5 50 0.0070003 10056.1
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5.8 0.000806435 1158.47
HCL Acid (7.5%) UPP Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0363989 52288
HCL Acid (15%) UPP Acidizing Hydrochloric Acid 7647-01-0 15 0.00313823 4508.15
Water Ascent Carrier/Base Fluid Water 7732-18-5 100 88.3597 126,931,000.0
Other Chemical(s) Listed Above See Trade Name(s) List Sodium Chloride 7647-14-5 15 0.0076169 10941.9
Ammonium Chloride 12125-02-9 2 0.00101559 1458.92
Ethylene glycol 107-21-1 20 0.000528725 759.529
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00152338 2188.38
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0126948 18236.5
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000197191 283.271
Formaldehyde 50-00-0 1 0.00000394 5.665
Water 7732-18-5 55 0.0279286 40120.3
Water 7732-18-5 44.3 0.00620227 8909.74
Oleic Acid Diethanolamide 93-83-4 3 0.00152338 2188.38
Hydroxyacetic acid 79-14-1 5 0.000132181 189.882
Thiourea 62-56-6 1 0.00000394 5.665
Methanol 67-56-1 5 0.00001972 28.327
Polyoxyethylene Sorbitan Monoleate 9005-65-6 1 0.000507794 729.46
Polyethylene glycol 7732-18-5 50 0.0070003 10056.1
I-7L UPP Iron Control Ethylene glycol 107-21-1 20 0.000528725 759.529
Ammonium glycolate 35249-89-9 20 0.000528725 759.529
Hydroxyacetic acid 79-14-1 5 0.000132181 189.882
Unislick CST-LA UPP Friction reducer Polyoxyethylene Sorbitan Monoleate 9005-65-6 1 0.000507794 729.46
Oleic Acid Diethanolamide 93-83-4 3 0.00152338 2188.38
CHEMPLEX-Polymer_00019 Trade Secret 25 0.0126948 18236.5
Ammonium Chloride 12125-02-9 2 0.00101559 1458.92
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0126948 18236.5
Sodium Chloride 7647-14-5 15 0.0076169 10941.9
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00152338 2188.38
Water 7732-18-5 55 0.0279286 40120.3
Sand UPP Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 11.0089 15,814,700.0
Scale Hib PE-18 UPP Scale Inhibitor Proprietary Scale Inhibitor Proprietary 30 0.0138777 19935.7

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-10-02 H2O 7 4814 Bbl 232121 Universal Well Services Inc.
2018-08-28 H2O 7 5081 Bbl 230051 Universal Well Services Inc.

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 1254584 0 51
2019 ASCENT RESOURCES UTICA LLC 2652915 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 10852 51
2019 ASCENT RESOURCES UTICA LLC Brine 16362 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1203201700 2018-7-26 0:00: CT No Violations 1.00
-1248933639 2018-5-1 0:00:0 DD No Violations 1.00
-1553561007 2018-8-7 0:00:0 CT No Violations 1.00
-1756563491 2019-12-10 0:00 UL No Violations 1.00
-1851113202 2018-8-14 0:00: CT No Violations 1.00
-1880528989 2017-12-14 0:00 CS No Violations 7.20
-238550390 2018-1-9 0:00:0 CS No Violations 4.00
-369282251 2018-8-22 0:00: CT No Violations 1.00
-385280361 2018-10-4 0:00: CT No Violations 1.00
-646978206 2018-7-18 0:00: CT No Violations 1.00
0033809213 2018-02-23 Preliminary Restoration No Violations On the day of my inspection I found this pad containg four labeled wells. Wells have surface casing set in them and are awaiting a larger rig to finish. The pad is fenced, gated, and locked. All disturbed area is heavily mulched and doing well with all the rain the area has received over the past 2 weeks. Leas road also in good shape. Pad drains are shut. Site meets requirements of ORC 1509.072A for preliminary restoration.
0036081639 2018-10-22 Completion Testing No Violations On the day of my inspection I found Deep Well snub #11 onsite. I identified myself to company man James Edwards. This well has had frac plugs drilled out and is awaiting flowback. Surface annular pressure is 450 and intermediate is 570. Production casing pressure was 3100 after drill out. James anticipates moving off of this pad late in the week.
0238550390 2018-01-09 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1467 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming casing ran 1460 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot and a 3 foot stickup. Casing was centralized with 11 centralizers. Shoe track is 39 feet long. Halliburton was onsite with 1466 sacks of class H Neocem cement. Cement weighed with mudscale at 15.8 ppg and yield of 1.241. 50% excess ran in open hole. Cement displaced with 216 barrels of fresh water. 10 barrels of water pumped ahead of cement. 60 barrels of cement returned to surface, and floats held with 1.25 barrels back.
0369282251 2018-08-22 Completion Testing No Violations On the day of my inspection I witnessed Universal has a frac crew on location. ID to company man Chris Telford. This well has not had a stage done on it yet. They are waiting until to rig is off of the neighboring gordon pad. Surface annular pressure is 0 and intermediate annular pressure is 600.
0385280361 2018-10-04 Completion Testing No Violations On the day of my inspection I identified myself to company man Justin. Frac crew has moved off of location and they are cleaning up the containment in preperation for drill out. 2 kill plugs set in well at 9000 and 9130. Surface annular pressure is 150 and intermediate annular pressure is 1000.
0646978206 2018-07-18 Completion Testing No Violations On the day of my inspection I met with Company man Duke Landry. Frack stacks are on wells, an aboveground storage tank, and two frac tanks are onsite. Universal will be coming to this location after finishing the Elite pad. Surface annular pressure is 0 and the intermediate annular pressure is 500.
1010045012 2018-04-26 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Xtreme 802 drilling an 8.5 inch diameter hoe at the top of their curve. They are just starting to kick off at 8970 feet. Company man Heath plans to land the cruve around 9900 feet. He said that 9.625 inch diameter surface job had cement to surface. There is no flare burning during my inspection. Location is clean.
1150338996 2018-08-28 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location. Identified myslef to company men Wendall Brady and Chris Telford. Well has not been stimulated.Well has 69 stages. Stage 1 perforations will be at 21917 and top perforations at 21809. Surface annular pressure is 0 and intermediate annular pressure is 600.
1203201700 2018-07-26 Completion Testing No Violations On the day of my inspection I met with Company man Duke Landry. No frac crew is onsite yet. Miscellaneous equipment onsite such as aboveground storage tank and several frac tanks. Surface annular pressure is 0 and intermediate annular is 700.
1248933639 2018-05-01 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Xtreme 802 was drilling their lateral section with an 8.5 inch diameter bit. They are at 15871 feet. No flare is burning. Location is clean and free of debris. Pad drains are shut.
1343678970 2018-09-18 Completion Testing No Violations On the day of my inspection I witnessed Universal frac crew on location. This well is on stage 33/69. Stage 33 frac plug is at 16333, bottom perforation at 16322, and top perforation at 16181. Intermediate annualr pressure is 680 psi. Surface gauge not viewed as there was pressure on the lines for frac.
1543690204 2018-09-25 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location. Identified myself to company men David and Gonzo. This well is on stage 50/69. Stage 50 was just stimulated. Plug set at 13341, bottom perforation at 13330, and top perforation at 13189. Breakdown pressure was 9379 at 16.9 barrels per minute. 1051 gallons of 7.5 % HCl pumped. ISIP of 6504 and 5 minute ISIP 5560. Maximum treating pressure was 11200 and average was 10021. Maximum rate was 85.2 barrels per minute and average rate was 71.9. 5126 barrels of total slurry pumped. 51153 lbs of 100 mesh sand and 180800 lbs of 40/70 mesh for a total of 231953 lbs of sand. Surface annular pressure is 0 and intermediate is 600.
1553561007 2018-08-07 Completion Testing No Violations On the day of my inspection I witnessed Universal frac crew moving onto location. ID to Company Man Bub Ruckert. Mr. Ruckert believes they will likely start stimulation operations on Saturday. There is an above ground storage tank onsite. Not all equipment is onsite this date. Surface annular pressure is 0 and intermediate annular pressure is 900. Company man said he would have the pressure bleed off when they get all rigged up.
1843862133 2018-09-12 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location. Identified myself to company man Gonzo. Stage 25 has been perforated. There are 69 total stages. Plug was set at 17741, bottom perforations at 17729, and top perforations at 17589. Well was perforated with 5 guns with 6 shots on 35 foot spacing. Wireline is coming out of the wellbore during my inspection. Surface annular pressure is 0 and intermediate annular pressure is 750.
1851113202 2018-08-14 Completion Testing No Violations On the day of my inspection I witnessed Universal frac crew on location. ID to company men Brady and Wendall. They are beginning stage 1 frac of the 6H well during my inspection. This well has not been stimulated yet. Surface annular pressure is 0 and intermediate annular pressure is 470.
1880528989 2017-12-14 Casing String Witnessed No Violations I am on site today to witness the cementing of 30 inch conductor casing. Precision Drilling drilled a 36 inch diameter hole to a depth of 100 feet and ran 100 feet of 30 inch diameter 118 pound per foot conductor casing. O-Tex Pumping LLC pumped 395 sacks of class H cement, 1.2 yield, 15.6 pounds per gallon with 1.5 percent Calcium Chloride and 0.25 pound per sack cello-flake. O-Tex then displaced with 71 barrels of water, leaving 15 feet of cement in the casing. Cement did not return to surface and remained approximately 10 feet below the base of the cellar in the annulus. Ascent will top out with grout after the cement sets up.
33809213 2018-2-23 0:00: PL No Violations 1.00
36081639 2018-10-22 0:00 CT No Violations 1.00

For data sources see[10]