If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-081-20745 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.32,"lon":-80.74,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Jefferson | |
| Municipality: Cross Creek Township | |
| Operator Name: ASCENT RESOURCES UTICA LLC | |
| Well Pad ID: US-OH-001521 | |
| Farm/Lease Name: MINGO SW CRC JF | |
| License Status: Producing | |
| License Date: 2017-11-21 | |
| Spud Date: 2017-12-14 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 2018-05-07 | |
| Well Total Depth: 22075.00 ft | |
| Configuration: Horizontal | |
| Latitude: 40.320000 | |
| Longitude: -80.740000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2017-11-21 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/21/2017, Expired Date:11/21/2019 12:00:00 PM, Drilling unit acres:256.865, Proposed Well Type:OG, Proposed Well Class:EOUT |
| Correction to Well | 2018-03-09 | CHANGE IN UNIT SIZE AND TARGET INFORMATION. |
| Reached Total Depth | 2018-05-07 | |
| Construction Permit Expires | 2018-11-21 | |
| Completion Report Received | 2019-05-30 | |
| Record Last Modified | 2019-06-05 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2019-06-05 | 9846 | 9986 | 0 |
| 2019-06-05 | 21809 | 21917 | 0 |
| 21809 | 21917 | 0 | |
| 9846 | 9986 | 0 | |
| 9846 | 9986 | 0 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 08/28/2018 | 10/03/2018 | 9642 | 15,210,500.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Unihib G | UPP | Acid inhibitor | Methanol | 67-56-1 | 5 | 0.00001972 | 28.327 |
| Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000197191 | 283.271 | ||||
| Formaldehyde | 50-00-0 | 1 | 0.00000394 | 5.665 | ||||
| Thiourea | 62-56-6 | 1 | 0.00000394 | 5.665 | ||||
| Butyl diglycol | 112-34-5 | 75 | 0.000295787 | 424.907 | ||||
| K-Bac 1005 | UPP | Biocide | Water | 7732-18-5 | 44.3 | 0.00620227 | 8909.74 | |
| Polyethylene glycol | 7732-18-5 | 50 | 0.0070003 | 10056.1 | ||||
| 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 5.8 | 0.000806435 | 1158.47 | ||||
| HCL Acid (7.5%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0363989 | 52288 | |
| HCL Acid (15%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.00313823 | 4508.15 | |
| Water | Ascent | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.3597 | 126,931,000.0 | |
| Other Chemical(s) | Listed Above | See Trade Name(s) List | Sodium Chloride | 7647-14-5 | 15 | 0.0076169 | 10941.9 | |
| Ammonium Chloride | 12125-02-9 | 2 | 0.00101559 | 1458.92 | ||||
| Ethylene glycol | 107-21-1 | 20 | 0.000528725 | 759.529 | ||||
| Alcohol Ethoxylate Surfactants | 68551-12-2 | 3 | 0.00152338 | 2188.38 | ||||
| Hydrotreated Petroleum Distillate | 64742-47-8 | 25 | 0.0126948 | 18236.5 | ||||
| Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000197191 | 283.271 | ||||
| Formaldehyde | 50-00-0 | 1 | 0.00000394 | 5.665 | ||||
| Water | 7732-18-5 | 55 | 0.0279286 | 40120.3 | ||||
| Water | 7732-18-5 | 44.3 | 0.00620227 | 8909.74 | ||||
| Oleic Acid Diethanolamide | 93-83-4 | 3 | 0.00152338 | 2188.38 | ||||
| Hydroxyacetic acid | 79-14-1 | 5 | 0.000132181 | 189.882 | ||||
| Thiourea | 62-56-6 | 1 | 0.00000394 | 5.665 | ||||
| Methanol | 67-56-1 | 5 | 0.00001972 | 28.327 | ||||
| Polyoxyethylene Sorbitan Monoleate | 9005-65-6 | 1 | 0.000507794 | 729.46 | ||||
| Polyethylene glycol | 7732-18-5 | 50 | 0.0070003 | 10056.1 | ||||
| I-7L | UPP | Iron Control | Ethylene glycol | 107-21-1 | 20 | 0.000528725 | 759.529 | |
| Ammonium glycolate | 35249-89-9 | 20 | 0.000528725 | 759.529 | ||||
| Hydroxyacetic acid | 79-14-1 | 5 | 0.000132181 | 189.882 | ||||
| Unislick CST-LA | UPP | Friction reducer | Polyoxyethylene Sorbitan Monoleate | 9005-65-6 | 1 | 0.000507794 | 729.46 | |
| Oleic Acid Diethanolamide | 93-83-4 | 3 | 0.00152338 | 2188.38 | ||||
| CHEMPLEX-Polymer_00019 | Trade Secret | 25 | 0.0126948 | 18236.5 | ||||
| Ammonium Chloride | 12125-02-9 | 2 | 0.00101559 | 1458.92 | ||||
| Hydrotreated Petroleum Distillate | 64742-47-8 | 25 | 0.0126948 | 18236.5 | ||||
| Sodium Chloride | 7647-14-5 | 15 | 0.0076169 | 10941.9 | ||||
| Alcohol Ethoxylate Surfactants | 68551-12-2 | 3 | 0.00152338 | 2188.38 | ||||
| Water | 7732-18-5 | 55 | 0.0279286 | 40120.3 | ||||
| Sand | UPP | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 99.9 | 11.0089 | 15,814,700.0 | |
| Scale Hib PE-18 | UPP | Scale Inhibitor | Proprietary Scale Inhibitor | Proprietary | 30 | 0.0138777 | 19935.7 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2018-10-02 | H2O | 7 | 4814 Bbl | 232121 | Universal Well Services Inc. | |
| 2018-08-28 | H2O | 7 | 5081 Bbl | 230051 | Universal Well Services Inc. |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2018 | ASCENT RESOURCES UTICA LLC | 1254584 | 0 | 51 |
| 2019 | ASCENT RESOURCES UTICA LLC | 2652915 | 0 | 90 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2018 | ASCENT RESOURCES UTICA LLC | Brine | 10852 | 51 |
| 2019 | ASCENT RESOURCES UTICA LLC | Brine | 16362 | 90 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1203201700 | 2018-7-26 0:00: | CT | No Violations | 1.00 |
| -1248933639 | 2018-5-1 0:00:0 | DD | No Violations | 1.00 |
| -1553561007 | 2018-8-7 0:00:0 | CT | No Violations | 1.00 |
| -1756563491 | 2019-12-10 0:00 | UL | No Violations | 1.00 |
| -1851113202 | 2018-8-14 0:00: | CT | No Violations | 1.00 |
| -1880528989 | 2017-12-14 0:00 | CS | No Violations | 7.20 |
| -238550390 | 2018-1-9 0:00:0 | CS | No Violations | 4.00 |
| -369282251 | 2018-8-22 0:00: | CT | No Violations | 1.00 |
| -385280361 | 2018-10-4 0:00: | CT | No Violations | 1.00 |
| -646978206 | 2018-7-18 0:00: | CT | No Violations | 1.00 |
| 0033809213 | 2018-02-23 | Preliminary Restoration | No Violations | On the day of my inspection I found this pad containg four labeled wells. Wells have surface casing set in them and are awaiting a larger rig to finish. The pad is fenced, gated, and locked. All disturbed area is heavily mulched and doing well with all the rain the area has received over the past 2 weeks. Leas road also in good shape. Pad drains are shut. Site meets requirements of ORC 1509.072A for preliminary restoration. |
| 0036081639 | 2018-10-22 | Completion Testing | No Violations | On the day of my inspection I found Deep Well snub #11 onsite. I identified myself to company man James Edwards. This well has had frac plugs drilled out and is awaiting flowback. Surface annular pressure is 450 and intermediate is 570. Production casing pressure was 3100 after drill out. James anticipates moving off of this pad late in the week. |
| 0238550390 | 2018-01-09 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1467 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming casing ran 1460 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot and a 3 foot stickup. Casing was centralized with 11 centralizers. Shoe track is 39 feet long. Halliburton was onsite with 1466 sacks of class H Neocem cement. Cement weighed with mudscale at 15.8 ppg and yield of 1.241. 50% excess ran in open hole. Cement displaced with 216 barrels of fresh water. 10 barrels of water pumped ahead of cement. 60 barrels of cement returned to surface, and floats held with 1.25 barrels back. |
| 0369282251 | 2018-08-22 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal has a frac crew on location. ID to company man Chris Telford. This well has not had a stage done on it yet. They are waiting until to rig is off of the neighboring gordon pad. Surface annular pressure is 0 and intermediate annular pressure is 600. |
| 0385280361 | 2018-10-04 | Completion Testing | No Violations | On the day of my inspection I identified myself to company man Justin. Frac crew has moved off of location and they are cleaning up the containment in preperation for drill out. 2 kill plugs set in well at 9000 and 9130. Surface annular pressure is 150 and intermediate annular pressure is 1000. |
| 0646978206 | 2018-07-18 | Completion Testing | No Violations | On the day of my inspection I met with Company man Duke Landry. Frack stacks are on wells, an aboveground storage tank, and two frac tanks are onsite. Universal will be coming to this location after finishing the Elite pad. Surface annular pressure is 0 and the intermediate annular pressure is 500. |
| 1010045012 | 2018-04-26 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Xtreme 802 drilling an 8.5 inch diameter hoe at the top of their curve. They are just starting to kick off at 8970 feet. Company man Heath plans to land the cruve around 9900 feet. He said that 9.625 inch diameter surface job had cement to surface. There is no flare burning during my inspection. Location is clean. |
| 1150338996 | 2018-08-28 | Completion Testing | No Violations | On the day of my inspection I witnessed a Universal frac crew on location. Identified myslef to company men Wendall Brady and Chris Telford. Well has not been stimulated.Well has 69 stages. Stage 1 perforations will be at 21917 and top perforations at 21809. Surface annular pressure is 0 and intermediate annular pressure is 600. |
| 1203201700 | 2018-07-26 | Completion Testing | No Violations | On the day of my inspection I met with Company man Duke Landry. No frac crew is onsite yet. Miscellaneous equipment onsite such as aboveground storage tank and several frac tanks. Surface annular pressure is 0 and intermediate annular is 700. |
| 1248933639 | 2018-05-01 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Xtreme 802 was drilling their lateral section with an 8.5 inch diameter bit. They are at 15871 feet. No flare is burning. Location is clean and free of debris. Pad drains are shut. |
| 1343678970 | 2018-09-18 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal frac crew on location. This well is on stage 33/69. Stage 33 frac plug is at 16333, bottom perforation at 16322, and top perforation at 16181. Intermediate annualr pressure is 680 psi. Surface gauge not viewed as there was pressure on the lines for frac. |
| 1543690204 | 2018-09-25 | Completion Testing | No Violations | On the day of my inspection I witnessed a Universal frac crew on location. Identified myself to company men David and Gonzo. This well is on stage 50/69. Stage 50 was just stimulated. Plug set at 13341, bottom perforation at 13330, and top perforation at 13189. Breakdown pressure was 9379 at 16.9 barrels per minute. 1051 gallons of 7.5 % HCl pumped. ISIP of 6504 and 5 minute ISIP 5560. Maximum treating pressure was 11200 and average was 10021. Maximum rate was 85.2 barrels per minute and average rate was 71.9. 5126 barrels of total slurry pumped. 51153 lbs of 100 mesh sand and 180800 lbs of 40/70 mesh for a total of 231953 lbs of sand. Surface annular pressure is 0 and intermediate is 600. |
| 1553561007 | 2018-08-07 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal frac crew moving onto location. ID to Company Man Bub Ruckert. Mr. Ruckert believes they will likely start stimulation operations on Saturday. There is an above ground storage tank onsite. Not all equipment is onsite this date. Surface annular pressure is 0 and intermediate annular pressure is 900. Company man said he would have the pressure bleed off when they get all rigged up. |
| 1843862133 | 2018-09-12 | Completion Testing | No Violations | On the day of my inspection I witnessed a Universal frac crew on location. Identified myself to company man Gonzo. Stage 25 has been perforated. There are 69 total stages. Plug was set at 17741, bottom perforations at 17729, and top perforations at 17589. Well was perforated with 5 guns with 6 shots on 35 foot spacing. Wireline is coming out of the wellbore during my inspection. Surface annular pressure is 0 and intermediate annular pressure is 750. |
| 1851113202 | 2018-08-14 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal frac crew on location. ID to company men Brady and Wendall. They are beginning stage 1 frac of the 6H well during my inspection. This well has not been stimulated yet. Surface annular pressure is 0 and intermediate annular pressure is 470. |
| 1880528989 | 2017-12-14 | Casing String Witnessed | No Violations | I am on site today to witness the cementing of 30 inch conductor casing. Precision Drilling drilled a 36 inch diameter hole to a depth of 100 feet and ran 100 feet of 30 inch diameter 118 pound per foot conductor casing. O-Tex Pumping LLC pumped 395 sacks of class H cement, 1.2 yield, 15.6 pounds per gallon with 1.5 percent Calcium Chloride and 0.25 pound per sack cello-flake. O-Tex then displaced with 71 barrels of water, leaving 15 feet of cement in the casing. Cement did not return to surface and remained approximately 10 feet below the base of the cellar in the annulus. Ascent will top out with grout after the cement sets up. |
| 33809213 | 2018-2-23 0:00: | PL | No Violations | 1.00 |
| 36081639 | 2018-10-22 0:00 | CT | No Violations | 1.00 |
For data sources see[10]