If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20754 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.31,"lon":-80.71,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Cross Creek Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001532 | |
Farm/Lease Name: GORDON SE CRC JF | |
License Status: Producing | |
License Date: 2018-04-27 | |
Spud Date: 2015-06-21 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-06-13 | |
Well Total Depth: 18808.00 ft | |
Configuration: Horizontal | |
Latitude: 40.310000 | |
Longitude: -80.710000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-01-19 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:1/19/2018, Expired Date:1/19/2019, Drilling unit acres:124.203, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2018-04-27 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/27/2018, Expired Date:4/27/2019, Drilling unit acres:441.609, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-06-13 | |
Correction to Well | 2018-09-14 | |
Construction Permit Expires | 2019-04-27 | |
Completion Report Received | 2019-05-30 | |
Record Last Modified | 2019-06-06 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2019-06-05 | 9874 | 10015 | 0 |
2019-06-05 | 18370 | 18511 | 0 |
18370 | 18511 | 0 | |
9874 | 10015 | 0 | |
9874 | 10015 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/30/2018 | 10/22/2018 | 9736 | 10,014,100.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
LD-2850 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.268295 | 258795 | |
MX 5-2402 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
Propargyl Alchohol | 107-19-7 | 5 | 0.00004602 | 45 | ||||
Hydrochloric acid | 7647-01-0 | 7.5 | 0.01887 | 18200 | ||||
Hydrotreated light Petroleum Distillate | 64742-47-8 | 30 | 0.0167077 | 16116 | ||||
Methonal | 67-56-1 | 100 | 0.000920437 | 888 | ||||
Phosphate of a Diamine, Sodium Salt | Proprietary | 30 | 0.00637604 | 6151 | ||||
Modified Thiourea Polymer | Proprietary | 30 | 0.000276131 | 267 | ||||
Citric acid | 77-92-9 | 60 | 0.00397101 | 3831 | ||||
Sodium Nitrate | 7631-99-4 | 60 | 0.016215 | 15641 | ||||
9-Octadecenamide | 93-83-4 | 5 | 0.00278462 | 2686 | ||||
pH Buffer | 8055-55-8 | 15 | 0.00000442 | 5 | ||||
Sodium persulfate | 7775-27-1 | 100 | 0.00000104 | 1 | ||||
Polymer Blend | Not assigned | 68 | 0.00002002 | 20 | ||||
Methanol | 67-56-1 | 30 | 0.00637604 | 6151 | ||||
Ethoxylated Alcohols | Proprietary | 5 | 0.00004602 | 45 | ||||
Ammonium Chloride | 12125-02-9 | 5 | 0.00278462 | 2686 | ||||
Sodium Chloride | 7647-14-5 | 30 | 0.0167077 | 16116 | ||||
Alcohols C12-16 | 68551-12-2 | 5 | 0.00278462 | 2686 | ||||
Emulsifier | 9002-92-0 | 10 | 0.00000294 | 3 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000000 | 1 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 11.8536 | 11,433,800.0 | ||||
Hydrotreated ligh Petroleum Distillate | 64742-47-8 | 30 | 0.0167077 | 16116 | ||||
MX 8-4543 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
SP BREAKER | Halliburton | Breaker | Listed Below | Listed Below | 0 | 0 | 0 | |
SCALECHEK LP-50 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 75.1345 | 72,473,400.0 | |
GEL 1100 | Mountain Oilfield Supply & Service | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Recycled Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 12.6469 | 12,199,000.0 | |
FDP-S1296-17 | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-10-22 | H2O | 7 | 190304 Gal | 238300 | Halliburton | |
2018-10-01 | H2O | 7 | 220399 Gal | 235520 | Halliburton |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | 1946549 | 0 | 79 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | Brine | 9254 | 79 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2019912173 | 2018-10-4 0:00: | CT | No Violations | 1.00 |
-584749391 | 2018-5-9 0:00:0 | CS | No Violations | 2.00 |
-695789409 | 2018-10-22 0:00 | CT | No Violations | 1.00 |
-752448405 | 2019-6-18 0:00: | UL | No Violations | 1.00 |
-905690668 | 2018-11-15 0:00 | CT | No Violations | 1.00 |
0364125511 | 2018-11-05 | Completion Testing | No Violations | On the day of my inspection I found this pad to contain five wells. Identified myself to company man Chuck Davies. Halliburton frac crew is on location. Stimulation is completed on this well. Surface annular pressure was 0 and intermediate annular was 400. |
0584749391 | 2018-05-09 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Precision had augured a 36 inch diameter hole to 100 feet. 100 feet of 30 inch diameter conductor casing was run. CJs was onsite with 365 sacks of class A cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50 percent excess ran. Mix water tested 70 degrees Fahrenheit, pH of 7 and 39 ppm chlorides. Cement was displaced with 75 barrels of fresh water. No cement returned to surface. Cement tagged at 27 feet. Casing will be grouted to surface tomorrow morning. Drillers hit water a 30 feet below surface and unmined rock at 40 feet. |
0695789409 | 2018-10-22 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location tied into the 2h, 4h, and 6h wells. Identified myself to Company men Chris Nunez and Justin. Surface annular pressure is 0 and intermediate is 500. This well is on frac stage 48/50. This stage had plug set at 10381, bottom perforation at 10369, and top perforation at 10228. This stage has been stimulated. Break down pressure was 9226 at 25.45 barrels per minute. Average pressure was 10327 with max being 11269. Average rate was 84.88 barrels per minute with max being 85.68. Initial shut in pressure was 6872. No 5 minute ISIP was done. They pumped 4614 barrels of total fluid including 2500 gallons of 7.5% HCl, 60050 lbs of 100 mesh sand, and 147060 lbs of 40/70 mesh sand. |
0905690668 | 2018-11-15 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location. This well has been stimulated. Surface annular pressure is 0 and intermediate annular pressure is 367. |
1276161600 | 2018-12-26 | Completion Testing | No Violations | On the day of my inspection I witnessed Hybrid Drilling R252 on location drilling out frack plugs. Plugs have all been drilled out on this well and is awaiting flow back operations. Surface and annular gauges read 0 with valves to gauges closed. |
1527269433 | 2018-05-25 | Urban Drill / Deepen / Reopen | No Violations | On the day of my inspection I found Patterson 584 rigging up on the 6h well. They plan to spud this afternoon with a 17.5 inch diameter bit. 100 feet of 30 inch conductor casing is set. |
1545339105 | 2018-12-18 | Completion Testing | No Violations | On the day of my inspection I witnessed Hybrid R252 on location drilling out frac plugs. The rig has drilled the plugs out of this well. Surface annular pressure gauge reads 0 and intermediate annular gauge reads 500. Production equipment includes five GPUs, five line heaters, two sand traps, and two 500 barrel steel tanks in their own containment. |
1580322178 | 2020-1-29 0:00: | UP | No Violations | 1.00 |
1813234121 | 2018-06-12 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Patterson 584 had reached total depth of 18808 with their 8.5 inch diameter bit. Wyoming casing ran 5.5 inch diameter casing, p-110, 23 #/ft, to a depth of 18804. Schlumberger pumped 75 barrels of 14.8 spacer and 678 barrels of 15.6, class H, tail cement. Cement displaced with 397.5 barrels. Schlumberger broguht 3810 sacks of cement with a yeidl of 1.0. Was not on location for entire cement job. |
1879291148 | 2018-06-05 | Urban Drill / Deepen / Reopen | No Violations | On the day of my inspection I found Patterson 584 was hung in the hole at 10988 feet with an 8.75 inch diameter bit. Rig still has good circulation and has been pulling 350k for approximately 2 hours. They landed the curve at 10163 feet. During my inspection they got permission to pull 375k and the drill string was freed. They began a cleanup up cycle directly after. |
2019912173 | 2018-10-04 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location. I identified myself to company man Lewis. They are currently running wireline in on stage 8/50. Intermediate annular pressure is 531. Plug will be set at 17461, with bottom perforation at 17449 and top perforation at 17308. |
2041724404 | 2019-9-11 0:00: | PW | No Violations | 1.00 |
2048102012 | 2018-05-10 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Precision add 9 yards of 9 sack grout to back side of casing bringing cement to surface. |
364125511 | 2018-11-5 0:00: | CT | No Violations | 1.00 |
For data sources see[10]