If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20755 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.18,"lon":-80.78,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Mount Pleasant Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001534 | |
Farm/Lease Name: HARR E MTP JF | |
License Status: Producing | |
License Date: 2018-01-26 | |
Spud Date: 2018-04-11 | |
Spud Drilling Contractor: | |
Final Drill Date: 2018-07-19 | |
Well Total Depth: 18110.00 ft | |
Configuration: Horizontal | |
Latitude: 40.180000 | |
Longitude: -80.780000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-01-26 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:1/26/2018, Expired Date:1/26/2020 12:00:00 PM, Drilling unit acres:683.641, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-07-19 | |
Record Last Modified | 2018-12-20 | |
Correction to Well | 2018-12-21 | UPDATE TAKE/TARGET PER AS-DRILLED PLAT |
Construction Permit Expires | 2020-01-26 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
17835 | 17939 | 0 | |
9835 | 9976 | 0 | |
9835 | 9976 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/01/2018 | 10/11/2018 | 9869 | 8,945,430.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FDP S1296-17 | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
Methanol | 67-56-1 | 100 | 0.00041744 | 337 | ||||
Propargyl Alcohol | 107-19-7 | 5 | 0.00002087 | 17 | ||||
Ethylene glycol | 107-21-1 | 60 | 0.0146288 | 11810 | ||||
Acrylamide polymer | Proprietary | 30 | 0.0226752 | 18306 | ||||
Modified thiourea ploymer | Proprietary | 30 | 0.000125232 | 102 | ||||
Acrylamide acrylate polymer | Proprietary | 30 | 0.0088627 | 7155 | ||||
Contains no hazardous substances
in concentrations above cut-off values according to the competent authority |
CAS Not Assigned | 100 | 0.00244258 | 1972 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0315379 | 25461 | ||||
Sodium Nitrate | 7631-99-4 | 60 | 0.0211367 | 17064 | ||||
Acrylic acid | 79-10-7 | 0.01 | 0.00000244 | 2 | ||||
Hydrochloric acid | 7647-01-0 | 7.5 | 0.0151257 | 12211 | ||||
Citric acid | 77-92-9 | 60 | 0.00180426 | 1457 | ||||
Polyoxyalkylene | Proprietary | 5 | 0.00377921 | 3051 | ||||
Telmer | Proprietary | 10 | 0.00243813 | 1969 | ||||
Inorganic salt | Proprietary | 30 | 0.0088627 | 7155 | ||||
Sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.0106965 | 8635 | ||||
Ethoxylated Alchols | Proprietary | 5 | 0.00002087 | 17 | ||||
Sodium polyacrylate | 9003-04-7 | 1 | 0.000243813 | 197 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 6.87582 | 5,550,680.0 | ||||
Sobitan, mono-9-octadecenoate, (Z) | 1338-43-8 | 5 | 0.00377921 | 3051 | ||||
EXCELERATE PS-2 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 92.3045 | 74,515,100.0 | |
MC MX 8-4543 | MultiChem | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
MC MX 5-2402 | MultiChem | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
OptiKleen-WF(TM) | Halliburton | Concentrate | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
SCALECHEK LP-70 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.717837 | 579495 | |
FIGHTR EC-3 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1085295772 | 2018-7-17 0:00: | DD | No Violations | 1.00 |
-154217264 | 2018-8-29 0:00: | PL | No Violations | 1.00 |
-1724603999 | 2018-7-11 0:00: | CS | No Violations | 3.00 |
-2071516546 | 2018-4-9 0:00:0 | DD | No Violations | 0.50 |
-761833761 | 2018-10-4 0:00: | CT | No Violations | 1.00 |
-779556925 | 2018-11-5 0:00: | CT | No Violations | 1.00 |
0154217264 | 2018-08-29 | Preliminary Restoration | No Violations | On the day of my inspection I found this pad to contain two unlabeled wells with night caps. Pressure gauges are in cellar underwater and unable to be read. Pad appears in good shape and is stable. The outslope of pad opposite the lease road entrance has a patch of cat tails growing, indicating a constant presence of water. ODNR engineering team is aware of the area. Wells have not been stimulated. Pad outslopes are vegetated and a locked fence surrounds location. Site meets requirements of OAC 1509.072A for preliminary restoration. |
0656598780 | 2018-10-23 | Completion Testing | No Violations | On the day of my inspection I found this pad to contain two wells that are not producing. Both wells have been stimulated but neither have been drilled out. The wells have two frac valves on them. IROC is onsite building production equipment. Surface annular pressure is 0 and intermediate annular pressure is 0. |
0761833761 | 2018-10-04 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location. I identified myself to company man Matt Bollinger. Stage 13/47 is perforated. Plug set at 15903, bottom perforation at 15892, and top perforation at 15751. Intermediate annular pressure is 664. They are preparing to frac this stage. |
0779556925 | 2018-11-05 | Completion Testing | No Violations | On the day of my inspection I found this pad containing 2 wells that have been stimulated and drilled out. Snubbing unit is moving off of location during this inspection. Identified myself to company man Josh McTheny. Surface annular pressure is 0 and intermediate annular gauge valve is closed. |
1085295772 | 2018-07-17 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 284 drilling an 8.75 inch diameter hole at 14905. Kick off point was 9100 and landing point was 10166. Planned total depth is 18111 feet. An animal hole was located in containment, possibly a groundhog. Company man Will Brousard was informed that the hole needed filled back in. No other issues noted on pad. |
1523886647 | 2018-04-12 | Casing String Witnessed | No Violations | Pad is at the end of TOWNSHIP ROAD 106, Rayland, Ohio (just east of Mt. Pleasant). On the day of my inspection I witnessed Express had augured a 36 inch diameter hole to a depth of 100 feet. 100 feet of 30 inch diameter conductor casing was run to 98 feet, leaving 2 feet above ground level. Express was onsite with 275 sacks of class A cement. Additives include 2% CaCl and .5 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. 50% percent excess ran. Cement was displaced with 74 barrels of fresh water. 10 barrels of cement returned to surface. |
1524708388 | 2018-04-25 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the mine string cement job. Falcon 26 drilled a 24 inch diameter open hole to a depth of 264 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming casing ran 250 feet of 18.625 inch diameter casing, j-55, 84.5 lbs/foot. Shoe track is 23 feet long. Cement Baskets were set at 175 feet. Coal encountered at 181-186 and void at 200-214 feet. CJ/O-tex was onsite with 445 sacks of class A cement. Additives include 3% CaCl and 0.2% X-air. Cement weighed with mudscale at 15.8 ppg and yield of 1.17. 50% excess ran in open hole. Cement displaced with 69 barrels of fresh water. 35 barrels of gel pumped ahead of cement. No cement returned to surface, but was tagged at 40 feet down after pumping. 30 barrels of cement pumped down backside through 40 feet of 1 inch diameter tubing. Tubing bottom at 33 feet. 7 barrels of cement returned to surface at 15.0 ppg. |
1530635119 | 2018-07-03 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 284 rigging up over this well. Surface casing previously set by top hole rig. Company man Mark Smith believes they should get to drilling tomorrow. |
1724603999 | 2018-07-11 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the 9.625 inch diameter second stage cement job. Patterson 284 drilled a 12.25 inch diameter open hole to 8940 feet and wyoming casing ran 8940 feet of 9.625 inch diameter, 40 lb/ft, l-80 casing. Shoe track is 85.6 feet long. DV tool set at 4780 feet. Hole loaded with 12 ppg oil base mud. Pumped on the first stage which I did not witness: 35% excess open hole, 40 barrels of mud push spacer 13.3 ppg, 215 barrels of 13.5 ppg lead cement, 124 barrels of 15.6 ppg tail cement. Returns were 40 barrels of spacer and 18 barrels of cement. Second stage pumped 40 barrels of 13.3 ppg mudpush and 349 barrels of 15.6 class A cement with 1.19 yield. 30% excess in open hole. 13.375 inch diameter casing, 61#/ft, j-55, set at 1540 feet. Returns were 40 barrels of spacer and 45 barrels of cement weighing 15.4 ppg. Schlumberger was cement contractor. |
2071516546 | 2018-04-09 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed an express auger rig setting cellars. I stopped at location to verify I knew location of pad for upcoming conductor jobs while I was in the immediate area. 2 cellars were set on pad. Drilling of the conductors should start tomorrow morning. |
2128282330 | 2018-08-15 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 284 has moved off of location. Contractors were onsite pressure washing the rig matting for transport. |
656598780 | 2018-10-23 0:00 | CT | No Violations | 1.00 |
For data sources see[5]