If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20758 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.19,"lon":-80.82,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Mount Pleasant Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001537 | |
Farm/Lease Name: GRYWALSKI E MTP JF | |
License Status: Producing | |
License Date: 2018-03-23 | |
Spud Date: 2018-09-12 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-11-22 | |
Well Total Depth: 24022.00 ft | |
Configuration: Horizontal | |
Latitude: 40.190000 | |
Longitude: -80.820000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-02-13 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:2/13/2018, Expired Date:2/13/2020 12:00:00 PM, Drilling unit acres:75.129, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2018-03-23 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/23/2018, Expired Date:3/22/2020 12:00:00 PM, Drilling unit acres:429.835, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-11-22 | |
Correction to Well | 2019-04-26 | UPDATE TAKE/TARGET PER AS-DRILLED PLAT |
Record Last Modified | 2019-06-11 | |
Construction Permit Expires | 2020-03-22 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
22823 | 22964 | 0 | |
9873 | 10014 | 0 | |
9873 | 10014 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/17/2019 | 02/08/2019 | 9472 | 15,737,200.0 | 183114 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FRW-1450 | FTSI | Friction Reducer | Listed Below Green Line | Listed Below | 0 | 0 | 0 |
CI-150 | FTSI | Acid Corrosion Inhibitor | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
Pump Kleen | FTSI | Pump and hose flush | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
100 Mesh Sand | FTSI | Proppant | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
Phosphorous Acid | 10294-56-1 | 2 | 0.000525461 | 0 | ||||
Isotridecanol, ethoxylated | 9043-30-5 | 2 | 0.00001915 | 0 | ||||
Glutaraldehyde | 111-30-8 | 5 | 0.0011508 | 0 | ||||
Quaternary ammonium compound | 68424-85-1 | 10 | 0.0023016 | 0 | ||||
Raffinates, Sorption Process | 64741-85-1 | 55 | 0.000526711 | 0 | ||||
Phosphonic Acid, {(Dimethylamino) Methylene} Bis - | 29712-30-9 | 5 | 0.00131365 | 0 | ||||
Methanol | 67-56-1 | 90 | 0.000852424 | 0 | ||||
Thiourea-formaldehyde Copolymer | 68527-49-1 | 10 | 0.00009471 | 0 | ||||
Guar gum | 9000-30-0 | 55 | 0.000526711 | 0 | ||||
Acetic acid | 64-19-7 | 40 | 0.0024044 | 0 | ||||
Alcohol Ethoxylate Surfactants | Proprietary | 10 | 0.00009471 | 0 | ||||
Quartz | 14808-60-7 | 4 | 0.00003831 | 0 | ||||
Hydrochloric acid | 7647-01-0 | 0.005 | 0.00000131 | 0 | ||||
Suspending Agent | 1302-78-9 | 5 | 0.00004788 | 0 | ||||
N-olefins | Proprietary | 3 | 0.00002841 | 0 | ||||
Sodium Metaborate | 7775-19-1 | 1.4 | 0.00000359 | 0 | ||||
Petroleum Distillate | 64742-47-8 | 55 | 0.000526711 | 0 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 30 | 0.0206529 | 0 | ||||
Orthophosphoric acid | 7664-38-2 | 0.75 | 0.000197048 | 0 | ||||
Silica, Quartz | 14808-60-7 | 100 | 2.28768 | 0 | ||||
Ethanol | 64-17-5 | 5 | 0.0011508 | 0 | ||||
Raffinates (petroleum), sorption process | 64741-85-1 | 100 | 0.0129906 | 0 | ||||
Polybutene (Isobutylene/Butene copolymer) | 9003-29-6 | 100 | 0.0129906 | 0 | ||||
Hydrogen Chloride | 7647-01-0 | 7.5 | 0.0761971 | 0 | ||||
Phosphonic Acid, {Nitrilotris (methylene)} Tris | 6419-19-8 | 35 | 0.00919556 | 0 | ||||
Hydrogen Chloride | 7647-01-0 | 20 | 0.00404378 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 5 | 0.00004736 | 0 | ||||
Sodium Perborate Tetrahydrate | 10486-00-7 | 98 | 0.00025119 | 0 | ||||
Alcohols, C11-14-iso-, C13-rich, ethoxylated | 78330-21-9 | 5 | 0.00344215 | 0 | ||||
Cationic Polyacrylamide | 9003-05-8 | 30 | 0.0206529 | 0 | ||||
Proprietary | Proprietary | 0 | 0 | 0 | ||||
Fatty Acids, Tall Oil | 61790-12-3 | 10 | 0.00009471 | 0 | ||||
White mineral oil | 8042-47-5 | 100 | 0.0129906 | 0 | ||||
Citric Acid | 77-92-9 | 30 | 0.0018033 | 0 | ||||
Water | Supplied by Operator | Base Fluid | Water | 7732-18-5 | 100 | 96.5368 | 131,249,000.0 | |
HVG-1 4.0 | FTSI | Water gelling agent | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
SPB-1 | FTSI | Breaker | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
Bactron K-139 | FTSI | Biocide | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
FE-200A | FTSI | Iron Control | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 55 | 0.0144502 | 0 | |
Water | 7732-18-5 | 50 | 0.0344215 | 0 | ||||
Water | 7732-18-5 | 92.5 | 0.939764 | 0 | ||||
Water | 7732-18-5 | 80 | 0.0161751 | 0 | ||||
Water | 7732-18-5 | 100 | 0.023016 | 0 | ||||
Water | 7732-18-5 | 45 | 0.00270495 | 0 | ||||
0.1%-7.5% HCL | FTSI | Acid | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
CS-1000 SI | FTSI | Scale Inhibitor | Listed Below Green Line | Listed Below | 0 | 0 | 0 | |
15.1%-20% HCL | FTSI | Acid | Listed Below Green Line | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | 435652 | 0 | 18 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | Brine | 2312 | 18 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1170842128 | 2019-6-17 0:00: | CT | No Violations | 1.00 |
-1481372529 | 2020-4-14 0:00: | PW | No Violations | 1.00 |
-2024406291 | 2019-10-8 0:00: | PW | No Violations | 1.00 |
-252107743 | 2020-7-9 0:00:0 | PW | No Violations | 1.00 |
-590036666 | 2019-6-26 0:00: | PW | No Violations | 1.00 |
0157942029 | 2019-02-13 | Completion Testing | No Violations | The day of the inspection revealed the well was fraced and completed with 76 stages being completed, and the kill plug set. The well is waiting on rig and snubbing unit for drill-out. The surface casing annulus is at 0 psi and the intermediate annulus casing pressure is at 350 psi. |
0564931117 | 2019-01-22 | Completion Testing | No Violations | On the day of my inspection I witnessed FTS on location and rigged up to both these wells. They are currently swapping out blenders and are not pumping on the wells. Wireline set stage 13 plug at 21050, with bottom perfs at 21038 and top perfs at 20890. Surface annular pressure is 0 and intermediate annular pressure is 100. |
0801670880 | 2018-11-07 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found Patterson 584 on location. They are dropping the bomb after displacing first stage on the 9.625 inch diameter cement job. 12.25 inch diameter hole was drilled to 8875 and casing was set at 8868, with DV tool at 4266. |
0912293534 | 2018-10-31 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Patterson 584 drilled a 17.5 inch diameter open hole to a depth of 1620 feet. Previous casing set and cemented was 18.625 inch diameter mine string casing to a depth of 281 feet. Wyoming Casing ran 1620 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot with 3 foot stick up. Casing was centralized. Shoe track is 45 feet long. Schlumberger was onsite with 1282 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 40% excess ran in open hole. Cement displaced with 239 barrels of fresh water. 25 barrels of gel pumped ahead of cement. 64 barrels of cement returned to surface, and floats held with 1 barrel back. |
0934983198 | 2018-11-14 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found Patterson 584 on location drilling an 8.5 inch diameter hole at 19667 feet. Estimated total depth is 23219 feet. There is a flare burning with 6200 units of gas. Mud weight is 13.8 and the rig is using managed pressure drilling (MPD). |
1138852538 | 2018-09-13 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Precision had augured a 36 inch diameter hole to 98 feet. 102 feet of 30 inch diameter conductor casing was run. Petroset was onsite with 315 sacks of class A cement. Additives include 2% CaCl and .5 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. 50 percent excess ran. Mix water tested 72 degrees Fahrenheit, pH of 7 and 36 ppm chlorides. Cement was displaced with 74 barrels of fresh water. 12 barrels of cement returned to surface. |
1566234917 | 2019-8-19 0:00: | PW | No Violations | 1.00 |
157942029 | 2019-2-13 0:00: | CT | No Violations | 0.20 |
1621684220 | 2020-7-31 0:00: | PW | No Violations | 1.00 |
1967000136 | 2018-10-30 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the mine string cement job. Patterson 584 drilled a 24 inch diameter open hole to a depth of 281 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming Casing ran 283 feet of 18.625 inch diameter casing, j-55, 87.5 lbs/foot. Shoe track is 24 feet long. Cement Baskets were set at 216 feet. Void encountered at 222-236 feet. Schlumberger was onsite with 610 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% excess ran in open hole. Cement displaced with 79 barrels of fresh water. 25 barrels of gel pumped ahead of cement. No cement returned to surface. 13 barrels of cement pumped down backside to set up on basket. An additional 67 barrels of cement was pumped down backside after a 2 hour wait time. 7 barrels of cement returned to surface weighing 14.9 ppg |
564931117 | 2019-1-22 0:00: | CT | No Violations | 1.00 |
801670880 | 2018-11-7 0:00: | DD | No Violations | 1.00 |
912293534 | 2018-10-31 0:00 | CS | No Violations | 4.00 |
934983198 | 2018-11-14 0:00 | DD | No Violations | 1.00 |
For data sources see[9]