Well ID: 34-081-20762
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Wayne Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001550
Farm/Lease Name: COLLINS WYN JF
License Status: Producing
License Date: 2018-04-18
Spud Date:
Spud Drilling Contractor:
Final Drill Date: 2018-07-21
Well Total Depth: 17946.00 ft
Configuration: Horizontal
Latitude: 40.340000
Longitude: -80.800000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-04-18 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/18/2018, Expired Date:4/17/2020 12:00:00 PM, Drilling unit acres:604.274, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-07-21
Correction to Well 2018-12-21 UPDATE TAKE/TARGET PER AS-DRILLED PLAT
Completion Report Received 2019-05-30
Record Last Modified 2019-06-06
Construction Permit Expires 2020-04-17

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-06-05 9527 9668 0
2019-06-05 17531 17672 0
17531 17672 0
9527 9668 0
9527 9668 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/11/2018 09/28/2018 9318 9,932,070.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FIGHTR EC-3 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.570371 538045
SCALECHEK LP-70 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
FDP-S1296-17 Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
OptiKleen-WF(TM) Halliburton Concentrate Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
MC MX 5-2402 Halliburton Biocide Listed Below Listed Below 0 0 0
Citric acid 77-92-9 60 0.0015769 1488
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.00001748 17
Contains no hazardous substances

in concentrations above cut-off values according to the competent authority

CAS Not Assigned 100 0.00215316 2032
Phosphoric acid 7664-38-2 0.1 0.00000035 1
Acrylamide polymer Proprietary 30 0.0198308 18707
Sobitan, mono-9-octadecenoate, (Z) 1338-43-8 5 0.00330514 3118
Modified thiourea polymer Proprietary 30 0.000111894 107
Sodium nitrate 7631-99-4 60 0.0186375 17582
Crystalline silica, quartz 14808-60-7 100 11.6292 10,970,000.0
Ethylene glycol 107-21-1 60 0.0136944 12919
Ethanol 64-17-5 1 0.00000350 4
Telmer Proprietary 10 0.0022824 2154
Hydrotreated light petroleum distillate 64742-47-8 30 0.0198308 18707
Hydroteated light petroleum distillate 64742-47-8 30 0.00773289 7295
Ethoxylated alcohols Proprietary 30 0.00008149 78
Inorganic salt Proprietary 30 0.00773289 7295
Polyoxyalkylene Proprietary 5 0.00330514 3118
Hydrochloric acid 7647-01-0 7.5 0.0374762 35352
Olefins Proprietary 5 0.00003016 30
Fatty acids, tall oil Proprietary 30 0.00007541 72
Acrylamide acrylate polymer Proprietary 30 0.00773289 7295
Methanol 67-56-1 100 0.000272923 259
Acrylic acid 79-10-7 0.01 0.00000228 3
Sodium perborate tetrahydrate 10486-00-7 100 0.0148683 14026
Sodium polyacrylate 9003-04-7 1 0.00022824 216
Glutaraldehyde 111-30-8 30 0.000104898 99
Propargyl alcohol 107-19-7 10 0.00003122 30
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
EXCELERATE PS-2 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
MC MX 8-4543 Halliburton Biocide Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 87.705 82,733,800.0
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-09-28 H2O 8 180419 Gal 237195 Halliburton
2018-09-12 H2O 8 209637 Gal 240800 Halliburton

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 952007 0 54
2019 ASCENT RESOURCES UTICA LLC 1733760 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 13440 54
2019 ASCENT RESOURCES UTICA LLC Brine 5146 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1173490787 2018-7-24 0:00: CS No Violations 4.00
-1228542089 2018-9-18 0:00: CT No Violations 1.00
-1532273116 2018-11-5 0:00: CT No Violations 1.00
-245842133 2018-10-22 0:00 CT No Violations 1.00
-378140209 2018-7-17 0:00: DD No Violations 1.00
-421427055 2018-7-5 0:00:0 DD No Violations 1.00
-660605361 2018-10-2 0:00: CT No Violations 1.00
0098407036 2018-07-11 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 795 air drilling a 12.25 inch diameter hole at a depth of 7560 feet. Company man Russ White says total depth for the section is around 8100 feet and that they should be cementing 9.625 inch diameter casing in the next 2 days. Walk around location revealed no issues with containment.
0103343663 2019-04-25 Preliminary Restoration No Violations On the day of my inspection I witnessed this pad to contain three properly labeled, producing wells. This well is producing through the 5.5 inch diameter casing. This well is producing from each side of the well head. Production equipment includes six sand seperators, three GPUs, three line heaters, gas buster, and two 500 barrel steel tanks, in their own containment. The 13.375x9.625 annular pressure is 275 psi and the 9.625x5.5 annular pressure is 322 psi. Pad slopes are stable and vegetated except for pipeline right of way which is not fully vegetated. Site meets requirements of 1509.072 (A) for preliminary restoration.
0245842133 2018-10-22 Completion Testing No Violations On the day of my inspection I witnessed Deep Well Snub #8 on location. Identified myself to company men Dave Norris and Andy Ingram. They have not started drilling out this well yet. Surface annular pressure is 0 and intermediate annular is 400.
0378140209 2018-07-17 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 795 drilling an 8.5 inch diameter hole at 14273 feet. Drilling with 12.5 ppg oil base mud. Kick off point was 8545 and landing point was 9720. No flare during this inspection. Walk around location revealed no issues with containment.
0421427055 2018-07-05 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed patterson 795 was preparing to spud this well. Company man Russ White believes they will spud this afternoon. Only a conductor has been set and Russ was informed to notifty me of surface casing cement job. Spoke with Russ on morning on 7/6 and the surface cement job will be in the evening if all goes according to plan.
0660605361 2018-10-02 Completion Testing No Violations On the day of my inspection I found this pad to contain three wells that have been stimulated. Halliburton frac crew has moved off of the location leaving behind an above ground storage tank, several frac tanks, and miscellaneous equipment. Surface annular pressure is 400 psi and intermediate annular is 800 psi. Well has not had frac plugs drilled out.
103343663 2019-4-25 0:00: PL No Violations 1.00
1173490787 2018-07-24 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Patterson 795 drilled a 17.5 inch diameter open hole to a depth of 1491 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming casing ran 1495 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot, with a 4 foot stick up. Casing was centralized with 14 centralizers. Shoe track is 45.5 feet long. Schlumberger was onsite with 1276 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 20% excess ran in open hole. Cement displaced with 220 barrels of fresh water. 25 barrels of gel pumped ahead of cement. 25 barrels of cement returned to surface, and floats held with 1 barrel back. Last 5 barrels of returned cement weighed 15 ppg.
1228542089 2018-09-18 Completion Testing No Violations On the day of my inspection I witnessed Halliburton frac crew on location. This well is on stage 18. Stage 18 frac plug is at 14899, bottom perforation at 14888, and top perforation at 14747. Intermediate annualr pressure is 1025 psi. Surface gauge not viewed as there was pressure on the lines for frac. Halliburton is currently pumping on well. Breakdown pressure was 11533 at 25 barrels per minute. They will pump 230000 lbs of sand and approximately 5100 barrels of fluid. Treated with 1000 gallons of 7.5% HCl.
1532273116 2018-11-05 Completion Testing No Violations On the day of my inspection I found this pad to contain three wells that have been stimulated and drilled out. Identified myself to company man Jordie Bernard. They are preparing the wells for flowback and plan to start wednesday. Surface annular pressure gauge valves were not open.
1536770931 2018-09-12 Completion Testing No Violations On the day of my inspection I witnessed a Halliburton Frac crew on location. I identifed myself to company men Dominic Santos and Gerold Reynolds. During my inspection, wireline is running in the wellbore to set frac plug and perforate the casing for stage 3. plug will be set at 17509, bottom perforation will be at 17498, and top perforation will be at 17357. Casing will be perforated with 5 guns with 6 shots on 35 foot spacing. Intermediate annular pressure is 558 psi.
1851263990 2020-6-4 0:00:0 PW No Violations 1.00
2059935144 2018-09-25 Completion Testing No Violations On the day of my inspection I witnessed a Halliburton frac crew on location. This well is on stage 38 and has been perforated. Plug is set at 11419, bottom perforation at 11408, and top perforation at 11267. Surface annular pressure is 400 and intermediate is 740. I identifed myself to company men Dominic Santos. This is the next well to frac.
242538247 2019-10-29 0:00 PW No Violations 1.00
98407036 2018-7-11 0:00: DD No Violations 1.00