If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20765 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.31,"lon":-80.71,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Cross Creek Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001532 | |
Farm/Lease Name: GORDON NW CRC JF | |
License Status: Producing | |
License Date: 2018-07-26 | |
Spud Date: 2018-05-08 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-08-18 | |
Well Total Depth: 25719.00 ft | |
Configuration: Horizontal | |
Latitude: 40.310000 | |
Longitude: -80.710000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-04-27 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/27/2018, Expired Date:4/27/2019, Drilling unit acres:86.93, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2018-07-26 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:7/26/2018, Expired Date:7/26/2019, Drilling unit acres:388.855, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-08-18 | |
Correction to Well | 2018-12-21 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2019-05-30 | |
Record Last Modified | 2019-06-06 | |
Construction Permit Expires | 2019-07-26 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2019-06-05 | 10057 | 10198 | 0 |
2019-06-05 | 24453 | 25553 | 0 |
24453 | 25553 | 0 | |
10057 | 10198 | 0 | |
10057 | 10198 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/25/2018 | 11/26/2018 | 9580 | 18,174,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 |
Sodium persulfate | 7775-27-1 | 100 | 0.00000485 | 9 | ||||
pH Buffer | 8055-55-8 | 15 | 0.00001605 | 29 | ||||
Sodium nitrate | 7631-99-4 | 60 | 0.0150317 | 26635 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000000 | 1 | ||||
Ethoxylated alcohols | Proprietary | 5 | 0.00004505 | 80 | ||||
Phosphate of a Diamine, Sodium Salt | Proprietary | 30 | 0.0062806 | 11129 | ||||
Polymer Blend | Proprietary | 68 | 0.00007277 | 129 | ||||
Methanol | 67-56-1 | 100 | 0.00718169 | 12726 | ||||
Sodium chloride | 7647-14-5 | 30 | 0.0152346 | 26995 | ||||
Emulsifier | 9002-92-0 | 10 | 0.00001070 | 19 | ||||
Citric acid | 77-92-9 | 60 | 0.00390016 | 6911 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0152346 | 26995 | ||||
9-Octadecenamide,n,n-bi-2(hydroxy-ethyl)-,(Z) | 93-83-4 | 5 | 0.0025391 | 4500 | ||||
Propargyl alcohol | 107-19-7 | 5 | 0.00004505 | 80 | ||||
Hydrochloric acid | 7647-01-0 | 7.5 | 0.0921339 | 163254 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 11.3014 | 20,025,200.0 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.0025391 | 4500 | ||||
Ammonium chloride | 12125-02-9 | 5 | 0.0025391 | 4500 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.000270329 | 480 | ||||
Contains no hazardous substances
in concentrations above cut-off values according to the competent authority |
CAS Not Assigned | 100 | 0.00174074 | 3085 | ||||
SAND-COMMON WHITE - 100 MESH, 3307 LB BAG | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Produced Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 25.8629 | 45,827,100.0 | |
FDP-S1296-17 | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 61.5012 | 108,975,000.0 | |
MC MX 5-2402 | MultiChem | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
MC MX 8-4543 | MultiChem | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
SP BREAKER | Halliburton | Breaker | Listed Below | Listed Below | 0 | 0 | 0 | |
GEL 1100 | Mountain Supply & Services | Gelling Agent | Listed Below | Listed Below | 0 | 0 | 0 | |
LD-2850 | MultiChem | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
SCALECHEK LP-50 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 1.24491 | 2,205,890.0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-11-23 | H2O | 15 | 189738 Gal | 0 | Halliburton | |
2018-10-25 | H2O | 15 | 151885 Gal | 81420 | Halliburton |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | 2264450 | 0 | 79 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | Brine | 10978 | 79 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1049292945 | 2019-6-18 0:00: | UL | No Violations | 1.00 |
-1298822902 | 2018-5-10 0:00: | CS | No Violations | 3.00 |
-1417928383 | 2018-12-26 0:00 | CT | No Violations | 1.00 |
-1495004603 | 2018-11-15 0:00 | CT | No Violations | 1.00 |
-1545344037 | 2020-1-29 0:00: | UP | No Violations | 1.00 |
-216878043 | 2018-10-4 0:00: | CT | No Violations | 1.00 |
-319402610 | 2018-12-18 0:00 | CT | No Violations | 1.00 |
-512973526 | 2018-10-22 0:00 | CT | No Violations | 1.00 |
-745348966 | 2018-7-24 0:00: | CS | No Violations | 4.00 |
0216878043 | 2018-10-04 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location. I identified myself to company man Lewis. This well and the 3H are not currently tied into. They are in process of stimulating a the 2H and I was unable to view annular pressures. |
0319402610 | 2018-12-18 | Completion Testing | No Violations | On the day of my inspection I witnessed Hybrid R252 on location drilling out frac plugs. The rig has not drill the plugs out of this well yet. This will be the final well to drill out and they anticipate starting tomorrow. Surface annular pressure gauge reads 0 and intermediate annular gauge reads 600. Production equipment includes five GPUs, five line heaters, 2two sand traps, and two 500 barrel steel tanks in their own polymer lined steel containment. |
0512973526 | 2018-10-22 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location tied into the 2h, 4h, and 6h wells. This well and the 3h are not tied into. Identified myself to Company men Chris Nunez and Justin. Surface annular pressure is 0 and intermediate is 300. |
0595174635 | 2018-07-31 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 584 had reached total depth of 8763 on the 12.25 inch diameter section. Wyoming Casing was running 9.625 inch diameter casing, 40#/ft, L-80. DV tool set at 4490 feet. Shoe will be set at 8753 feet. Hole has a 15 degree tangent. Company man Josh said the well made 25-30 barrels of water from the Salina to total depth. Schlumberger is not on location yet but they will be the cement contractor. |
0745348966 | 2018-07-24 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Patterson 584 drilled a 17.5 inch diameter open hole to a depth of 1384 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming casing ran 1387 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot, with a 3 foot stick up. Casing was centralized with 12 centralizers. Shoe track is 45.25 feet long. Schlumberger was onsite with 1474 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% excess ran in open hole. Cement displaced with 203 barrels of fresh water. 25 barrels of gel and 10 barrels of water pumped ahead of cement. 80 barrels of cement returned to surface, and floats held with 1 barrel back. Last 5 barrels of returned cement weighed 15.6 ppg. |
1090395109 | 2019-9-11 0:00: | PW | No Violations | 1.00 |
1286035575 | 2018-08-08 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 584 drilling an 8.5 inch diameter at a depth of 20951 feet. ID to Company man Tommy Bell. Planned total depth for the well is 25700 feet. No issues noted during my inspection. |
1298822902 | 2018-05-10 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Precision add 17 yards of 9 sack grout to the back side of the casing to get cement to surface. Only one truck hauling cement (round tripping) for all three top out jobs. |
1417928383 | 2018-12-26 | Completion Testing | No Violations | On the day of my inspection I witnessed Hybrid Drilling R252 on location drilling out frack plugs. Rig is currently drilling out plug 25/90. Company man Joe Watt believes they will be moving off of location Friday. Surface and annular gauges read 0 with valves to gauges closed. |
1430081250 | 2018-08-14 | Urban Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 584 was circulating the hole. They reached total depth of 25719 feet. ID to company man Tommy Bell. Plan to run 5.5 inch diameter production casing tomorrow and cement it Thursday. |
1495004603 | 2018-11-15 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location. Stage 59/86 has plug set at 15459, with bottom perforation at 15448 and top perforation at 15307. Surface annular pressure is 0 and intermediate annular pressure is 519. |
2017950494 | 2018-05-09 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Precision had augured a 36 inch diameter hole to 100 feet. 100 feet of 30 inch diameter conductor casing was run. CJs was onsite with 365 sacks of class A cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50 percent excess ran. Mix water tested 70 degrees Fahrenheit, pH of 7 and 39 ppm chlorides. Cement was displaced with 75 barrels of fresh water. No cement returned to surface. Cement tagged at 42 feet with 15 feet of water on top. CJ ran 40 feet of 1 inch diameter tubing and pumped another 200 sacks. Water displaced out of hole into unconsolidated material. Cement tagged at 31 feet. Casing will be grouted to surface tomorrow morning. Drillers hit water at 30 feet below surface and unmined rock at 40 feet. |
2096567947 | 2018-11-05 | Completion Testing | No Violations | On the day of my inspection I found this pad to contain five wells. Identified myself to company man Chuck Davies. They are preparing to fish for spent guns and wireline tools with a slick line. Fish is at 2200 feet. Stage 26/89 has plug set at 21235. Bottom perforation is at 21223 and top perforation is at 21082. Surface annular pressure was 0 and intermediate annular was 750. This stage has not been stimulated. |
595174635 | 2018-7-31 0:00: | DD | No Violations | 1.00 |
For data sources see[10]