If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20767 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.31,"lon":-80.71,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Cross Creek Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001532 | |
Farm/Lease Name: GORDON N CRC JF | |
License Status: Producing | |
License Date: 2018-07-26 | |
Spud Date: 2018-05-11 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-09-09 | |
Well Total Depth: 25068.00 ft | |
Configuration: Horizontal | |
Latitude: 40.310000 | |
Longitude: -80.710000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-04-27 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/27/2018, Expired Date:4/27/2019, Drilling unit acres:86.93, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2018-07-26 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:7/26/2018, Expired Date:7/26/2019, Drilling unit acres:389.689, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-09-09 | |
Correction to Well | 2018-12-21 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2019-05-30 | |
Record Last Modified | 2019-06-06 | |
Construction Permit Expires | 2019-07-26 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2019-06-05 | 9892 | 10033 | 0 |
2019-06-05 | 24763 | 24862 | 0 |
24763 | 24862 | 0 | |
9892 | 10033 | 0 | |
9892 | 10033 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/25/2018 | 11/21/2018 | 9470 | 24,404,900.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
GEL 1100 | Mountain Supply & Services | Gelling Agent | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 75.2426 | 178,402,000.0 | |
LD-2850 | MultiChem | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
Contains no hazardous substances
in concentrations above cut-off values according to the competent authority |
CAS Not Assigned | 100 | 0.00178095 | 4223 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.000195682 | 464 | ||||
Citric acid | 77-92-9 | 60 | 0.00281796 | 6682 | ||||
Sodium persulfate | 7775-27-1 | 100 | 0.00000215 | 6 | ||||
Sodium chloride | 7647-14-5 | 30 | 0.0165881 | 39331 | ||||
Emulsifier | 9002-92-0 | 10 | 0.00000765 | 19 | ||||
Hydrochloric acid | 7647-01-0 | 7.5 | 0.06694 | 158716 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0165881 | 39331 | ||||
Polymer Blend | Proprietary | 68 | 0.00005202 | 124 | ||||
9-Octadecenamide,n,n-bis-2(hydroxy-ethyl)-,(Z) | 93-83-4 | 5 | 0.00276469 | 6556 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00276469 | 6556 | ||||
Propargyl alcohol | 107-19-7 | 5 | 0.00003261 | 78 | ||||
Ammonium chloride | 12125-02-9 | 5 | 0.00276469 | 6556 | ||||
Methanol | 67-56-1 | 100 | 0.00713606 | 16921 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 12.413 | 29,431,600.0 | ||||
pH Buffer | 8055-55-8 | 15 | 0.00001147 | 28 | ||||
Ethoxylated alcohols | Proprietary | 5 | 0.00003261 | 78 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000000 | 1 | ||||
Sodium nitrate | 7631-99-4 | 60 | 0.0153791 | 36465 | ||||
Phosphate of a Diamine, Sodium Salt | Proprietary | 30 | 0.00648379 | 15374 | ||||
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Produced Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 11.3421 | 26,892,300.0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.908317 | 2,153,640.0 | |
MC MX 8-4543 | MultiChem | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
SP BREAKER | Halliburton | Breaker | Listed Below | Listed Below | 0 | 0 | 0 | |
MC MX 5-2402 | MultiChem | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
SCALECHEK LP-50 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FDP-S1296-17 | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-11-21 | H2O | 7 | 255686 Gal | 346370 | Halliburton | |
2018-10-25 | H2O | 7 | 197297 Gal | 80180 | Halliburton | |
2018-11-15 | H2O | 0 | 6133 Bbl | 343600 | Halliburton | On the day of my inspection I witnessed a Halliburton frac crew on location. Stage 64/89 has plug set at 13894, with bottom perforation at 13883 and top perforation at 13742. 2500 gallons of 7.5% Hcl was pumped along with 6133 barrels of water. Total sand pumped was 343600 lbs. 79140 lbs of 100 mesh and 264460 lbs of 40/70 mesh. Break down pressure was 9686 at 30 barrels per minute (BPM). Maximum pressure was 11730 and average pressure was 10569. Maximum rate was 85 bpm and average rate was 81 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | 2725229 | 0 | 79 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | Brine | 18751 | 79 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1127765285 | 2018-10-4 0:00: | CT | No Violations | 1.00 |
-1475848037 | 2019-9-11 0:00: | PW | No Violations | 1.00 |
-2104183512 | 2018-8-28 0:00: | DD | No Violations | 1.00 |
-711915765 | 2018-8-20 0:00: | CS | No Violations | 4.00 |
-761301144 | 2018-10-22 0:00 | CT | No Violations | 1.00 |
0128238738 | 2018-09-12 | Urban Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 584 reached total depth of 25068. Identified myself to company man Josh Delso. The rig pulled 7 joints of drill pipe. The first 2 came up easily and the next 5 were progressively harder until the rig was at max pull. They stopped and plan on circulating at least 2 bottoms up before trying again. Mud weight is 14.9 ppg. There is a small flare burning during my inspection. |
0462650656 | 2018-09-17 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the production casing cement job. Patterson 584 drilled an 8.5 inch diameter open hole to a depth of 25068 feet. Previous casing set and cemented was 9.625 inch diameter intermediate casing to a depth of 8677 feet. Wyoming casing ran 25058 feet of 5.5 inch diameter casing, 23 lbs/foot. Shoe track is 48 feet long. Schlumberger was onsite with 4770 sacks of class H cement. Cement weighed with mudscale at 15.8 ppg and yield of 1.07. 10% excess ran in open hole. Cement displaced with 530 barrels of water. 75 barrels of mudpush at 15.4 ppg pumped ahead of cement. No cement returned to surface, and floats held with 1.5 barrels back. Estimated top of cement is 3430. Estimated top of spacer is 1815. Mud weight is 15 ppg. |
0711915765 | 2018-08-20 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Patterson 584 drilled a 17.5 inch diameter open hole to a depth of 1390 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming Casing ran 1394 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot. Casing was centralized with 12 centralizers. Shoe track is 43 feet long. Schlumberger was onsite with 1472 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 40% excess ran in open hole. Cement displaced with 205 barrels of fresh water. 25 barrels of gel and 10 barrels of water pumped ahead of cement. 75 barrels of cement returned to surface, and floats held with 1 barrel back. Return cement weighed 15.5 ppg with 25 barrels of displacement left. |
0761301144 | 2018-10-22 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location tied into the 2h, 4h, and 6h wells. This well and the 1h are not tied into. Identified myself to Company men Chris Nunez and Justin. Surface annular pressure is 650 and intermediate is 0. |
1127765285 | 2018-10-04 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location. I identified myself to company man Lewis. This well and the 1H are not currently tied into. They are in process of stimulating a the 2H and I was unable to view annular pressures. |
1187471157 | 2019-6-18 0:00: | UL | No Violations | 1.00 |
1226681265 | 2018-11-05 | Completion Testing | No Violations | On the day of my inspection I found this pad to contain five wells. Identified myself to company man Chuck Davies. Halliburton frac crew is on location. Stage 32/86 has plug set at 19494. Bottom perforation is at 19482 and top perforation is at 19342. Surface annular pressure was 620 and intermediate annular was 250. This stage has not been stimulated. |
128238738 | 2018-9-12 0:00: | UD | No Violations | 1.00 |
1343340929 | 2020-1-29 0:00: | UP | No Violations | 1.00 |
1428933975 | 2018-12-26 | Completion Testing | No Violations | On the day of my inspection I witnessed Hybrid Drilling R252 on location drilling out frack plugs. Plugs have all been drilled out on this well and is awaiting flow back operations. Surface and annular gauges read 0 with valves to gauges closed. |
1552574060 | 2018-12-18 | Completion Testing | No Violations | On the day of my inspection I witnessed Hybrid R252 on location drilling out frac plugs. The rig has drilled the plugs out of this well and is currently tripping out. I did not read the gauges as they were tripping pipe. Production equipment includes 5 GPUs, 5 line heaters, 2 sand traps, and 2 500 barrel steel tanks in their own containment. |
1814916603 | 2018-11-15 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location. Stage 64/89 has plug set at 13894, with bottom perforation at 13883 and top perforation at 13742. 2500 gallons of 7.5% Hcl was pumped along with 6133 barrels of water. Total sand pumped was 343600 lbs. 79140 lbs of 100 mesh and 264460 lbs of 40/70 mesh. Break down pressure was 9686 at 30 barrels per minute (BPM). Maximum pressure was 11730 and average pressure was 10569. Maximum rate was 85 bpm and average rate was 81 bpm. Initial shut in pressure (ISIP) was 6091 and 5 minute ISIP was 6300. Surface annular pressure is 0 and intermediate annular pressure is 599. |
2104183512 | 2018-08-28 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 584 tripping into the well to start drilling the curve. 9.625 inch diameter casing was cemented yesterday at 8677 feet. Company man Josh Delso said 30 barrels of cement returned to surface on first stage and 78 barrels of cement returned to surface on second stage. DV tool at 4497. |
462650656 | 2018-9-17 0:00: | CS | No Violations | 5.00 |
For data sources see[10]