If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20787 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.31,"lon":-80.8,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Wayne Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001576 | |
Farm/Lease Name: GRISWOLD SW WYN JF | |
License Status: Producing | |
License Date: 2019-01-18 | |
Spud Date: 2018-10-01 | |
Spud Drilling Contractor: | |
Final Drill Date: 2019-03-19 | |
Well Total Depth: 25772.00 ft | |
Configuration: Horizontal | |
Latitude: 40.310000 | |
Longitude: -80.800000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-09-28 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:9/28/2018, Expired Date:9/27/2020 12:00:00 PM, Drilling unit acres:122.212, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2019-01-18 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:1/18/2019, Expired Date:1/17/2021 12:00:00 PM, Drilling unit acres:419.47, Proposed Well Type:OG, Proposed Well Class:POOL |
Record Last Modified | 2019-01-25 | |
Construction Permit Expires | 2021-01-17 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
9807 | 25608 | 0 | |
9807 | 25608 | 0 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1107267537 | 2019-4-22 0:00: | CT | No Violations | 1.00 |
-2106368143 | 2019-5-15 0:00: | CT | No Violations | 1.00 |
-657948615 | 2018-10-2 0:00: | CS | No Violations | 2.00 |
0657948615 | 2018-10-02 | Casing String Witnessed | No Violations | PAD ADDRESS: 1646 CR 23 Bloomingdale. On the day of my inspection I witnessed Precision Rathole had augured a 36 inch diameter hole to feet. 100 feet of 30 inch diameter conductor casing was run. CJ/Otex was onsite with 315 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.19. 50 percent excess ran. Mix water tested 68 degrees Fahrenheit, pH of 6.5 and 31 ppm chlorides. Cement was displaced with 72 barrels of fresh water. 3 barrels of cement returned to surface. |
1107267537 | 2019-04-22 | Completion Testing | No Violations | On the day of my inspection I witnessed FTS frac crew on location. They are tied into the 2h and 4h wells. They have not pumped a stage on this pad yet. They are currently finishing up with containment. Toe sleeves on this well are open and surface iron pressure tested to 12500 psi. There is an above ground storage tank for fresh water and twelve 350 barrel steel tanks for produced water, in their own containment. |
159400693 | 2019-8-15 0:00: | PL | No Violations | 1.00 |
1898672902 | 2019-04-10 | Completion Testing | No Violations | On the day of my inspection I witnessed this location is being prepped for frac. There is a disassembled aboveground storage tank onsite and several frac tanks. All wells on location have frac stacks on. 13.375x 9.625 annular pressure is zero and 9.625 x 5.5 annular pressure is 600 psi. |
2020441050 | 2019-05-02 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS crew on location. They are tied into this well and the 4H well. Stage 41 is the next stage set for frac on this pad. They are currently doing an injection test on the 4H well. Stage 41 plug set at 18709, with bottom perforation at 18698 and top perforation at 18557. The 13.375x9.625 annular pressure was not viewed and the 9.625x5.5 annular pressure is 750 psi. |
2106368143 | 2019-05-15 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS frac crew is on location tied into the 6H and 8H wells. This well has been fracked and has 2 kill plugs set in it. Kill plugs are at 9450 and 9270. The 13.375x9.625 annular pressure is zero and the 9.625x5.5 annular pressure is 600 psi. |
2116463592 | 2019-05-21 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS frac crew on location. They are currently tied into the 6H and 8H wells. Frac has been completed on this well. 9.625x5.5 annular pressure is 1100 psi. |
363110879 | 2019-6-19 0:00: | CT | No Violations | 1.00 |
671053570 | 2019-6-10 0:00: | CT | No Violations | 1.00 |
For data sources see[4]