If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20800 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.27,"lon":-80.79,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Smithfield Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001599 | |
Farm/Lease Name: BUDDY SMF JF | |
License Status: Producing | |
License Date: 2018-12-28 | |
Spud Date: 2019-01-12 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2019-02-26 | |
Well Total Depth: 23014.00 ft | |
Configuration: Horizontal | |
Latitude: 40.270000 | |
Longitude: -80.790000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-12-28 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:12/28/2018, Expired Date:12/27/2020 12:00:00 PM, Drilling unit acres:634.878, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2019-01-11 | CORRECTION TO CASING PLAN PER OWNER REQUEST. |
Reached Total Depth | 2019-02-26 | |
Correction to Well | 2019-05-16 | UPDATE PER AS-DRILLED PLAT (PROPOSED PERFORATIONS) |
Record Last Modified | 2019-05-24 | |
Construction Permit Expires | 2020-12-27 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
10067 | 22892 | 0 | |
10067 | 22892 | 0 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1247400776 | 2019-5-7 0:00:0 | CT | No Violations | 1.00 |
-1353614362 | 2019-1-29 0:00: | CS | No Violations | 1.00 |
-142089087 | 2019-6-4 0:00:0 | CT | No Violations | 1.00 |
-333886475 | 2019-1-13 0:00: | CS | No Violations | 2.00 |
-83005527 | 2019-8-13 0:00: | PL | No Violations | 1.00 |
0142089087 | 2019-06-04 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS frac crew on location tied into the Buddy 5H and 7H and Omaits 1H and 3H wells. Stage 61/74 has been perforated and is awaiting frac. Stage 61 plug set at 12494 feet, with bottom perforation at 12482 feet and top perforation at 12342 feet. The 13.375x9.625 annular pressure was not viewed and the 9.625x5.5 annular pressure is 285 psi. |
0333886475 | 2019-01-13 | Casing String Witnessed | No Violations | PAD ADDRESS: 81 CR 10, dillonvale. On the day of my inspection I witnessed Precision rathole had augured a 30 inch diameter hole to 100 feet. 101 feet of 24 inch diameter conductor casing was run. Drillers said hole was basically dry. Petroset was onsite with 250 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. 50 percent excess ran. Cement was displaced to 90 feet with 47 barrels of fresh water. 12 barrels of cement returned to surface. 10 feet of cement left in the casing. |
1247400776 | 2019-05-07 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS frac crew on location. They are tied into Omaits 1H, 3H, and Buddy 5H, 7H wells. FTS is pumping stage 9/74. Stage 9 plug set at 21594 feet, with bottom perforation at 21582 feet and top perforation at 21443 feet. FTS pumped 48 barrels of 7.5% HCl, 3972 barrels of clean fluid, 40660 lbs of 100 mesh sand, 189940 lbs of 40/70 mesh sand, and 963 barrels of produced water. Total sand pumped was 230600 lbs. Maximum treating pressure was 11497 psi and average treating pressure was 11162 psi. Maximum rate was 78 barrels per minute (BPM) and average rate was 76 bpm. Break down pressure was 8336 psi. Initial shut in pressure (ISIP) was 6487 psi and 5 minute ISIP was 6020 psi. Frac gradient of 1.12 psi/ft. The 13.375x9.625 annular pressure was not viewed and the 9.625x5.5 annular pressure is 260 psi. |
1353614362 | 2019-01-29 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the mine string cement job. Falcon 26 drilled a 22 inch diameter open hole to a depth of 270 feet. Previous casing set and cemented was 24 inch diameter conductor casing to a depth of 100 feet. Wyoming casing ran 270 feet of 18.625 inch diameter casing, j-55, 87.5 lbs/foot, with 2 foot stick up. Shoe track is 24.5 feet long. Cement Baskets were set at 185 feet. Void encountered at 210-220 feet. CJ/Otex was onsite with 250 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% excess ran in open hole. Cement displaced with 75 barrels of fresh water. 35 barrels of gel pumped ahead of cement. Top out was completed with 200 sacks of class A cement. KB is 12 feet. All depths are from KB except conductor. |
1580244672 | 2020-1-28 0:00: | PL | No Violations | 1.00 |
1626070403 | 2019-05-15 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS frac crew is on location tied into the Buddy 5H and 7H and Omaits 1H and 3H wells. Stage 18/74 plug set at 20019 feet, with bottom perforation at 20008 feet and top perforation at 19868 feet. This is the next stage on pad to frac. The 13.375x9.625 annular pressure was not viewed and the 9.625x5.5 annular pressure is 530 psi. |
1864171742 | 2019-6-27 0:00: | CT | No Violations | 1.00 |
1946293334 | 2019-05-21 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS frac crew on location. They are currently tied into the Omaits 1H and 3H, and the Buddy 5H and 7H wells. They are pumping down wireline on stage 30/74. Stage 30 plug to be set at 17919, with bottom perforation at 17908 and top perforation at 17767. 9.625x5.5 annular pressure is 415 psi. |
885807220 | 2020-1-28 0:00: | PW | No Violations | 1.00 |
For data sources see[4]