If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20802 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.27,"lon":-80.79,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Smithfield Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001599 | |
Farm/Lease Name: OMAITS SMF JF | |
License Status: Producing | |
License Date: 2019-03-08 | |
Spud Date: 2019-01-10 | |
Spud Drilling Contractor: | |
Final Drill Date: 2019-04-19 | |
Well Total Depth: 20371.00 ft | |
Configuration: Horizontal | |
Latitude: 40.270000 | |
Longitude: -80.790000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2019-01-02 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:1/2/2019, Expired Date:1/1/2021 12:00:00 PM, Drilling unit acres:575.89, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2019-01-11 | CORRECTION TO CASNG PLAN PER OWNER REQUEST. |
APP | 2019-03-08 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/8/2019, Expired Date:3/7/2021 12:00:00 PM, Drilling unit acres:774.397, Proposed Well Type:OG, Proposed Well Class:POOL |
Record Last Modified | 2019-03-15 | |
Construction Permit Expires | 2021-03-07 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
9771 | 20262 | 0 | |
9771 | 20262 | 0 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1057801524 | 2020-1-28 0:00: | PL | No Violations | 1.00 |
-1839130685 | 2019-8-13 0:00: | PL | No Violations | 1.00 |
-541807767 | 2019-5-15 0:00: | CT | No Violations | 1.00 |
-603237867 | 2019-4-9 0:00:0 | DD | No Violations | 1.00 |
0416634948 | 2019-05-07 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS frac crew on location. They are tied into Omaits 1H, 3H, and Buddy 5H, 7H wells. Stage 8/61 on this well is beginning frac. Stage 8 plug set at 19145, with bottom perforation at 19133 and top perforation at 18994. The 13.375x9.625 annular pressure was not viewed and the 9.625x5.5 annular pressure is 705 psi. |
0541807767 | 2019-05-15 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS frac crew is on location tied into the Buddy 5H and 7H and Omaits 1H and 3H wells. Stage 17/64 plug set at 17579 feet, with bottom perforation at 17568 feet and top perforation at 17428 feet. This stage is awaiting frac. The 13.375x9.625 annular pressure was not viewed and the 9.625x5.5 annular pressure is 940 psi. |
0572893812 | 2019-05-21 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS frac crew on location. They are currently tied into the Omaits 1H and 3H, and the Buddy 5H and 7H wells. Stage 29/61 is awaiting wireline. Stage 29 plug to be set at 15491, with bottom perforation at 15480 and top perforation at 15339. 9.625x5.5 annular pressure is 950 psi. |
0603237867 | 2019-04-09 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 577 waiting to drill out a kick off plug. Rig drilled a 12.25 inch diameter hole to 8740 and upon tripping out of the hole they found that a part of the drilling motor had twisted off in the hole. Fish is 37 feet long and consists of a rotor, drive line and a bent housing. No MWD tools were left in hole. 9.625 inch diameter casing was set at 8507 feet. They have cemented from fish back up into the casing and plan to drill around the fish. |
0855786135 | 2019-06-04 | Completion Testing | No Violations | On the day of my inspection I witnessed a FTS frac crew on location tied into the Buddy 5H and 7H and Omaits 1H and 3H wells. Wireline just finished up perforating stage 60/61. Stage 60 plug set at 10097 feet, with bottom perforation at 10086 feet and top perforation at 9945 feet. The 13.375x9.625 annular pressure was not viewed and the 9.625x5.5 annular pressure is 442 psi. |
1375221019 | 2020-1-28 0:00: | PW | No Violations | 1.00 |
1392740924 | 2019-6-27 0:00: | CT | No Violations | 1.00 |
1547394607 | 2019-01-13 | Casing String Witnessed | No Violations | PAD ADDRESS: 81 CR 10, dillonvale. Precision rathole had augured a 30 inch diameter hole to 100 feet. 103 feet of 24 inch diameter conductor casing was run. Drillers said hole was basically dry. Petroset was onsite with 250 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. 50 percent excess ran. Cement was displaced to 90 feet with 48.5 barrels of fresh water. 14 barrels of cement returned to surface and then fell back. 10 feet of cement left in the casing. This was set on 1/11 and not witnessed. On the day of my inspection I witnessed Petroset pump 48 sacks of class A cement to top out. |
416634948 | 2019-5-7 0:00:0 | CT | No Violations | 1.00 |
572893812 | 2019-5-21 0:00: | CT | No Violations | 1.00 |
855786135 | 2019-6-4 0:00:0 | CT | No Violations | 1.00 |
For data sources see[4]