If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-21905 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.45,"lon":-82.47,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Morris Township | |
| Operator Name: MARAM ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: HILL FREDERICK | |
| License Status: Final Restoration | |
| License Date: 2009-11-16 | |
| Spud Date: 1967-07-06 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 1967-07-12 | |
| Well Total Depth: 2511.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.450000 | |
| Longitude: -82.470000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1967-07-06 | 188 WHITE J P GeoDate 7/6/67 |
| Original Spud | 1967-07-06 | |
| Completed | 1967-07-12 | |
| Reached Total Depth | 1967-07-12 | |
| CO | 1993-11-29 | 476 MARAM ENERGY CO GeoDate 7/6/67 |
| APP | 2009-11-16 | Proposed Formations:CLINTON, Issued Date:11/16/2009, Expired Date:11/16/2010 6:00:00 AM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class: |
| Plugged/Abandoned | 2009-12-16 | |
| Construction Permit Expires | 2010-11-16 | |
| Record Last Modified | 2013-05-10 |
For data sources see[2]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 500 Bbl | 10000 | R.P. 24 HRS. |
For data sources see[3]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | WHITE J P | 2738.00 | 0.00 | 0 |
| 1986 | WHITE J P | 1348.00 | 0.00 | 365 |
| 1987 | WHITE J P | 1010.00 | 0.00 | 365 |
| 1988 | WHITE J P | 751.00 | 0.00 | 365 |
| 1989 | WHITE J P | 2052.00 | 0.00 | 365 |
| 1990 | MARAM ENERGY INC | 682.00 | 0.00 | 365 |
| 1991 | MARAM ENERGY INC | 17.00 | 0.00 | 365 |
| 1992 | MARAM ENERGY INC | 3141.00 | 0.00 | 365 |
| 1993 | MARAM ENERGY INC | 4578.00 | 0.00 | 365 |
| 1994 | MARAM ENERGY INC | 3106.00 | 0.00 | 365 |
| 1995 | MARAM ENERGY INC | 2016.00 | 0.00 | 365 |
| 1996 | MARAM ENERGY INC | 1318.00 | 0.00 | 365 |
| 1997 | MARAM ENERGY INC | 1191.00 | 0.00 | 365 |
| 1998 | MARAM ENERGY INC | 3907.00 | 0.00 | 365 |
| 1999 | MARAM ENERGY INC | 2621.00 | 0.00 | 365 |
| 2000 | MARAM ENERGY INC | 2076.00 | 0.00 | 365 |
| 2001 | MARAM ENERGY INC | 1885.00 | 0.00 | 365 |
| 2002 | MARAM ENERGY INC | 1331.00 | 0.00 | 260 |
| 2003 | MARAM ENERGY INC | 1273.00 | 0.00 | 100 |
| 2004 | MARAM ENERGY INC | 1725.00 | 0.00 | 180 |
| 2005 | MARAM ENERGY INC | 1562.00 | 0.00 | 365 |
| 2006 | MARAM ENERGY INC | 0.00 | 0.00 | 30 |
| 2007 | MARAM ENERGY INC | 0.00 | 0.00 | 30 |
| 2008 | MARAM ENERGY INC | 0.00 | 0.00 | 365 |
| 2009 | MARAM ENERGY INC | 0.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | WHITE J P | Brine | 0 | 0 |
| 1986 | WHITE J P | Brine | 0 | 365 |
| 1987 | WHITE J P | Brine | 0 | 365 |
| 1988 | WHITE J P | Brine | 0 | 365 |
| 1989 | WHITE J P | Brine | 0 | 365 |
| 1990 | MARAM ENERGY INC | Brine | 0 | 365 |
| 1991 | MARAM ENERGY INC | Brine | 0 | 365 |
| 1992 | MARAM ENERGY INC | Brine | 0 | 365 |
| 1993 | MARAM ENERGY INC | Brine | 85 | 365 |
| 1994 | MARAM ENERGY INC | Brine | 50 | 365 |
| 1995 | MARAM ENERGY INC | Brine | 0 | 365 |
| 1996 | MARAM ENERGY INC | Brine | 0 | 365 |
| 1997 | MARAM ENERGY INC | Brine | 0 | 365 |
| 1998 | MARAM ENERGY INC | Brine | 130 | 365 |
| 1999 | MARAM ENERGY INC | Brine | 50 | 365 |
| 2000 | MARAM ENERGY INC | Brine | 50 | 365 |
| 2001 | MARAM ENERGY INC | Brine | 0 | 365 |
| 2002 | MARAM ENERGY INC | Brine | 50 | 260 |
| 2003 | MARAM ENERGY INC | Brine | 0 | 100 |
| 2004 | MARAM ENERGY INC | Brine | 80 | 180 |
| 2005 | MARAM ENERGY INC | Brine | 190 | 365 |
| 2006 | MARAM ENERGY INC | Brine | 0 | 30 |
| 2007 | MARAM ENERGY INC | Brine | 0 | 30 |
| 2008 | MARAM ENERGY INC | Brine | 0 | 365 |
| 2009 | MARAM ENERGY INC | Brine | 1160 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -2119255533 | 2009-12-16 0:00 | PB | No Violations | |
| 0289475075 | 2009-12-10 | Plug / Plug Back | No Violations | I witnessed plugging operations today. |
| 0690844808 | 2009-12-09 | Plug / Plug Back | No Violations | I witnessed plugging operations today. The 30 sack bottom hole plug was set through 1.5 inch tubing. This plug circulated. |
| 0748930904 | 2009-12-15 | Plug / Plug Back | No Violations | I witnessed plugging operations today. |
| 1260370804 | 2009-12-09 | Plug / Plug Back | No Violations | Max is on location with Maram Energy. Bob and Jerry are on location with Cemenco. The parmaco packer is set at 2208 and is unable to be pulled. 1 1/2 tubing was run inside the tubing to 2490 feet to set 30 sacks of cement for the bottom hole plug. This plug circulated. The 2/38 inch tubing is scheduled to be shot off tomorrow. |
| 1367175948 | 2013-04-25 | Final Restoration | No Violations | There is a hay field and vegetation is well established. |
| 2053252426 | 2009-12-12 | Administrative Inspection | No Violations | Max with Maram Energy called today concerning the plug job on this well. He is chasing an obstruction downhole through the 2 inch tubing. I advised that in order to get a good Big Lime plug the tubing and production casing needs to be shot off at least at 1700 feet. He has opened it up to 1620 feet so far. He will keep me informed on his progress. |
| 2119255533 | 2009-12-16 | Plug / Plug Back | No Violations | I witnessed plugging operations today. |
| 289475075 | 2009-12-10 0:00 | PB | No Violations | |
| 690844808 | 2009-12-9 0:00: | PB | No Violations | |
| 748930904 | 2009-12-15 0:00 | PB | No Violations |
For data sources see[8]