If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-23253 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.37,"lon":-82.24,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Butler Township | |
| Operator Name: MARAM ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: FRY PERRY & ELIZABETH | |
| License Status: Producing | |
| License Date: 1982-12-10 | |
| Spud Date: 1983-01-18 | |
| Spud Drilling Contractor: B & J DRLG | |
| Final Drill Date: 1983-01-25 | |
| Well Total Depth: 2797.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.370000 | |
| Longitude: -82.240000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1982-12-10 | Issued Date 12/10/82 Expired Date 6/8/83 Acres 0020000 Tool Type CT Proposed Formation CLINTON Proposed Depth 02797 Proposed Drill Depth 02797 |
| Original Spud | 1983-01-14 | FDT=GRAY |
| Completed | 1983-01-25 | FDT=GRAY |
| Reached Total Depth | 1983-01-25 | FDT=GRAY |
| CO | 1983-02-09 | 476 MARAM ENERGY CO GeoDate 12/10/82 |
| Completion Report Received | 1983-04-08 | FDT=GRAY |
| Construction Permit Expires | 1983-06-08 | FDT=GRAY |
| Record Last Modified | 2017-02-15 | FDT=GRAY |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 2722 | 2775 | 0 |
| 2722 | 2775 | 0 | |
| 2006-09-11 | 2729 | 2772 | 24 |
| 2729 | 2772 | 24 | |
| 2722 | 2775 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 1770 Bbl | 20000 | FRAC: 1770 BBL H2O, 20M SAND |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | B & J DRILLING CO | 2885.00 | 1846.00 | 0 |
| 1985 | B & J DRILLING CO | 2107.00 | 1045.00 | 0 |
| 1986 | B & J DRILLING CO | 1024.00 | 697.00 | 365 |
| 1987 | MARAM ENERGY INC | 1360.00 | 586.00 | 365 |
| 1988 | MARAM ENERGY INC | 1293.00 | 435.00 | 105 |
| 1989 | MARAM ENERGY INC | 1391.00 | 428.00 | 365 |
| 1990 | MARAM ENERGY INC | 1299.00 | 339.00 | 365 |
| 1991 | MARAM ENERGY INC | 1314.00 | 310.00 | 365 |
| 1992 | MARAM ENERGY INC | 1249.00 | 0.00 | 365 |
| 1993 | MARAM ENERGY INC | 1307.00 | 0.00 | 365 |
| 1994 | MARAM ENERGY INC | 1213.00 | 0.00 | 365 |
| 1995 | MARAM ENERGY INC | 1115.00 | 0.00 | 365 |
| 1996 | MARAM ENERGY INC | 1143.00 | 0.00 | 365 |
| 1997 | MARAM ENERGY INC | 1106.00 | 0.00 | 365 |
| 1998 | MARAM ENERGY INC | 1038.00 | 0.00 | 365 |
| 1999 | MARAM ENERGY INC | 908.00 | 0.00 | 365 |
| 2000 | MARAM ENERGY INC | 805.00 | 72.00 | 365 |
| 2001 | MARAM ENERGY INC | 578.00 | 68.00 | 365 |
| 2002 | MARAM ENERGY INC | 661.00 | 106.00 | 260 |
| 2003 | MARAM ENERGY INC | 575.00 | 70.00 | 300 |
| 2004 | MARAM ENERGY INC | 375.00 | 35.00 | 180 |
| 2005 | MARAM ENERGY INC | 177.00 | 0.00 | 365 |
| 2006 | MARAM ENERGY INC | 298.00 | 229.00 | 365 |
| 2007 | MARAM ENERGY INC | 456.00 | 34.00 | 365 |
| 2008 | MARAM ENERGY INC | 681.00 | 102.00 | 365 |
| 2009 | MARAM ENERGY INC | 333.00 | 36.00 | 365 |
| 2010 | MARAM ENERGY INC | 435.00 | 78.00 | 365 |
| 2011 | MARAM ENERGY INC | 383.00 | 0.00 | 365 |
| 2012 | MARAM ENERGY INC | 311.00 | 65.00 | 366 |
| 2013 | MARAM ENERGY INC | 245.00 | 24.00 | 365 |
| 2014 | MARAM ENERGY INC | 307.00 | 65.00 | 365 |
| 2015 | MARAM ENERGY INC | 359.00 | 33.00 | 365 |
| 2016 | MARAM ENERGY INC | 314.00 | 34.00 | 365 |
| 2017 | MARAM ENERGY INC | 27.00 | 33.00 | 365 |
| 2018 | MARAM ENERGY INC | 360.00 | 36.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | B & J DRILLING CO | Brine | 546 | 0 |
| 1985 | B & J DRILLING CO | Brine | 256 | 0 |
| 1986 | B & J DRILLING CO | Brine | 767 | 365 |
| 1987 | MARAM ENERGY INC | Brine | 750 | 365 |
| 1988 | MARAM ENERGY INC | Brine | 612 | 105 |
| 1989 | MARAM ENERGY INC | Brine | 526 | 365 |
| 1990 | MARAM ENERGY INC | Brine | 438 | 365 |
| 1991 | MARAM ENERGY INC | Brine | 488 | 365 |
| 1992 | MARAM ENERGY INC | Brine | 390 | 365 |
| 1993 | MARAM ENERGY INC | Brine | 280 | 365 |
| 1994 | MARAM ENERGY INC | Brine | 245 | 365 |
| 1995 | MARAM ENERGY INC | Brine | 140 | 365 |
| 1996 | MARAM ENERGY INC | Brine | 70 | 365 |
| 1997 | MARAM ENERGY INC | Brine | 60 | 365 |
| 1998 | MARAM ENERGY INC | Brine | 30 | 365 |
| 1999 | MARAM ENERGY INC | Brine | 65 | 365 |
| 2000 | MARAM ENERGY INC | Brine | 92 | 365 |
| 2001 | MARAM ENERGY INC | Brine | 60 | 365 |
| 2002 | MARAM ENERGY INC | Brine | 75 | 260 |
| 2003 | MARAM ENERGY INC | Brine | 115 | 300 |
| 2004 | MARAM ENERGY INC | Brine | 62 | 180 |
| 2005 | MARAM ENERGY INC | Brine | 0 | 365 |
| 2006 | MARAM ENERGY INC | Brine | 135 | 365 |
| 2007 | MARAM ENERGY INC | Brine | 25 | 365 |
| 2008 | MARAM ENERGY INC | Brine | 105 | 365 |
| 2009 | MARAM ENERGY INC | Brine | 78 | 365 |
| 2010 | MARAM ENERGY INC | Brine | 0 | 365 |
| 2011 | MARAM ENERGY INC | Brine | 0 | 365 |
| 2012 | MARAM ENERGY INC | Brine | 60 | 366 |
| 2013 | MARAM ENERGY INC | Brine | 75 | 365 |
| 2014 | MARAM ENERGY INC | Brine | 60 | 365 |
| 2015 | MARAM ENERGY INC | Brine | 73 | 365 |
| 2016 | MARAM ENERGY INC | Brine | 128 | 365 |
| 2017 | MARAM ENERGY INC | Brine | 85 | 365 |
| 2018 | MARAM ENERGY INC | Brine | 105 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 000PL14765 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
| PL14765 | PL | No Violations |
For data sources see[9]