X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-083-23592

Well Details

Well ID: 34-083-23592
Loading map...
Country: United States
State: Ohio
County: Knox
Municipality: Brown Township
Operator Name: B & J DRILLING CO
Well Pad ID:
Farm/Lease Name: HORN MYRON G & FRANCES
License Status: Final Restoration
License Date: 2014-08-26
Spud Date: 1985-01-14
Spud Drilling Contractor: B & R DRLG
Final Drill Date: 1985-02-12
Well Total Depth: 2730.00 ft
Configuration: Vertical
Latitude: 40.520000
Longitude: -82.300000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1984-12-14 Issued Date 12/14/84 Expired Date 6/12/85 Acres 0100000 Tool Type CT Proposed Formation CLINTON Proposed Depth 02730 Proposed Drill Depth 02730
Original Spud 1985-01-14 FDT/RED ROCK
Completed 1985-02-12 FDT/RED ROCK
Reached Total Depth 1985-02-12 FDT/RED ROCK
CO 1985-03-01 476 MARAM ENERGY CO GeoDate 12/14/84
Completion Report Received 1986-07-30 FDT/RED ROCK
Change of Owner 2013-03-22 Operator changed from 476, MARAM ENERGY CO to 438, B & J DRILLING CO
APP 2014-08-26 Proposed Formations:CLINTON, Issued Date:8/26/2014, Expired Date:8/25/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:HAD, Proposed Well Class:
Plugged/Abandoned 2014-12-14 FDT/RED ROCK
Construction Permit Expires 2016-08-25 FDT/RED ROCK
Record Last Modified 2017-02-15 FDT/RED ROCK

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 2657 2667 11
2657 2667 11
2657 2667 11

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 58000 Gal 25000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 MARAM ENERGY INC 4990.00 1937.00 365
1986 MARAM ENERGY INC 4834.00 1221.00 365
1987 MARAM ENERGY INC 4096.00 934.00 365
1988 MARAM ENERGY INC 2865.00 436.00 365
1989 MARAM ENERGY INC 1576.00 309.00 365
1990 MARAM ENERGY INC 667.00 234.00 365
1991 MARAM ENERGY INC 330.00 156.00 365
1992 MARAM ENERGY INC 114.00 73.00 365
1993 MARAM ENERGY INC 568.00 148.00 365
1994 MARAM ENERGY INC 660.00 232.00 365
1995 MARAM ENERGY INC 184.00 153.00 365
1996 MARAM ENERGY INC 578.00 548.00 365
1997 MARAM ENERGY INC 631.00 401.00 365
1998 MARAM ENERGY INC 497.00 164.00 365
1999 MARAM ENERGY INC 434.00 239.00 365
2000 MARAM ENERGY INC 254.00 162.00 365
2001 MARAM ENERGY INC 194.00 210.00 365
2002 MARAM ENERGY INC 139.00 140.00 260
2003 MARAM ENERGY INC 38.00 143.00 360
2004 MARAM ENERGY INC 18.00 128.00 150
2005 MARAM ENERGY INC 0.00 149.00 365
2006 MARAM ENERGY INC 355.00 231.00 365
2007 MARAM ENERGY INC 143.00 149.00 365
2008 MARAM ENERGY INC 123.00 220.00 365
2009 MARAM ENERGY INC 27.00 0.00 365
2010 MARAM ENERGY INC 0.00 71.00 365
2011 MARAM ENERGY INC 0.00 27.00 365
2012 MARAM ENERGY INC 0.00 22.00 366
2013 MARAM ENERGY INC 0.00 0.00 61
2014 B & J DRILLING CO 33.00 55.00 365
2015 B & J DRILLING CO 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 MARAM ENERGY INC Brine 0 365
1986 MARAM ENERGY INC Brine 0 365
1987 MARAM ENERGY INC Brine 0 365
1988 MARAM ENERGY INC Brine 0 365
1989 MARAM ENERGY INC Brine 0 365
1990 MARAM ENERGY INC Brine 0 365
1991 MARAM ENERGY INC Brine 0 365
1992 MARAM ENERGY INC Brine 0 365
1993 MARAM ENERGY INC Brine 0 365
1994 MARAM ENERGY INC Brine 35 365
1995 MARAM ENERGY INC Brine 440 365
1996 MARAM ENERGY INC Brine 105 365
1997 MARAM ENERGY INC Brine 87 365
1998 MARAM ENERGY INC Brine 145 365
1999 MARAM ENERGY INC Brine 75 365
2000 MARAM ENERGY INC Brine 185 365
2001 MARAM ENERGY INC Brine 123 365
2002 MARAM ENERGY INC Brine 70 260
2003 MARAM ENERGY INC Brine 155 360
2004 MARAM ENERGY INC Brine 120 150
2005 MARAM ENERGY INC Brine 0 365
2006 MARAM ENERGY INC Brine 532 365
2007 MARAM ENERGY INC Brine 100 365
2008 MARAM ENERGY INC Brine 175 365
2009 MARAM ENERGY INC Brine 103 365
2010 MARAM ENERGY INC Brine 85 365
2011 MARAM ENERGY INC Brine 40 365
2012 MARAM ENERGY INC Brine 45 366
2013 B & J DRILLING CO Brine 300 365
2014 B & J DRILLING CO Brine 515 365
2015 B & J DRILLING CO Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1890725089 2014-12-17 0:00 PB No Violations
-302504709 2014-12-12 0:00 PB No Violations
000CEN1005 1995-08-03 Production Wells No Violations 1509.05
000PL14586 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0302504709 2014-12-12 Plug / Plug Back No Violations Piped ripped finishing bottom hole plug washing in clay 5 tons, setting precast on the 7 inch seat, and washing in top hole plug.
0710796413 2006-02-21 Production Wells No Violations Well is producing. Tanks may be being shared with nearby permit # 4083?
1341536028 2015-03-31 Final Restoration No Violations This area is free of any indications of the presence of a well the area has established vegetation growing in the area of where the well was located.
1418743272 2014-12-15 Plug / Plug Back No Violations The bottom hole plug is set 4 1/2 ripped and pulled, working on getting out 7 inch to set precast plug.
1890725089 2014-12-17 Plug / Plug Back No Violations Plugging this hole today 668 feet of 7 in was retrieved and they are in the process of pulling the 8 in casing 350 feet.
710796413 2006-2-21 0:00: PW No Violations
CEN1005 1995-8-3 0:00:0 PW No Violations
PL14586 PL No Violations

For data sources see[9]

References