If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-23866 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.32,"lon":-82.22,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Butler Township | |
| Operator Name: VALLEY PETROLEUM MANAGEMENT | |
| Well Pad ID: | |
| Farm/Lease Name: BEATTY JACK | |
| License Status: Final Restoration | |
| License Date: 2005-08-30 | |
| Spud Date: 1989-10-28 | |
| Spud Drilling Contractor: VALLEY PETROLEUM | |
| Final Drill Date: 1989-11-18 | |
| Well Total Depth: 3146.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.320000 | |
| Longitude: -82.220000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1989-07-18 | Issued Date 7/18/89 Expired Date 7/18/90 Acres 0160000 Tool Type CT Proposed Formation CLINTON Proposed Depth 03146 Proposed Drill Depth 03146 |
| Original Spud | 1989-10-28 | |
| Completed | 1989-11-18 | |
| Reached Total Depth | 1989-11-18 | |
| CO | 1989-12-04 | 360 RELIANCE ENERGY INC GeoDate 7/18/89 |
| Completion Report Received | 1989-12-06 | |
| Change of Owner | 1999-07-06 | Operator changed from 360, RELIANCE ENERGY INC to 231, VALLEY PETROLEUM MANAGMNT |
| APP | 2005-08-30 | Proposed Formations:CLINTON, Issued Date:8/30/2005, Expired Date:8/30/2006 6:00:00 AM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class: |
| Plugged/Abandoned | 2006-02-13 | |
| Construction Permit Expires | 2006-08-30 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 3084 | 0 | |
| 3084 | 0 | ||
| 3084 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 1850 Bbl | 25000 | FRAC:WATER/SAND |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1989 | RELIANCE ENERGY INC | 0.00 | 199.00 | 31 |
| 1990 | RELIANCE ENERGY INC | 4965.00 | 2195.00 | 365 |
| 1991 | RELIANCE ENERGY INC | 24.00 | 1030.00 | 365 |
| 1992 | RELIANCE ENERGY INC | 1829.00 | 716.00 | 365 |
| 1993 | RELIANCE ENERGY INC | 1725.00 | 562.00 | 365 |
| 1994 | RELIANCE ENERGY INC | 1330.00 | 517.00 | 365 |
| 1995 | RELIANCE ENERGY INC | 1277.00 | 354.00 | 365 |
| 1996 | RELIANCE ENERGY INC | 841.00 | 394.00 | 365 |
| 1997 | RELIANCE ENERGY INC | 844.00 | 280.00 | 365 |
| 1998 | RELIANCE ENERGY INC | 697.00 | 267.00 | 365 |
| 1999 | VALLEY PETROLEUM MANAGEMENT | 240.00 | 113.00 | 183 |
| 2000 | VALLEY PETROLEUM MANAGEMENT | 466.00 | 109.00 | 365 |
| 2001 | VALLEY PETROLEUM MANAGEMENT | 70.00 | 35.00 | 365 |
| 2002 | VALLEY PETROLEUM MANAGEMENT | 0.00 | 76.00 | 365 |
| 2003 | VALLEY PETROLEUM MANAGEMENT | 260.00 | 73.00 | 365 |
| 2004 | VALLEY PETROLEUM MANAGEMENT | 0.00 | 35.00 | 365 |
| 2005 | VALLEY PETROLEUM MANAGEMENT | 0.00 | 73.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1989 | RELIANCE ENERGY INC | Brine | 65 | 31 |
| 1990 | RELIANCE ENERGY INC | Brine | 455 | 365 |
| 1991 | RELIANCE ENERGY INC | Brine | 225 | 365 |
| 1992 | RELIANCE ENERGY INC | Brine | 137 | 365 |
| 1993 | RELIANCE ENERGY INC | Brine | 59 | 365 |
| 1994 | RELIANCE ENERGY INC | Brine | 33 | 365 |
| 1995 | RELIANCE ENERGY INC | Brine | 65 | 365 |
| 1996 | RELIANCE ENERGY INC | Brine | 58 | 365 |
| 1997 | RELIANCE ENERGY INC | Brine | 70 | 365 |
| 1998 | RELIANCE ENERGY INC | Brine | 63 | 365 |
| 1999 | VALLEY PETROLEUM MANAGEMENT | Brine | 25 | 183 |
| 2000 | VALLEY PETROLEUM MANAGEMENT | Brine | 206 | 365 |
| 2001 | VALLEY PETROLEUM MANAGEMENT | Brine | 34 | 365 |
| 2002 | VALLEY PETROLEUM MANAGEMENT | Brine | 25 | 365 |
| 2003 | VALLEY PETROLEUM MANAGEMENT | Brine | 0 | 365 |
| 2004 | VALLEY PETROLEUM MANAGEMENT | Brine | 0 | 365 |
| 2005 | VALLEY PETROLEUM MANAGEMENT | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -9295 | 2006-2-7 0:00:0 | PB | No Violations | |
| 0000009295 | 2006-02-07 | Plug / Plug Back | No Violations | Met at site with Jeff Fry and Mike Wheeler to discuss plugging program. Wheeler is just rigging up and preparing to pull rods and tubing today. |
| 1139428359 | 2006-02-08 | Plug / Plug Back | No Violations | Finished removing 2 inch tubing while on site. Planning on bottom plug tomorrow (2/9/06). |
| 1153919373 | 2006-07-26 | Final Restoration | No Violations | Area graded, field is planted in oats. |
| 2112303479 | 2006-04-21 | Preliminary Restoration | No Violations | Pits filled, some debris removal and final grading and seeding still needed. |
For data sources see[9]