If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24201 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.45,"lon":-82.41,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Monroe Township | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: BOSS UNIT | |
License Status: Producing | |
License Date: 2003-04-29 | |
Spud Date: 2003-06-03 | |
Spud Drilling Contractor: PINNACLE DRILLING | |
Final Drill Date: 2003-06-10 | |
Well Total Depth: 4568.00 ft | |
Configuration: Vertical | |
Latitude: 40.450000 | |
Longitude: -82.410000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2003-04-29 | 2834 BI JOE DEVELOPMENT INC Proposed Formation TREMPEALEAU Issued Date 4/29/2003 Expired Date 4/28/2004 6:00:00 AM |
Inspector Comments Cement Job | 2003-06-03 | On site at 4:50 p.m.for cement surface job. Good circulation w/ cement returns noted at top of conductor pipe. Was topped off and held. Joe Cross of Bi Joe Development was also on site during the surface job.Cement Ticket Notes Inspector Reporting CROW DAVID |
Original Spud | 2003-06-03 | RBDMS Rec |
Completed | 2003-06-10 | RBDMS Rec |
Reached Total Depth | 2003-06-10 | RBDMS Rec |
Completion Report Received | 2003-11-10 | RBDMS Rec |
Construction Permit Expires | 2004-04-28 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2003-12-30 | 4429 | 4522 | 34 |
4429 | 4522 | 34 | |
4429 | 4522 | 34 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 3000 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
0 | 0 | 0 | ||
2003 | BI JOE DEVELOPMENT INC | 757.00 | 48.00 | 122 |
2004 | BI JOE DEVELOPMENT INC | 1342.00 | 2307.00 | 122 |
2005 | BI JOE DEVELOPMENT INC | 1065.00 | 1477.00 | 365 |
2006 | BI JOE DEVELOPMENT INC | 1131.00 | 1229.00 | 365 |
2007 | BI JOE DEVELOPMENT INC | 528.00 | 864.00 | 365 |
2008 | BI JOE DEVELOPMENT INC | 188.00 | 756.00 | 365 |
2009 | BI JOE DEVELOPMENT INC | 194.00 | 746.00 | 365 |
2010 | BI JOE DEVELOPMENT INC | 283.00 | 392.00 | 365 |
2011 | BI JOE DEVELOPMENT INC | 169.00 | 476.00 | 365 |
2012 | BI JOE DEVELOPMENT INC | 205.00 | 436.00 | 366 |
2013 | BI JOE DEVELOPMENT INC | 195.00 | 409.00 | 365 |
2014 | BI JOE DEVELOPMENT INC | 489.00 | 332.00 | 365 |
2015 | BI JOE DEVELOPMENT INC | 401.00 | 303.00 | 365 |
2016 | BI JOE DEVELOPMENT INC | 565.00 | 330.00 | 365 |
2017 | BI JOE DEVELOPMENT INC | 478.00 | 312.00 | 365 |
2018 | BI JOE DEVELOPMENT INC | 426.00 | 241.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | BI JOE DEVELOPMENT INC | Brine | 275 | 122 |
2004 | BI JOE DEVELOPMENT INC | Brine | 860 | 122 |
2005 | BI JOE DEVELOPMENT INC | Brine | 340 | 365 |
2006 | BI JOE DEVELOPMENT INC | Brine | 295 | 365 |
2007 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2008 | BI JOE DEVELOPMENT INC | Brine | 624 | 365 |
2009 | BI JOE DEVELOPMENT INC | Brine | 234 | 365 |
2010 | BI JOE DEVELOPMENT INC | Brine | 196 | 365 |
2011 | BI JOE DEVELOPMENT INC | Brine | 122 | 365 |
2012 | BI JOE DEVELOPMENT INC | Brine | 240 | 366 |
2013 | BI JOE DEVELOPMENT INC | Brine | 85 | 365 |
2014 | BI JOE DEVELOPMENT INC | Brine | 75 | 365 |
2015 | BI JOE DEVELOPMENT INC | Brine | 160 | 365 |
2016 | BI JOE DEVELOPMENT INC | Brine | 265 | 365 |
2017 | BI JOE DEVELOPMENT INC | Brine | 245 | 365 |
2018 | BI JOE DEVELOPMENT INC | Brine | 160 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-86403934 | 2003-6-3 0:00:0 | DD | No Violations | |
0086403934 | 2003-06-03 | Drill / Deepen / Reopen | No Violations | moving Pinnacle drill rig in on location. Rig still folded down. |
1057061165 | 2003-07-01 | Production Wells | No Violations | New well exists but no pump jack on site yet. Most of the pit areas have been closed and dozer is grading the area. |
1065633875 | 2003-10-08 | Production Wells | No Violations | New drilled well , has pump jack and is capable of production. Preliminary restoration is complete and vegetation growing good. |
1084976196 | 2004-05-19 | Production Wells | No Violations | Well was pumping during inspection. Dikes are properly constructed around tank battery and ID sign is on tanks. Spoke w/ pumper Clem. Well is producing oil and gas. |
1085578165 | 2004-05-26 | Preliminary Restoration | No Violations | Area regraded and seeded. Entry road has stone on it to tanks and wells. Tanks and well GPS reading updated. PR passes. |
For data sources see[9]