If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24277 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.47,"lon":-82.42,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Pike Township | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: MCFARLAND D UNIT | |
License Status: Producing | |
License Date: 2008-05-07 | |
Spud Date: 2008-06-05 | |
Spud Drilling Contractor: G & H DRLG | |
Final Drill Date: 2008-06-13 | |
Well Total Depth: 4700.00 ft | |
Configuration: Vertical | |
Latitude: 40.470000 | |
Longitude: -82.420000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-06-01 | Proposed Formations:TREMPEALEAU, Issued Date:6/1/2006, Expired Date:6/1/2007 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2006-10-06 | Proposed Formations:TREMPEALEAU, Issued Date:10/6/2006, Expired Date:10/6/2007 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2008-05-07 | Proposed Formations:TREMPEALEAU, Issued Date:5/7/2008, Expired Date:5/7/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-06-13 | |
Completion Report Received | 2008-09-30 | |
Construction Permit Expires | 2009-05-07 | |
End of Confidential Data | 2009-06-14 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-11-26 | 4542 | 4620 | 42 |
4542 | 4620 | 42 | |
4542 | 4620 | 42 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 3000 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
0 | 0 | 0 | ||
2008 | BI JOE DEVELOPMENT INC | 4584.00 | 225.00 | 125 |
2009 | BI JOE DEVELOPMENT INC | 27658.00 | 476.00 | 365 |
2010 | BI JOE DEVELOPMENT INC | 33522.00 | 349.00 | 365 |
2011 | BI JOE DEVELOPMENT INC | 26842.00 | 330.00 | 365 |
2012 | BI JOE DEVELOPMENT INC | 19135.00 | 275.00 | 366 |
2013 | BI JOE DEVELOPMENT INC | 14833.00 | 280.00 | 365 |
2014 | BI JOE DEVELOPMENT INC | 12856.00 | 191.00 | 365 |
2015 | BI JOE DEVELOPMENT INC | 11552.00 | 164.00 | 365 |
2016 | BI JOE DEVELOPMENT INC | 10125.00 | 246.00 | 365 |
2017 | BI JOE DEVELOPMENT INC | 8844.00 | 122.00 | 365 |
2018 | BI JOE DEVELOPMENT INC | 6520.00 | 85.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | BI JOE DEVELOPMENT INC | Brine | 865 | 125 |
2009 | BI JOE DEVELOPMENT INC | Brine | 627 | 365 |
2010 | BI JOE DEVELOPMENT INC | Brine | 514 | 365 |
2011 | BI JOE DEVELOPMENT INC | Brine | 520 | 365 |
2012 | BI JOE DEVELOPMENT INC | Brine | 390 | 366 |
2013 | BI JOE DEVELOPMENT INC | Brine | 235 | 365 |
2014 | BI JOE DEVELOPMENT INC | Brine | 305 | 365 |
2015 | BI JOE DEVELOPMENT INC | Brine | 330 | 365 |
2016 | BI JOE DEVELOPMENT INC | Brine | 195 | 365 |
2017 | BI JOE DEVELOPMENT INC | Brine | 385 | 365 |
2018 | BI JOE DEVELOPMENT INC | Brine | 220 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-387825638 | 2013-4-25 0:00: | PL | No Violations | |
0387825638 | 2013-04-25 | Preliminary Restoration | No Violations | This well is a producing well. |
0400126871 | 2008-06-18 | Drill / Deepen / Reopen | No Violations | The inspection revealed that the well has been drilled. The 4 inch was closed in. The pits are still open containing fluid. No violations noted this date. |
1212762405 | 2008-06-06 | Drill / Deepen / Reopen | No Violations | On site to witness surface casing cementing. Hydrolics failed and section of drill pipe was lost down the hole. Asked owner Joe Cross to call when surface casing is ready to be placed and cemented. |
1823761007 | 2018-01-29 | Production Wells | No Violations | This well is a producing well the pumping unit was pumping during this inspection. The records of production reporting are current and there were no issues to note during this inspection with this well. |
400126871 | 2008-6-18 0:00: | DD | No Violations |
For data sources see[9]