If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24286 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.46,"lon":-82.41,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Monroe Township | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: NADOLSON UNIT | |
License Status: Producing | |
License Date: 2006-08-07 | |
Spud Date: 2006-08-03 | |
Spud Drilling Contractor: PINNACLE DRILLING | |
Final Drill Date: 2006-08-12 | |
Well Total Depth: 4682.00 ft | |
Configuration: Vertical | |
Latitude: 40.460000 | |
Longitude: -82.410000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-08-07 | Proposed Formations:TREMPEALEAU, Issued Date:8/7/2006, Expired Date:8/7/2007 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2006-08-12 | RBDMS Rec |
Reached Total Depth | 2006-08-12 | RBDMS Rec |
Completion Report Received | 2006-11-06 | RBDMS Rec |
Construction Permit Expires | 2007-08-07 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-01-10 | 4508 | 4576 | 54 |
4508 | 4576 | 54 | |
4508 | 4576 | 54 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 3000 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
0 | 0 | 0 | ||
2007 | BI JOE DEVELOPMENT INC | 379.00 | 974.00 | 365 |
2008 | BI JOE DEVELOPMENT INC | 105.00 | 653.00 | 365 |
2009 | BI JOE DEVELOPMENT INC | 163.00 | 515.00 | 365 |
2010 | BI JOE DEVELOPMENT INC | 145.00 | 356.00 | 365 |
2011 | BI JOE DEVELOPMENT INC | 74.00 | 348.00 | 365 |
2012 | BI JOE DEVELOPMENT INC | 105.00 | 281.00 | 366 |
2013 | BI JOE DEVELOPMENT INC | 32.00 | 347.00 | 365 |
2014 | BI JOE DEVELOPMENT INC | 21.00 | 290.00 | 365 |
2015 | BI JOE DEVELOPMENT INC | 103.00 | 163.00 | 365 |
2016 | BI JOE DEVELOPMENT INC | 132.00 | 329.00 | 365 |
2017 | BI JOE DEVELOPMENT INC | 135.00 | 169.00 | 365 |
2018 | BI JOE DEVELOPMENT INC | 120.00 | 315.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | BI JOE DEVELOPMENT INC | Brine | 348 | 365 |
2008 | BI JOE DEVELOPMENT INC | Brine | 750 | 365 |
2009 | BI JOE DEVELOPMENT INC | Brine | 200 | 365 |
2010 | BI JOE DEVELOPMENT INC | Brine | 238 | 365 |
2011 | BI JOE DEVELOPMENT INC | Brine | 118 | 365 |
2012 | BI JOE DEVELOPMENT INC | Brine | 170 | 366 |
2013 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2014 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2015 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2016 | BI JOE DEVELOPMENT INC | Brine | 40 | 365 |
2017 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2018 | BI JOE DEVELOPMENT INC | Brine | 8 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1155753285 | 2006-08-16 | Production Wells | No Violations | Well has been drilled. This was drilled after lost hole on PN 4274 Nadolson #4 was plugged and rig was skidded. |
1185205882 | 2007-07-23 | Preliminary Restoration | No Violations | Preliminary restoration passes. Small amount of oil at well head, absorbent pads are being used. |
For data sources see[9]