If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24293 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.45,"lon":-82.39,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Monroe Township | |
| Operator Name: BI JOE DEVELOPMENT INC | |
| Well Pad ID: | |
| Farm/Lease Name: BURSON UNIT | |
| License Status: Final Restoration | |
| License Date: 2017-07-11 | |
| Spud Date: 2007-08-28 | |
| Spud Drilling Contractor: LAND & SHORE DRILLING, LTD | |
| Final Drill Date: 2007-09-08 | |
| Well Total Depth: 4718.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.450000 | |
| Longitude: -82.390000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2006-10-06 | Proposed Formations:TREMPEALEAU, Issued Date:10/6/2006, Expired Date:10/6/2007 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
| Completed | 2007-09-08 | |
| Reached Total Depth | 2007-09-08 | |
| Completion Report Received | 2007-11-08 | |
| APP | 2017-07-11 | Proposed Formations:TREMPEALEAU DOLOMITE, Issued Date:7/11/2017, Expired Date:7/11/2019 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
| Record Last Modified | 2017-07-18 | |
| Construction Permit Expires | 2019-07-11 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2008-02-15 | 4564 | 4626 | 34 |
| 4564 | 4626 | 34 | |
| 4564 | 4626 | 34 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| ACID | 15 | 3000 Gal | 0 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 0 | 0 | 0 | ||
| 2007 | BI JOE DEVELOPMENT INC | 0.00 | 0.00 | 94 |
| 2008 | BI JOE DEVELOPMENT INC | 335.00 | 250.00 | 94 |
| 2009 | BI JOE DEVELOPMENT INC | 210.00 | 249.00 | 365 |
| 2010 | BI JOE DEVELOPMENT INC | 142.00 | 117.00 | 365 |
| 2011 | BI JOE DEVELOPMENT INC | 103.00 | 221.00 | 365 |
| 2012 | BI JOE DEVELOPMENT INC | 88.00 | 85.00 | 366 |
| 2013 | BI JOE DEVELOPMENT INC | 0.00 | 72.00 | 365 |
| 2014 | BI JOE DEVELOPMENT INC | 61.00 | 152.00 | 365 |
| 2015 | BI JOE DEVELOPMENT INC | 38.00 | 0.00 | 365 |
| 2016 | BI JOE DEVELOPMENT INC | 32.00 | 0.00 | 365 |
| 2017 | BI JOE DEVELOPMENT INC | 18.00 | 74.00 | 365 |
| 2018 | BI JOE DEVELOPMENT INC | 0.00 | 53.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2007 | BI JOE DEVELOPMENT INC | Brine | 80 | 94 |
| 2008 | BI JOE DEVELOPMENT INC | Brine | 614 | 94 |
| 2009 | BI JOE DEVELOPMENT INC | Brine | 387 | 365 |
| 2010 | BI JOE DEVELOPMENT INC | Brine | 375 | 365 |
| 2011 | BI JOE DEVELOPMENT INC | Brine | 375 | 365 |
| 2012 | BI JOE DEVELOPMENT INC | Brine | 225 | 366 |
| 2013 | BI JOE DEVELOPMENT INC | Brine | 45 | 365 |
| 2014 | BI JOE DEVELOPMENT INC | Brine | 235 | 365 |
| 2015 | BI JOE DEVELOPMENT INC | Brine | 260 | 365 |
| 2016 | BI JOE DEVELOPMENT INC | Brine | 160 | 365 |
| 2017 | BI JOE DEVELOPMENT INC | Brine | 235 | 365 |
| 2018 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1892195198 | 2018-5-31 0:00: | PB | No Violations | |
| -1974502016 | 2018-6-8 0:00:0 | PB | No Violations | |
| -2085443968 | 2018-6-1 0:00:0 | PB | No Violations | |
| 0592470751 | 2018-05-30 | Plug / Plug Back | No Violations | Plugging operations continue with the plugging of this well. Petroset Cementing Service Inc was on site to set the bottom hole plug today. The tubing was then pulled and removed from the location. The well head was disassembled to prepare to rip and pull the 4 1/2 inch production casing. |
| 0722781276 | 2017-07-06 | Production Wells | No Violations | This well has been permitted to be plugged this inspection is to establish the location and get a good GPS reading before it is plugged. There are no issues to note with this well. |
| 1189416623 | 2007-08-29 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the surface casing |
| 1364571753 | 2013-03-27 | Preliminary Restoration | No Violations | I inspected this well today and found no violations and the well is in production. PRD passed |
| 1405674911 | 2019-7-3 0:00:0 | FR | No Violations | |
| 1422101905 | 2018-5-24 0:00: | PB | No Violations | |
| 151964778 | 2018-5-29 0:00: | PB | No Violations | |
| 1892195198 | 2018-05-31 | Plug / Plug Back | No Violations | Plugging operations continue with the plugging of this well. Today they went in and tagged the bottom hole plug at 4494 feet. The 4 1/2 production casing was ripped at 3903 feet and pulled up 5 feet to set a 300 foot plug from 3903 feet to 3603 feet for the Trenton and Utica plug. Then pulled the 4 1/2 casing up and set the clinton plug from 2650 feet to 2490 feet. |
| 2085443968 | 2018-06-01 | Plug / Plug Back | No Violations | Plugging operations continue with the plugging of this well. Today Petroset Cementing Service Inc was on site to set the Big lime plug from 1780 feet to 1630 feet, The Berea and bottom of surface casing plug from 770 feet to 400 feet, and the top surface plug from 150 feet to surface. The cement fell back 15 feet and will be grouted to the cut off point of the surface casing for identification placement and proper burring depth. |
| 592470751 | 2018-5-30 0:00: | PB | No Violations | |
| 722781276 | 2017-7-6 0:00:0 | PW | No Violations |
For data sources see[9]