X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-083-24293

Well Details

Well ID: 34-083-24293
Loading map...
Country: United States
State: Ohio
County: Knox
Municipality: Monroe Township
Operator Name: BI JOE DEVELOPMENT INC
Well Pad ID:
Farm/Lease Name: BURSON UNIT
License Status: Final Restoration
License Date: 2017-07-11
Spud Date: 2007-08-28
Spud Drilling Contractor: LAND & SHORE DRILLING, LTD
Final Drill Date: 2007-09-08
Well Total Depth: 4718.00 ft
Configuration: Vertical
Latitude: 40.450000
Longitude: -82.390000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-10-06 Proposed Formations:TREMPEALEAU, Issued Date:10/6/2006, Expired Date:10/6/2007 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Completed 2007-09-08
Reached Total Depth 2007-09-08
Completion Report Received 2007-11-08
APP 2017-07-11 Proposed Formations:TREMPEALEAU DOLOMITE, Issued Date:7/11/2017, Expired Date:7/11/2019 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:
Record Last Modified 2017-07-18
Construction Permit Expires 2019-07-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-02-15 4564 4626 34
4564 4626 34
4564 4626 34

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 15 3000 Gal 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
0 0 0
2007 BI JOE DEVELOPMENT INC 0.00 0.00 94
2008 BI JOE DEVELOPMENT INC 335.00 250.00 94
2009 BI JOE DEVELOPMENT INC 210.00 249.00 365
2010 BI JOE DEVELOPMENT INC 142.00 117.00 365
2011 BI JOE DEVELOPMENT INC 103.00 221.00 365
2012 BI JOE DEVELOPMENT INC 88.00 85.00 366
2013 BI JOE DEVELOPMENT INC 0.00 72.00 365
2014 BI JOE DEVELOPMENT INC 61.00 152.00 365
2015 BI JOE DEVELOPMENT INC 38.00 0.00 365
2016 BI JOE DEVELOPMENT INC 32.00 0.00 365
2017 BI JOE DEVELOPMENT INC 18.00 74.00 365
2018 BI JOE DEVELOPMENT INC 0.00 53.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2007 BI JOE DEVELOPMENT INC Brine 80 94
2008 BI JOE DEVELOPMENT INC Brine 614 94
2009 BI JOE DEVELOPMENT INC Brine 387 365
2010 BI JOE DEVELOPMENT INC Brine 375 365
2011 BI JOE DEVELOPMENT INC Brine 375 365
2012 BI JOE DEVELOPMENT INC Brine 225 366
2013 BI JOE DEVELOPMENT INC Brine 45 365
2014 BI JOE DEVELOPMENT INC Brine 235 365
2015 BI JOE DEVELOPMENT INC Brine 260 365
2016 BI JOE DEVELOPMENT INC Brine 160 365
2017 BI JOE DEVELOPMENT INC Brine 235 365
2018 BI JOE DEVELOPMENT INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1892195198 2018-5-31 0:00: PB No Violations
-1974502016 2018-6-8 0:00:0 PB No Violations
-2085443968 2018-6-1 0:00:0 PB No Violations
0592470751 2018-05-30 Plug / Plug Back No Violations Plugging operations continue with the plugging of this well. Petroset Cementing Service Inc was on site to set the bottom hole plug today. The tubing was then pulled and removed from the location. The well head was disassembled to prepare to rip and pull the 4 1/2 inch production casing.
0722781276 2017-07-06 Production Wells No Violations This well has been permitted to be plugged this inspection is to establish the location and get a good GPS reading before it is plugged. There are no issues to note with this well.
1189416623 2007-08-29 Drill / Deepen / Reopen No Violations I witnessed the cementing of the surface casing
1364571753 2013-03-27 Preliminary Restoration No Violations I inspected this well today and found no violations and the well is in production. PRD passed
1405674911 2019-7-3 0:00:0 FR No Violations
1422101905 2018-5-24 0:00: PB No Violations
151964778 2018-5-29 0:00: PB No Violations
1892195198 2018-05-31 Plug / Plug Back No Violations Plugging operations continue with the plugging of this well. Today they went in and tagged the bottom hole plug at 4494 feet. The 4 1/2 production casing was ripped at 3903 feet and pulled up 5 feet to set a 300 foot plug from 3903 feet to 3603 feet for the Trenton and Utica plug. Then pulled the 4 1/2 casing up and set the clinton plug from 2650 feet to 2490 feet.
2085443968 2018-06-01 Plug / Plug Back No Violations Plugging operations continue with the plugging of this well. Today Petroset Cementing Service Inc was on site to set the Big lime plug from 1780 feet to 1630 feet, The Berea and bottom of surface casing plug from 770 feet to 400 feet, and the top surface plug from 150 feet to surface. The cement fell back 15 feet and will be grouted to the cut off point of the surface casing for identification placement and proper burring depth.
592470751 2018-5-30 0:00: PB No Violations
722781276 2017-7-6 0:00:0 PW No Violations

For data sources see[9]

References