If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24304 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.49,"lon":-82.27,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Jefferson Township | |
Operator Name: B & J DRILLING CO | |
Well Pad ID: | |
Farm/Lease Name: MONIGER RD (ROSKWITALSKI) | |
License Status: Producing | |
License Date: 2007-04-02 | |
Spud Date: 2007-04-24 | |
Spud Drilling Contractor: B & J DRLG | |
Final Drill Date: 2007-07-24 | |
Well Total Depth: 2833.00 ft | |
Configuration: Vertical | |
Latitude: 40.490000 | |
Longitude: -82.270000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-04-02 | Proposed Formations:CLINTON, Issued Date:4/2/2007, Expired Date:4/1/2008 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2007-07-24 | |
Reached Total Depth | 2007-07-24 | |
Completion Report Received | 2007-12-10 | |
Construction Permit Expires | 2008-04-01 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 40000 Gal | 5000 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | B & J DRILLING CO | 0.00 | 0.00 | 0 |
2008 | B & J DRILLING CO | 7783.00 | 105.00 | 360 |
2009 | B & J DRILLING CO | 3030.00 | 57.00 | 365 |
2010 | B & J DRILLING CO | 2289.00 | 59.00 | 365 |
2011 | B & J DRILLING CO | 1117.00 | 0.00 | 365 |
2012 | B & J DRILLING CO | 91.00 | 50.00 | 366 |
2013 | B & J DRILLING CO | 0.00 | 34.00 | 365 |
2014 | B & J DRILLING CO | 0.00 | 12.00 | 365 |
2015 | B & J DRILLING CO | 0.00 | 66.00 | 365 |
2016 | B & J DRILLING CO | 0.00 | 64.00 | 365 |
2017 | B & J DRILLING CO | 180.00 | 116.00 | 365 |
2018 | B & J DRILLING CO | 0.00 | 58.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | B & J DRILLING CO | Brine | 0 | 0 |
2008 | B & J DRILLING CO | Brine | 385 | 360 |
2009 | B & J DRILLING CO | Brine | 65 | 365 |
2010 | B & J DRILLING CO | Brine | 115 | 365 |
2011 | B & J DRILLING CO | Brine | 80 | 365 |
2012 | B & J DRILLING CO | Brine | 0 | 366 |
2013 | B & J DRILLING CO | Brine | 115 | 365 |
2014 | B & J DRILLING CO | Brine | 130 | 365 |
2015 | B & J DRILLING CO | Brine | 65 | 365 |
2016 | B & J DRILLING CO | Brine | 90 | 365 |
2017 | B & J DRILLING CO | Brine | 158 | 365 |
2018 | B & J DRILLING CO | Brine | 125 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-366171535 | 2008-11-24 0:00 | PL | No Violations | |
0366171535 | 2008-11-24 | Preliminary Restoration | No Violations | Preliminary restoration passes. Well is producing. |
1177947743 | 2007-04-26 | Drill / Deepen / Reopen | No Violations | Drilling started 4/24/07. Depth is at 130 ft today. Pits are in and lined with plastic. |
For data sources see[8]