If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24312 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.28,"lon":-82.48,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Miller Township | |
| Operator Name: MARAM ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: HUNKINS RODNEY & JOYCE | |
| License Status: Producing | |
| License Date: 2007-06-12 | |
| Spud Date: 2007-09-20 | |
| Spud Drilling Contractor: BOWMAN DRILLING | |
| Final Drill Date: 2007-09-24 | |
| Well Total Depth: 2340.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.280000 | |
| Longitude: -82.480000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2007-06-12 | Proposed Formations:CLINTON, Issued Date:6/12/2007, Expired Date:6/11/2008 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Correction to Well | 2007-08-31 | CHANGE IN TOOL TYPE, NOW CABLE/ROTARY; CHANGE IN CASING PROGRAM. |
| Reached Total Depth | 2007-09-24 | |
| Construction Permit Expires | 2008-06-11 | |
| Completion Report Received | 2008-09-23 | |
| Change of Owner | 2017-02-15 | Operator changed from 560, MARION OPERATING CORP to 476, MARAM ENERGY CO |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2008-11-10 | 2252 | 2263 | 15 |
| 2252 | 2263 | 15 | |
| 2252 | 2263 | 15 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 45000 Gal | 25000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2009 | MARION OPERATING CORP | 1134.00 | 0.00 | 365 |
| 2010 | MARION OPERATING CORP | 1969.00 | 0.00 | 365 |
| 2011 | MARION OPERATING CORP | 2000.00 | 0.00 | 0 |
| 2012 | MARION OPERATING CORP | 1323.00 | 0.00 | 366 |
| 2013 | MARION OPERATING CORP | 949.00 | 0.00 | 365 |
| 2014 | MARION OPERATING CORP | 650.00 | 0.00 | 365 |
| 2015 | MARION OPERATING CORP | 571.00 | 0.00 | 365 |
| 2016 | MARION OPERATING CORP | 383.00 | 0.00 | 200 |
| 2017 | MARION OPERATING CORP | 76.00 | 0.00 | 365 |
| 2018 | MARAM ENERGY INC | 313.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2009 | MARION OPERATING CORP | Brine | 0 | 365 |
| 2010 | MARION OPERATING CORP | Brine | 0 | 365 |
| 2011 | MARION OPERATING CORP | Brine | 0 | |
| 2012 | MARION OPERATING CORP | Brine | 0 | 366 |
| 2013 | MARION OPERATING CORP | Brine | 0 | 365 |
| 2014 | MARION OPERATING CORP | Brine | 0 | 365 |
| 2015 | MARION OPERATING CORP | Brine | 0 | 365 |
| 2016 | MARION OPERATING CORP | Brine | 0 | 200 |
| 2017 | MARAM ENERGY INC | Brine | 0 | 334 |
| 2018 | MARAM ENERGY INC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -388538150 | 2013-8-13 0:00: | PL | No Violations | |
| 0164263181 | 2013-08-13 | Preliminary Restoration | No Violations | Well is capable of production and is equipt with a motor and a pumping unit. All drilling equiptment has been removed and pits have been filled. Vegetation has been restored. Identification can be found at the well head and the tank battery. Tank battery consists of one 100 barrel tank within an earthen dike. Restoration passes. |
| 0388538150 | 2013-08-13 | Preliminary Restoration | No Violations | This well is in production no violations. |
| 164263181 | 2013-8-13 0:00: | PL | No Violations |
For data sources see[9]