If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24426 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.33,"lon":-82.53,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Miller Township | |
| Operator Name: KNOX ENERGY INC. | |
| Well Pad ID: | |
| Farm/Lease Name: KNOX CO AIRPORT | |
| License Status: Producing | |
| License Date: 2011-01-05 | |
| Spud Date: 2011-06-07 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2011-06-15 | |
| Well Total Depth: 4339.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.330000 | |
| Longitude: -82.530000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2008-12-29 | Proposed Formations:CLINTON THRU TREMPEALEAU, Issued Date:12/29/2008, Expired Date:12/29/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW |
| APP | 2011-01-05 | Proposed Formations:CLINTON THRU TREMPEALEAU, Issued Date:1/5/2011, Expired Date:1/4/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW |
| Reached Total Depth | 2011-06-15 | |
| Completion Report Received | 2011-10-25 | |
| Construction Permit Expires | 2013-01-04 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2011-12-13 | 4246 | 4251 | 24 |
| 4246 | 4251 | 24 | |
| 4246 | 4251 | 24 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2011-07-22 | ACID | 15 | 1420 Gal | 0 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | KNOX ENERGY INC. | 3407.00 | 0.00 | 53 |
| 2012 | KNOX ENERGY INC. | 13655.00 | 0.00 | 366 |
| 2013 | KNOX ENERGY INC. | 21053.00 | 28.00 | 365 |
| 2014 | KNOX ENERGY INC. | 14994.00 | 0.00 | 365 |
| 2015 | KNOX ENERGY INC. | 8167.00 | 18.00 | 365 |
| 2016 | KNOX ENERGY INC. | 2903.00 | 182.00 | 365 |
| 2017 | KNOX ENERGY INC. | 1671.00 | 302.00 | 365 |
| 2018 | KNOX ENERGY INC. | 1310.00 | 127.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | KNOX ENERGY INC. | Brine | 140 | 53 |
| 2012 | KNOX ENERGY INC. | Brine | 194 | 366 |
| 2013 | KNOX ENERGY INC. | Brine | 193 | 365 |
| 2014 | KNOX ENERGY INC. | Brine | 39 | 365 |
| 2015 | KNOX ENERGY INC. | Brine | 54 | 365 |
| 2016 | KNOX ENERGY INC. | Brine | 299 | 365 |
| 2017 | KNOX ENERGY INC. | Brine | 300 | 365 |
| 2018 | KNOX ENERGY INC. | Brine | 400 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0256306044 | 2013-04-09 | Preliminary Restoration | No Violations | I inspected this well today it is in production. |
| 0539203801 | 2011-06-16 | Drill / Deepen / Reopen | No Violations | I witnessed this longstring cement job today. Kilbarger drilling rig is on location and has drilled this new well for Knox Energy. Brian Sterm was on location with Kilbarger and JD was on location with Knox Energy. Petroset completed the two stage cement job. The wells TD was 4339 feet with a 7 7/8 inch bore hole. 4324 feet of new 4 1/2 casing (10.5 pounds / foot) was cemented in with a total of 250 sacks of cement. 150 sacks of class A cement, 2%CaCl was placed across the Clinton Sand and 100 sacks of class A cement, 2% CaCl was tacked in the bottom. The well circulated and the cement job was good. There are no violations noted this date. |
| 2053035461 | 2011-06-09 | Drill / Deepen / Reopen | No Violations | I witnessed the surface cement job today. |
| 2137204091 | 2011-06-09 | Drill / Deepen / Reopen | No Violations | I witnessed drilling operations today. Kilbarger Drilling is currently drilling at a depth of 656 feet. They will TD the surface hole at 680 feet. They plan to cement surface casing tonight if all goes well. There are no violations noted this date. |
| 256306044 | 2013-4-9 0:00:0 | PL | No Violations | |
| 539203801 | 2011-6-16 0:00: | DD | No Violations |
For data sources see[9]