If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24435 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.34,"lon":-82.4,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Pleasant Township | |
| Operator Name: MARAM ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: MCKEE | |
| License Status: Producing | |
| License Date: 2009-02-06 | |
| Spud Date: 2009-06-01 | |
| Spud Drilling Contractor: CAMPHIRE DRILLING | |
| Final Drill Date: 2009-08-14 | |
| Well Total Depth: 2590.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.340000 | |
| Longitude: -82.400000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2009-02-06 | Proposed Formations:CLINTON, Issued Date:2/6/2009, Expired Date:2/6/2010 6:00:00 AM, Drilling unit acres:34.43, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2009-08-14 | LOGGING DEPTHS ARE OFF. JG |
| Construction Permit Expires | 2010-02-06 | LOGGING DEPTHS ARE OFF. JG |
| Completion Report Received | 2011-01-04 | LOGGING DEPTHS ARE OFF. JG |
| Record Last Modified | 2017-10-24 | LOGGING DEPTHS ARE OFF. JG |
For data sources see[2]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 15 | 1000 Bbl | 10000 |
For data sources see[3]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2010 | MARAM ENERGY INC | 7084.00 | 0.00 | 365 |
| 2011 | MARAM ENERGY INC | 7215.00 | 0.00 | 365 |
| 2012 | MARAM ENERGY INC | 4621.00 | 0.00 | 366 |
| 2013 | MARAM ENERGY INC | 3520.00 | 0.00 | 365 |
| 2014 | MARAM ENERGY INC | 4537.00 | 0.00 | 365 |
| 2015 | MARAM ENERGY INC | 4929.00 | 0.00 | 365 |
| 2016 | MARAM ENERGY INC | 4568.00 | 0.00 | 365 |
| 2017 | MARAM ENERGY INC | 3252.00 | 0.00 | 365 |
| 2018 | MARAM ENERGY INC | 2743.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2010 | MARAM ENERGY INC | Brine | 0 | 365 |
| 2011 | MARAM ENERGY INC | Brine | 0 | 365 |
| 2012 | MARAM ENERGY INC | Brine | 0 | 366 |
| 2013 | MARAM ENERGY INC | Brine | 0 | 365 |
| 2014 | MARAM ENERGY INC | Brine | 0 | 365 |
| 2015 | MARAM ENERGY INC | Brine | 0 | 365 |
| 2016 | MARAM ENERGY INC | Brine | 0 | 365 |
| 2017 | MARAM ENERGY INC | Brine | 0 | 365 |
| 2018 | MARAM ENERGY INC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0128722880 | 2009-06-19 | Drill / Deepen / Reopen | No Violations | I witnessed this power mud job today. |
| 128722880 | 2009-6-19 0:00: | DD | No Violations | |
| 1389706784 | 2014-01-14 | Preliminary Restoration | No Violations | This well is in production as a gas well. There is a pump jack but it is not being utilized at this time the well is caring gas without it. |
For data sources see[8]