If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24496 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.34,"lon":-82.3,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Harrison Township | |
Operator Name: HARDESTY PRODUCTION | |
Well Pad ID: | |
Farm/Lease Name: CLUTTER | |
License Status: Producing | |
License Date: 2010-10-14 | |
Spud Date: 2010-10-21 | |
Spud Drilling Contractor: KENNY RICH DRLG | |
Final Drill Date: 2010-12-30 | |
Well Total Depth: 2825.00 ft | |
Configuration: Vertical | |
Latitude: 40.340000 | |
Longitude: -82.300000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-10-14 | Proposed Formations:CLINTON, Issued Date:10/14/2010, Expired Date:10/13/2012 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-12-30 | |
Completion Report Received | 2011-11-10 | |
Construction Permit Expires | 2012-10-13 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-01-20 | 2760 | 2825 | 0 |
2760 | 2825 | 0 | |
2760 | 2825 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-01-04 | H2O | 0 | 79800 Gal | 30000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | HARDESTY PRODUCTION | 0.00 | 0.00 | 0 |
2011 | HARDESTY PRODUCTION | 1990.00 | 694.00 | 0 |
2012 | HARDESTY PRODUCTION | 1080.00 | 433.00 | 366 |
2013 | HARDESTY PRODUCTION | 199.00 | 438.00 | 0 |
2014 | HARDESTY PRODUCTION | 185.00 | 432.00 | 0 |
2015 | HARDESTY PRODUCTION | 97.00 | 235.00 | 365 |
2016 | HARDESTY PRODUCTION | 106.00 | 344.00 | 0 |
2017 | HARDESTY PRODUCTION | 97.00 | 263.00 | 365 |
2018 | HARDESTY PRODUCTION | 100.00 | 177.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | HARDESTY PRODUCTION | Brine | 0 | 0 |
2011 | HARDESTY PRODUCTION | Brine | 70 | 0 |
2012 | HARDESTY PRODUCTION | Brine | 243 | 366 |
2013 | HARDESTY PRODUCTION | Brine | 85 | 0 |
2014 | HARDESTY PRODUCTION | Brine | 283 | 0 |
2015 | HARDESTY PRODUCTION | Brine | 0 | 365 |
2016 | HARDESTY PRODUCTION | Brine | 60 | 0 |
2017 | HARDESTY PRODUCTION | Brine | 70 | 365 |
2018 | HARDESTY PRODUCTION | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-292689216 | 2010-11-2 0:00: | DD | No Violations | |
0292689216 | 2010-11-02 | Drill / Deepen / Reopen | No Violations | I witnessed this surface cement job today. |
1325693809 | 2012-01-04 | Preliminary Restoration | No Violations | Inspected location. There is a pumping unit on the well head and the well is in production. There is good vegetation around the well, the lease road is in good condition, and the well ID is good. |
For data sources see[9]