If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24528 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.49,"lon":-82.41,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Pike Township | |
| Operator Name: BI JOE DEVELOPMENT INC | |
| Well Pad ID: | |
| Farm/Lease Name: TAYLOR TRUST | |
| License Status: Producing | |
| License Date: 2011-08-17 | |
| Spud Date: 2011-09-06 | |
| Spud Drilling Contractor: G & H DRLG | |
| Final Drill Date: 2011-09-16 | |
| Well Total Depth: 4661.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.490000 | |
| Longitude: -82.410000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2011-08-17 | Proposed Formations:BEREA THRU TREMPEALEAU, Issued Date:8/17/2011, Expired Date:8/16/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EOUT |
| Reached Total Depth | 2011-09-16 | |
| Completion Report Received | 2012-02-02 | |
| Construction Permit Expires | 2013-08-16 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2012-02-06 | 4512 | 4554 | 43 |
| 4512 | 4554 | 43 | |
| 4512 | 4554 | 43 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2011-09-22 | ACID | 15 | 4735 Gal | 0 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 0 | 0 | 0 | ||
| 2011 | BI JOE DEVELOPMENT INC | 111.00 | 179.00 | 122 |
| 2012 | BI JOE DEVELOPMENT INC | 1266.00 | 1039.00 | 366 |
| 2013 | BI JOE DEVELOPMENT INC | 615.00 | 842.00 | 365 |
| 2014 | BI JOE DEVELOPMENT INC | 725.00 | 712.00 | 365 |
| 2015 | BI JOE DEVELOPMENT INC | 866.00 | 541.00 | 365 |
| 2016 | BI JOE DEVELOPMENT INC | 872.00 | 541.00 | 365 |
| 2017 | BI JOE DEVELOPMENT INC | 647.00 | 357.00 | 365 |
| 2018 | BI JOE DEVELOPMENT INC | 1101.00 | 346.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | BI JOE DEVELOPMENT INC | Brine | 245 | 122 |
| 2012 | BI JOE DEVELOPMENT INC | Brine | 1123 | 366 |
| 2013 | BI JOE DEVELOPMENT INC | Brine | 725 | 365 |
| 2014 | BI JOE DEVELOPMENT INC | Brine | 853 | 365 |
| 2015 | BI JOE DEVELOPMENT INC | Brine | 922 | 365 |
| 2016 | BI JOE DEVELOPMENT INC | Brine | 903 | 365 |
| 2017 | BI JOE DEVELOPMENT INC | Brine | 833 | 365 |
| 2018 | BI JOE DEVELOPMENT INC | Brine | 615 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -2141978246 | 2011-9-7 0:00:0 | DD | No Violations | |
| -864458455 | 2013-4-10 0:00: | PL | No Violations | |
| 0864458455 | 2013-04-10 | Preliminary Restoration | No Violations | This well is in production. |
| 1161167869 | 2011-09-06 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the surface casing today. Good returns were observed and the cement stayed at the surface. |
| 2141978246 | 2011-09-07 | Drill / Deepen / Reopen | No Violations | I witnessed the BOP test. The BOP passed the required test. |
For data sources see[9]