If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24532 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.33,"lon":-82.39,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Pleasant Township | |
Operator Name: MASON DRILLING INC | |
Well Pad ID: | |
Farm/Lease Name: JOHN JOHNSON | |
License Status: Producing | |
License Date: 2011-09-22 | |
Spud Date: 2011-09-28 | |
Spud Drilling Contractor: G & H DRLG | |
Final Drill Date: 2011-10-08 | |
Well Total Depth: 4738.00 ft | |
Configuration: Vertical | |
Latitude: 40.330000 | |
Longitude: -82.390000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-09-22 | Proposed Formations:CLINTON THRU TREMPEALEAU, Issued Date:9/22/2011, Expired Date:9/21/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:ESPW |
Correction to Well | 2011-09-30 | CORRECTION TO CASING PROGRAM. |
Reached Total Depth | 2011-10-08 | |
Completion Report Received | 2012-01-03 | |
End of Confidential Data | 2012-10-08 | |
Construction Permit Expires | 2013-09-21 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-01-25 | 4420 | 4424 | 13 |
2012-01-25 | 4323 | 4378 | 52 |
4465 | 4470 | 11 | |
4323 | 4378 | 52 | |
4420 | 4424 | 13 | |
4323 | 4378 | 52 | |
2012-01-25 | 4465 | 4470 | 11 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-10-27 | ACID | 15 | 2500 Gal | 0 | Universal Well Services Inc. | 2 3/8" tubing ran to 4376'. Spotted 200 gal acid. 840 gal total slurry volume for this job. Note: log showed top of cement (TOC) behind 4.5" casing at 3778'. Will pull tubing and set perforation balls for next stage. Well History Not Witnessed: On 10/17/11, Perf w/ 3 1/8 slick gun shots, 11holes/shots at 4465-4470; On 10/24/11, 13 shots at 4420'-4424' and 3.5 solid plug set at 4455'; On 10/26/11, 52 shots at 4323'-4378' with 3.5 solid plug set at 4410'. |
2011-10-27 | ACID | 15 | 200 Gal | 0 | Universal Well Services Inc. | Job continued: Pulled approximately 70' of 2 3/8" tubing from 4376'. Dropped 75 perforation balls for this stage. 2160 gal total slurry volume for this job. Note: log showed top of cement (TOC) behind 4.5" casing at 3778'. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | MASON DRILLING INC | 0.00 | 811.00 | 50 |
2012 | MASON DRILLING INC | 73443.00 | 2891.00 | 366 |
2013 | MASON DRILLING INC | 50741.00 | 1870.00 | 365 |
2014 | MASON DRILLING INC | 38224.00 | 1459.00 | 365 |
2015 | MASON DRILLING INC | 30972.00 | 1358.00 | 365 |
2016 | MASON DRILLING INC | 24514.00 | 1264.00 | 365 |
2017 | MASON DRILLING INC | 27900.00 | 1187.00 | 365 |
2018 | MASON DRILLING INC | 30801.00 | 1184.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | MASON DRILLING INC | Brine | 135 | 50 |
2012 | MASON DRILLING INC | Brine | 282 | 366 |
2013 | MASON DRILLING INC | Brine | 258 | 365 |
2014 | MASON DRILLING INC | Brine | 310 | 365 |
2015 | MASON DRILLING INC | Brine | 157 | 365 |
2016 | MASON DRILLING INC | Brine | 240 | 365 |
2017 | MASON DRILLING INC | Brine | 333 | 365 |
2018 | MASON DRILLING INC | Brine | 140 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-941008160 | 2013-3-28 0:00: | PL | No Violations | |
0941008160 | 2013-03-28 | Preliminary Restoration | No Violations | I inspected this well today and found no violations and the well is in production. PRD passed |
1684196276 | 2011-09-29 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the surface casing. Cement returns were observed and stayed at the surface. The cement was verified with 1% Phenolphthalein solution. |
For data sources see[9]