If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24535 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.35,"lon":-82.45,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Pleasant Township | |
Operator Name: MASON DRILLING INC | |
Well Pad ID: | |
Farm/Lease Name: JR PIAR TRUSTEES | |
License Status: Final Restoration | |
License Date: 2017-08-23 | |
Spud Date: 2012-02-08 | |
Spud Drilling Contractor: H & D DRILLING | |
Final Drill Date: 2012-02-17 | |
Well Total Depth: 2541.00 ft | |
Configuration: Vertical | |
Latitude: 40.350000 | |
Longitude: -82.450000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-10-24 | Proposed Formations:CLINTON, Issued Date:10/24/2011, Expired Date:10/23/2013 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2012-02-17 | |
Completion Report Received | 2012-06-26 | |
APP | 2017-08-23 | Proposed Formations:CLINTON, Issued Date:8/23/2017, Expired Date:8/23/2019 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class: |
Record Last Modified | 2017-10-24 | |
Construction Permit Expires | 2019-08-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-07-10 | 2434 | 2458 | 49 |
2012-07-10 | 2474 | 2477 | 7 |
2434 | 2458 | 49 | |
2474 | 2477 | 7 | |
2434 | 2458 | 49 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-03-22 | H2O | 28 | 45063 Gal | 26500 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | MASON DRILLING INC | 1748.00 | 0.00 | 235 |
2013 | MASON DRILLING INC | 2196.00 | 0.00 | 130 |
2014 | MASON DRILLING INC | 3034.00 | 0.00 | 365 |
2015 | MASON DRILLING INC | 2991.00 | 0.00 | 365 |
2016 | MASON DRILLING INC | 1768.00 | 0.00 | 365 |
2017 | MASON DRILLING INC | 3.00 | 0.00 | 365 |
2018 | MASON DRILLING INC | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | MASON DRILLING INC | Brine | 1111 | 235 |
2013 | MASON DRILLING INC | Brine | 1734 | 130 |
2014 | MASON DRILLING INC | Brine | 1242 | 365 |
2015 | MASON DRILLING INC | Brine | 959 | 365 |
2016 | MASON DRILLING INC | Brine | 372 | 365 |
2017 | MASON DRILLING INC | Brine | 0 | 365 |
2018 | MASON DRILLING INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1706875479 | 2017-8-29 0:00: | PW | No Violations | |
-1865694545 | 2017-8-30 0:00: | PW | No Violations | |
-848386388 | 2013-8-28 0:00: | PW | No Violations | |
0848386388 | 2013-08-28 | Production Wells | No Violations | During my follow up inspection for Brittany Hupp found 2 joints of tubing and 2 rods on site called owners to have removed. |
1149603889 | 2019-8-6 0:00:0 | PB | No Violations | |
1380053127 | 2013-08-26 | Preliminary Restoration | No Violations | Well is equipped with a motor and a pumping unit and is capable of production. All drilling equipment has been removed from site and vegetation has been restored to the area. Tank battery consists of one 100 barrel tank and vertical separator within an earthen dike. Identification is present at the tank battery. Restoration passes. |
1429034540 | 2019-8-7 0:00:0 | PB | No Violations | |
1497575643 | 2019-8-9 0:00:0 | PB | No Violations | |
1527037108 | 2019-8-14 0:00: | FR | No Violations | |
1568296244 | 2019-8-8 0:00:0 | PB | No Violations | |
1627300364 | 2012-02-10 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the surface casing today. |
1706875479 | 2017-08-29 | Production Wells | No Violations | This well is permitted to be plugged. This inspection is a pre plug inspection to identify the location and get a good GPS on the well. |
1865694545 | 2017-08-30 | Production Wells | No Violations | Met with surveyor Thomas Wright to get a final survey before they plug this well. |
For data sources see[9]